← Back to search

Ticknevin , Carbury , Co. Kildare

REFUSED

Planning application 191323

Kildare - Kildare County Council

Proposed Development

A 10-year planning permission with a 30-year operational life for development on a site area of 3.23 hectares in the townland of Ticknevin, Carbury, Co. Kildare. The development will consist of up to 1 (one) wind turbine with a tip height of up to 187 metres, and all associated foundations and hardstanding areas, 20 metres of new wind farm road, and all associated underground electrical and communications cabling. This single turbine application forms part of a larger wind farm development located within County Offaly and Kildare with a separate planning application being submitted to Offaly County Council concurrently. The overall development will consist of up to 9 turbines (8 in Offaly and 1 in Kildare) with a tip height of up to 187 metres, and all associated foundations and hardstanding areas, approximately 4,750 metres of new internal access roads, associated drainage and turning areas; upgrade of approximately 3,500 metres of the existing L50062 public road including upgrade of the existing bridge; a new bridge crossing of the Figile River to provide access between Turbine 3 and Turbine 4; a 2,950-metre recreation trail and all associated development to include gravel pathways, a footbridge across the Figile River, a parking area, signage, information boards and outdoor fitness equipment; an off-site electrical substation and a battery energy storage facility; all associated underground electrical and communications cabling to connect the turbines to the substation including approximately 1,550 metres along the R401 Regional Road, a spoil storage area; a permanent meteorological mast up to 110.5 metres high; 2 No. temporary construction compounds; 2 No. temporary blade adapter set-down areas within the wind farm site and at the junction of the R402 and R401 at Rathmore, Edenderry, Co. Offaly; turbine delivery route works including widening of the junction of the R420 and R402 at Ballina, Geashill, Co. Offaly and all associated site development works. This application is accompanied by an Environmental Impact Assessment Report and a Natura Impact Statement

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    28 Nov 2019

  2. Decision due

    31 Jan 2020

  3. Decision: REFUSED

    31 Jan 2020

  4. Appeal submitted

    27 Feb 2020

  5. Grant issued

    23 Sept 2020

  6. Appeal decided: CONDITIONAL

    23 Sept 2020

Application Details

Location
Ticknevin , Carbury , Co. Kildare.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
3.23 ha

Timeline

Registration Date
28 November 2019Other applications received that week
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
31 January 2020
Grant Date
23 September 2020
Permission Expires
22 September 2025

An Coimisiún Pleanála Appeal

Appeal Reference
306748-20
Decision
CONDITIONAL
Submitted
27 February 2020
Decided
23 September 2020

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

68m
191255N/A8 Nov 2019

A 10-year planning permission with a 30-year operational life for development on a total site area of approximately 63.9 hectares in the townlands of Ballykilleen, Shean, Kilcumber, Cloncant, Cushaling and Rathmore, Edenderry, Ballina, Geashill, Co. Offaly and Ticknevin, Carbury, Co. Kildare. The development will consist of up to 9 No. wind turbines (8 in Co. Offaly, 1 in Co. Kildare), with a tip height of up to 187 metres, and all associated foundations and hardstanding areas; approximately 4,750 metres of new internal access roads associated drainage and turning areas; upgrade of approximately 3,500 metres of the existing L50062 public road including upgrade of the existing bridge; a new bridge crossing of the Figile River to provide access between Turbine 3 and Turbine 4; a 2,950 metre recreation trail and all associated development to include gravel pathways, a footbridge across the Figile River, a parking area, signage, information boards and outdoor fitness equipment; and off-site electrical substation and a battery energy storage facility; all associated underground electrical and communications cabling to connect the turbines to the substation including approximately 1,550m along the R401 Regional Road; a spoil storage area; a permanent meteorological mast up to 110.5 metres high; 2 No. temporary construction compounds; 2 No. temporary blade adapter set-down areas, turbine delivery route works and all associated site development works. An Environmental Impact Assessment Report and a Natura Impact Statement has been prepared in respect of the application.

Ticknevin , Carbury , Co. Kildare.

1.9km
22346CONDITIONAL11 Jul 2022

(A) CONVERSION OF EXISTING ATTIC STORAGE SPACE TO HABITABLE ROOM, (B) INCREASED ROOF HEIGHT, (C) 30M2 OF GARDEN SHED AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

6 DERRIES EDENDERRY , CO. OFFALY , R45 R156

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?