← Back to search

Padesa Gardens , 33 Ballymakealy Lawns , Celbridge Abbey Celbridge

CONDITIONAL

Planning application 191298

Kildare - Kildare County Council

Proposed Development

a single storey extension to rear and side for additional living space with extended hipped roof over and elevated ridge height to line with highest ridge height of existing house. A change in roof profile. A detached garage to side

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    21 Nov 2019

  2. Decision: CONDITIONAL

    21 Jan 2020

  3. Decision due

    24 Jan 2020

  4. Grant issued

    27 Feb 2020

Application Details

Location
Padesa Gardens , 33 Ballymakealy Lawns , Celbridge Abbey Celbridge
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
0.06 ha

Timeline

Registration Date
21 November 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
21 January 2020
Grant Date
27 February 2020
Permission Expires
26 February 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

96m
18182CONDITIONAL22 Feb 2018

a single storey extension to the side and rear of existing dwelling, all internal modifications and all associated site development works

2 Ballymakealy Lawns , Celbridge , Co. Kildare.

190m
1763CONDITIONAL25 Jan 2017

(a) Demolition of existing fire damaged house and stores; (b) Construction of 6 No. semi-detached four bedroom houses (with optional fifth bedroom at second floor); (c) 1 No. detached four bedroom house (with optional fifth bedroom at second floor); (d) Connection into existing foul sewer drainage and (e) Extension of existing estate road and all associated site development works. Revised by Significant Further Information which consists of reduction in house no.'s from 7 to 6 and revised layout. Increase in site area incorporated into house no. 6

Abbeyfarm Estate , Celbridge Abbey , Celbridge

204m
23651CONDITIONAL14 Jun 2023

the construction of a single storey flat roofed extension to the side and rear of existing detached dwelling and all associated site works

6 Abbey Farm Demesne , Abbey Farm , Celbridge

206m
171468CONDITIONAL21 Dec 2017

modifications to include replacement of 2 No. roof lights with a dormer window to the rear (north west facing elevation) at second floor level to each of the 6 No. 5 bedroom previously approved houses (4 No. semi-detached and 2 No. detached) under application Reg. Ref. 17/0063. All with associated site development works

Abbeyfarm Estate , Celbridge Abbey , Celbridge

214m
201382REFUSED16 Nov 2020

'change of use' of an existing 11sq.m detached garage structure from a domestic garage to an ancillary homebased, one to one, beauty / medical therapy room, involving a maximum of one customer at any one time and all associated site works,

No.2 Springfield Gardens , Celbridge , Co. Kildare

222m
21636N/A10 May 2021

for 'change of use' of an existing 11sq.m detached garage structure from a domestic garage to an ancillary home-based, one to one, beauty/medical therapy room, involving a maximum of one customer at any one time and all associated site works

No. 2 Springfield Gardens , Celbridge , Co. Kildare

235m
2460656CONDITIONAL11 Jul 2024

for two storey extension to the rear, dormer attic extension including modification of existing hip roof to form a side gable with ancillary site works

14 the Park , Abbeyfarm , Celbridge

238m
2460649N/A10 Jul 2024

Development will consist of two storey extension to the rear, dormer attic extension including modification of existing hip roof to form a side gable with ancillary site works

14 the Park Abbeyfarm , Celbridge , Co Kildare

242m
17178CONDITIONAL21 Feb 2017

of 8 No. flood lights, 10 metres in height, to the existing grass running track and 5 No. single storey site buildings, consisting of : Building A – 15sqm storage container storage container; Building B – 31.4sqm canteen.; Building C – 38.1sqm storage container; Building D – 10.6sqm toilet facilities; Building E – 24.5sqm dressing room and toilets. Full PLANNING PERMISSION is also sought for the erection of a new 270sqm single storey indoor training building, 10 No. new flood lights, 10 metres in height, to the existing running track and the relocation of existing site buildings, Building B – 31.4sqm canteen, and Building C – 38.1sqm storage container, Building D – 10.6sqm toilet facilities, and Building E – 24.5sqm dressing room and toilets, and the relocation of the boundary fence along the north east boundary, together with all associated drainage and site works. Revised by Significant Further Information which consists of revisions to the site layout and car parking layout to allay concerns of an objector to the planning application

Ballymakealy Lower , Celbridge , Co. Kildare.

248m
243N/A9 Jan 2024

the erection of a two storey extension to the rear

12 The Park , Abbeyfarm , Celbridge

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?