Proposed Development

proposed extension to the Distribution Centre (overall external height approx. 19m) will comprise of a: Warehouse Extension (approx. 11,824 sqm) with dock levellers on the north-eastern and south-western elevations; Main Office Extension over two storeys (approx. 386 sqm); Despatch and Extension Goods-In Office over two storeys (Approx. 352 sqm); A new one storey Transport Office (approx. 123 sqm); and Vehicle Maintenance Unit (VMU) Extension (approx. 100 sqm). The gross floor area of the premises will increase from 29,106 sqm to 41,891 sqm, an increase of 12,785 sqm. The existing two storey internal Ancillary Office A and Battery Charging Area will be demolished to allow for the construction of the warehouse extension. Additional new vehicle parking areas will be provided including a new HGV parking area located to the east of the Distribution Centre and a new additional car parking area to the south of the Distribution Centre, on the south side of the R148. The development will also consist of an additional Sprinkler Tank (approx. 54 sqm) and External Cage Storage with a maintenance shed (approx. 64 sqm). The existing vehicle parking area will be reconfigured and new vehicle parking areas provided for an additional: 172 no. car parking spaces (including 12 no. electric car charging points and an additional 15 no. universally accessible bays); 175 no. HGV trailer parking spaces; 27 no. tractor (HGV cab) parking spaces; and 128 no. bicycle parking spaces and associated infrastructure. A total of 24 motorcycle parking spaces will also be created. The development will involve minor alterations to the existing entrance at R148 which will provide vehicular, pedestrian and cyclist access and egress to the Distribution Centre. An additional new vehicular, pedestrian and cyclist access and egress will be provided off R148 to a new car parking area to the south of the main Distribution Centre site. A pedestrian crossing over this road will be provided connecting the southern car park to the main site. The associated site and infrastructural works include provision for all landscaping works; boundary treatment; internal roads and footpaths; PV panels and electrical services. The proposed development will involve modifications to a previous permission - Planning Register Reference 02/1561. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with this planning application,

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    2 Oct 2020

  2. Further information requested

    26 Nov 2020

  3. Further information received

    7 May 2021

  4. Decision due

    1 Jul 2021

  5. Decision: CONDITIONAL

    1 Jul 2021

  6. Grant issued

    13 Aug 2021

Application Details

Location
Boycetown , Kilcock , Co. Kildare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
15.06 ha

Timeline

Registration Date
2 October 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
1 July 2021
Grant Date
13 August 2021
Permission Expires
12 August 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

142m
23794CONDITIONAL19 Jul 2023

Construct a single storey extension on the Eastern and Southern sides of the existing Garage/Workshop building and to construct a new canteen in part of the existing store at mezzanine floor level with a new externally cladded fire escape stairs on the Northern (rear) Elevation in the existing building located on the Northern corner of the site and all associated site works and services

Boycetown , Kilcock , Co.Kildare

186m
2560690CONDITIONAL19 Jun 2025

for the construction of a foul pumping station and all associated site and infrastructural works including: An underground wastewater pump station (a wet well 7.2m below ground); A welfare building of 6.25 sq.m and 3m in height; 472m of 125mm OD rising main along the R148, 250m of gravity sewer along the R148, Gravity sewer connection to the south of the site, Watermain connection, An underground emergency storage tank, with capacity of approximately 132m3, 7.2m below ground, Above ground lifting gantry, Valve and flowmeter chambers, A chemical dosing facility for odour control, Passive carbon unit, Kiosks, Above ground surge vessel (<13 m3), Perimeter Landscaping, fencing and re use of the existing vehicular access off the R148. All associated site development works. The proposed development includes all necessary ancillary pipework and manholes, diversion of existing utilities; new power supply and water connection for the pump station, ducting, mechanical and electrical services, plant, instrumentation, automation, controls and equipment. It also includes all associated site development works, hard standing areas and access and site drainage. The proposed development includes works on lands owned by Kildare County Council to facilitate access and drainage infrastructure.

Site to the south of R148 , east of R158 abutting the M4 Junction 8 roundabout at Boycetown , Kilcock

375m
21311037REFUSED6 Aug 2021

STRATEGIC HOUSING DEVELOPMENT (ABP DECISION): Demolition of detached, vacant cottage(gfa 69sqm) and the construction of 298 residential units (181 no. dwellings and 117 no. apartments), childcare facility and foul pumping station along with associated ancillary works and site works.

Boycetown , Kilcock , Co. Kildare.

430m
22314564N/A7 Sept 2022

Strategic Housing Development at this site to south of the R148 and east of the R158 abutting the M4 Junction 8 roundabout, Boycetown, Kilcock, Co. Kildare (9.75 hectares). The proposed development (30,839 sqm GFA) will consist of the demolition of a detached, vacant cottage (gfa 69 sqm) and the construction of 272 residential units (149 No. houses, 65 apartments and 58 duplexes), childcare facility and foul pumping station along with associated ancillary works and site works. The 149 No. dwellings consist of: 40 No. 4-bed 2-storey houses, 8 No. 4-bed 3 storey houses, 90 No. 3-bed 2-storey houses,11 No. 2-bed 2-storey houses. The proposed apartments and duplexes are provided in 7 No. blocks ranging in height from 3 to 4 storeys, with the exception of 1 No. Duplex Block (Type N1), which is a 3-storey, end of terrace unit. Block A and Block B contain Rooftop terraces at 4th floor level. The Duplex Blocks (Type J1, J2, J3, J4, K1, L1, M1, N1) are all 3-storey and contain 58 units divided as follows: 6 No. 1-bed ground floor apartments units, 23 No. 2-bed ground floor apartment units, 1 No. 2-bed duplex unit (two-storey unit), 25 No. 3 bed duplex units (two-storey units), 3 No. 4-bed duplex units (two-storey units). The 65 apartments are located within Blocks A, B, C and D divided as follows: 17 No. 1-bed units, 37 No. 2-bed units, 11 No. 3-bed units. Block D also contains a childcare facility (gfa 526.2 sqm) and includes a dedicated outdoor play area (c. 210 sqm). Ancillary works including 1 No. vehicular entrance off the R148 to the north and 1 No. vehicular entrance off the R158 to the west, a spine road which will link with the permitted spine road on the adjoining lands to the south-east under PL09.306826, internal roads, footpaths, cycle lanes, car parking (465 No. spaces), cycle storage/parking (426 No. spaces), 2 No. bus stops, bin storage, public open space, hard and soft landscaping, natural play area, play equipment, boundary treatments, public lighting, 3 No. substations (14 sqm each) and controlled pedestrian crossing on the R148. All associated site and infrastructural works including underground wastewater pump station (a wetwell); welfare building 6.25sqm and 3 m in height; 472m of 125mm OD rising main and 250m of gravity sewer along the R148; an underground emergency storage tank, capacity 230m³ approx., above ground lifting gantry; valve and flowmeter chambers; a chemical dosing facility for odour control; Passive Carbon Unit;

Boycetown , Kilcock , Co. Kildare.

434m
2561306CONDITIONAL19 Nov 2025

The proposed Phase 1 development will consist of: o 93 no. residential units, consisting of 55 no. houses, 16 no. duplex apartments, and 22 no. apartments, to be provided as follows: 21 no. 3 bed two storey mid-terrace houses House Type R2c-Mid); 15 no. 3 bed two storey end-terrace houses (House Type R2c-End); 11 no. 3 bed two storey end-terrace houses (House Type 6c); 6 no. 3 bed two storey semi-detached houses (House Type N1); 2 no. 4 bed two storey semi-detached houses (House Type O1); 16 no. 1 bed duplex apartments (Types 4H1a & 4H1b) provided within 4 no. two storey duplex buildings; 22 no. apartments (10 no. 1 bed and 12 no. 2 bed) located within a part 4 no. storey / part 5 no. storey apartment block, all provided with private balconies, terraces, or gardens. A childcare facility (with a Gross Floor Area of 393 sq.m), with associated play area, at ground floor level of the apartment block; A total of 172 no. surface car parking spaces are proposed to serve the residential units, visitor parking and the childcare facility. A total of 90 no. secure long-stay cycle parking spaces are proposed for residents and the childcare facility, together with 27 no. short-stay/visitor cycle parking spaces. The development includes cycle paths, footpaths, and internal roads, with proposed infrastructure and access points provided up to the application site boundary to facilitate potential future connections to adjoining lands; Provision of new vehicular accesses off the R148 and the R158, a new footpath along the R148, and the provision of a link street from the R158 to the boundary of the adjoining Bawnogue Park residential development to the south east of the subject site; The development includes foul and surface water drainage, including attenuation system, bin stores, public and communal open space, public lighting, landscaping and boundary treatment works, services and all associated and ancillary site works and development. Revised by Significant Further Information which consists of: Amendments to Phase 1 house, duplex apartment and apartment types, including the introduction of a new three-storey end-of-terrace house (House Type X) and the replacement of Duplex Type 4H1 with revised Types 4H1c and 4H1d. Amendments to the apartment building include a further setback at fourth-floor level, internal reconfiguration of floorplans including the omission of the 2-bed 3-person apartment type, enhanced façade articulation, and revisions to material treatment

Site at Boycetown Kilcock Co. Kildare. The application site is located to the south of the R148 , east of the R158 north east of the M4 Junction 8 roundabout to the west of Boycetown Court , and north of Bawnogue Park residential development (current

441m
17116CONDITIONAL7 Feb 2017

the construction of a lean-to porch to front door of existing dwelling

8 Boycetown Court , Kilcock , Co. Kildare.

470m
18406N/A11 Apr 2018

erecting railings and gates to front and part side boundaries

29 Boycetown Court , Boycetown , Kilcock

473m
2561347CONDITIONAL28 Nov 2025

for development on c.5.47 ha site. This application forms Phase 2 of a 3 phase residential development on an overall landholding with an area of c.9.29 ha. The proposed Phase 2 development will consist of: 95 no. 2 storey houses to be provided as follows: • 7 no. 2 bed two storey mid & end-terrace houses (House Type T1c); • 32 no. 3 bed two storey mid-terrace houses (House Type R2c-Mid); • 15 no. 3 bed two storey end-terrace houses (House Type 6c); • 21 no. 3 bed two storey end-terrace houses (House Type R2c-End); • 4 no. 3 bed two storey semi-detached houses (House Type House Type N1); • 16 no. 4 bed two storey semi-detached houses (House Type O1). o A total of 151 no. surface car parking spaces are proposed to serve the houses. A total of 78 no. secure long-stay cycle parking spaces are proposed for residents; o The development includes cycle paths, footpaths, and internal roads, with proposed infrastructure and access points provided up to the application site boundary to facilitate potential future connections to adjoining lands; o Provision of new vehicular accesses off the R148 and the R158, a new footpath along the R148, and the provision of a link street from the R158 to the boundary of the adjoining Bawnogues Park residential development to the south east of the subject site; o The development includes foul and surface water drainage, including attenuation system, bin stores, public and communal open space, public lighting, landscaping and boundary treatment works, services and all associated and ancillary site works and development

Site at Boycetown Kilcock Co. Kildare. The application site is located to the south of the R148 , east of the R158 north east of the M4 Junction 8 roundabout to the west of Boycetown Court and , north of Bawnogues Park residential development (curren

478m
2561453N/A18 Dec 2025

the construction of a single storey extension to the side and a storey and a half extension to the rear of an existing dwelling with internal and external alterations; for the partial demolition of the remains of an existing outbuilding; for the decommissioning of an existing septic tank and percolation area and the provision of a replacement wastewater treatment system and percolation area; for the provision of a new vehicular entrance and removal of an existing entrance; for the relocation of an existing agricultural barn structure; for a new private well; and all associated site development works. The proposed development is within the curtilage of a protected structure (RPS No.023-007).

Boycetown , Kilcock , Co. Kildare

481m
2561459N/A18 Dec 2025

the construction of a single storey extension to the side and a storey and a half extension to the rear of an existing dwelling with internal and external alterations; for the partial demolition of the remains of an existing outbuilding; for the decommissioning of an existing septic tank and percolation area and the provision of a replacement wastewater treatment system and percolation area; for the provision of a new vehicular entrance and removal of an existing entrance; for the relocation of an existing agricultural barn structure; for a new private well; and all associated site development works. The proposed development is within the curtilage of a protected structure (RPS No.023-007)

Boycetown , Kilcock , Co. Kildare

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?