"Rose Cottage" , Newtown , Co. Kildare
CONDITIONALPlanning application 19758
Kildare - Kildare County Council
Proposed Development
Construct a single storey extension to the rear and replace existing septic tank with a secondary effluent treatment system also retention permission for a single storey extension to front and a pitched tiled roof over previous flat roof area, with all facilitating and associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
3 Jul 2019
Decision: CONDITIONAL
26 Aug 2019
Decision due
27 Aug 2019
Grant issued
30 Sept 2019
Application Details
- Location
- "Rose Cottage" , Newtown , Co. Kildare.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 0.369 ha
Timeline
- Registration Date
- 3 July 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 26 August 2019
- Grant Date
- 30 September 2019
- Permission Expires
- 29 September 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
sunroom extension to side of existing house and associated site development works
Newtown , Kildare , Co. Kildare.
(1) Retention of 11.83sq.m extension to existing kitchen/dining area (2) Retention of external lobby with stairs to Loft Area over bedroom (on Permission 03/572 Granted 25-06-2003) (3) Retention of 2 no. Sheds 54.88sq.mand 12.1 sq.m and all associated works and services
1083 Newtown , Kildare , Co. Kildare
a new single storey style dwelling house, domestic garage, provision of a new treatment plant and percolation area, new vehicular site entrance and all associated site developments works
Shanacloon , Newtown , Kildare
to construct a new single storey style dwelling house, domestic garage, provision of a new treatment plant & percolation area, new vehicular site entrance and all associated site developments works
Shanacloon , Newtown , Kildare
to construct a new single storey style dwelling house, domestic garage, provision of a new treatment plant & percolation area, new vehicular site entrance and all associated site developments works
Shanacloon , Newtown , Kildare
the construction of a detached bungalow, garage, foul water to on site effluent treatment system and percolation area, surface water to soakaways, vehicular access via existing vehicular entrance and all associated site works. Alteration to condition No. 2 of planning reference 85/754, which restricts the number of dwellings on the overall site to 1,
Newtown , Kildare , Co. Kildare.
1)The construction of a detached 1&1/2 dwelling, foul water to on site effluent treatment system and percolation area, surface water to soakways, vehicular access via existing vehicular entrance and all associated site works. 2)A new recessed vehicular entrance & driveway to serve the existing adjacent dwelling. 3)Alterations to condition no.2 of planning reference 85 754, which restricts the number of dwellings on the overall site to 1
Newtown , Kildare , Co.Kildare
for existing single storey side extension to existing detached single storey bungalow and all associated site works
Shanacloon , Newtown , Co. Kildare.
for a two storey extension to the rear of the existing one storey detached house and all associated site works
Shanacloon , Kildare , Co. Kildare
for the construction of the following; (i) single storey creche (467sq.m.) to include 4no. classrooms, W.C.’s, sleep room, staff room, central kitchen, reception, office, store, an associated outdoor play area (2,724sq.m.), building mounted signage (1.8sq.m.), boundary treatments, 67 no. car parking spaces (inclusive of 6 no. accessible parking spaces) and set down area, covered bicycle stands and outdoor bin storage, (ii) 1 no. 140m x 80m all weather GAA pitch, 6 no. 18m high training lights and poles, all fencing and ball stop netting, 2m wide hard standing looped walkway around the perimeter of pitch and covered bicycle stands (iii) 1no. single storey male and female changing room building (108sq.m.), (iv) bespoke park (9,766sq.m.) to include soft and hard landscaping area, outdoor seating area (179sq.m), playground area (775sq.m), ecology garden (477sq.m), butterfly garden (479sq.m), sensory garden (718sq.m), sensory play area (335sq.m.), (v) coach car park (763sq.m.) to facilitate 2no. 52 seater coaches and 2no. mini coaches and all associated drainage connection works and site development works including ESB substation and switch room, foul and surface water drainage, landscaping, path lighting and boundary treatments, all at
Brallistown , Athy Road , Kildare
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?