Proposed Development
to import non- hazardous soil and stone to lands at Kildoon, Nurney, Co. Kildare. It is intended to raise the levels of land of area 0.89 hectares by circa 1.50m, construct a new recessed entrance, close up existing field entrance & all associated site works,
View the full application file on the council's planning portal →Application Timeline
Application received
2 Oct 2020
Further information requested
23 Nov 2020
Application withdrawn
8 Sept 2021
Application Details
- Location
- Kildoon , Nurney , Co. Kildare
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 1.098 ha
Timeline
- Registration Date
- 2 October 2020
- Status
- DEEMED WITHDRAWN
- Decision
- N/A
- Withdrawn
- 8 September 2021
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
(a) Restoration works to existing cottage to include new slated roof, all windows will be restored and retained; (b) New single storey and storey and a half domestic extensions to side and rear of existing cottage linked to existing cottage by flat roof structure; (c) Domestic garage; (d) Effluent treatment plant, site access and all associated site development works
Pit Lane , Kildoon , Co. Kildare.
extensions and alterations to existing cottage to include: (a) New slated roof, remedial works to all external walls where required, new window and door opes, increase in wallplate height and associated restoration works; (b) New single storey and storey and a half domestic extensions to side and rear of existing cottage; (c) Effluent treatment plant, site access and all associated site development works
Pit Lane , Kildoon , Co. Kildare.
alterations to plans and elevations previously granted under planning ref. no. 17/1009, including the addition of a new extension to rear of existing dwelling, change of window design on ground floor front elevation, change of window sizes on first floor side elevation and all ancillary site works.
Pit Lane , Kildoon , Co. Kildare.
To import soil and stone (European Waste Catalogue 17 05 04) to lands at Nurney Bog, Kildare, Co. Kildare. It is intended to raise the levels of land by circa 1.50m, use existing recessed entrance and all associated siteworks.
Nurney Bog , Kildare , Co. Kildare
for a one storey house, effluent treatment system and polishing filter, recessed entrance and all associated siteworks
Nurneybog , Nurney , Co. Kildare.
To import non-hazardous soil and stone to lands at Nurneybog. It is intended to raise the levels of land of area 0.76 hectares by circa 1.0m, use existing recessed entrance and all associated siteworks
Nurneybog , Kildare , Co. Kildare.
(1) Retention permission for a 1.5 storey dwelling as constructed; (2) Planning permission to complete the construction of the dwelling, demolish existing chimney stack and all associated siteworks, previously granted permission under planning references 07/2097 and 08/1430
Nurney Bog , Kildoon , Nurney
for 1) to build a one storey extension to the rear of an unfinished 1.5 storey house, previously granted planning permission under planning reference numbers 07/2097 & 08/1430 and retention permission and permission to complete construction under planning reference number 20/788. 2) Planning permission for a one storey detached garage. 3) Planning retention permission for removal of 1 ground floor window and 1 first floor window, both on the north west elevation, and all associated site works
Nurneybog , Kildoon , Nurney
the construction of a 1 & 1/2 storey dwelling, detached garage, foul water to a septic tank and percolation area, surface water to soakaways, recessed vehicular entrance and all associated site works
Kildoon , Nurney , Co. Kildare
the construction of a split level dwelling, detached garage, foul water to on site effluent treatment system and percolation area, surface water to soakaways, recessed vehicular entrance and all associated site works
Kildoon , Nurney , Co. Kildare.
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?