Gilltown , Kilcullen , Co. Kildare

CONDITIONAL

Planning application 201182

Kildare - Kildare County Council

Proposed Development

an agricultural access gate to be constructed beside the existing domestic entrance gate to my property and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    9 Oct 2020

  2. Decision: CONDITIONAL

    30 Nov 2020

  3. Decision due

    3 Dec 2020

  4. Grant issued

    26 Jan 2021

Application Details

Location
Gilltown , Kilcullen , Co. Kildare.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
182 ha

Timeline

Registration Date
9 October 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
30 November 2020
Grant Date
26 January 2021
Permission Expires
25 January 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

49m
2560146CONDITIONAL17 Feb 2025

for to construct a one storey, three bedroom bungalow, a detached single storey double garage, a septic tank and percolation area, and all associated site works

Gilltown , Kilcullen , Kildare

72m
2360413REFUSED25 Nov 2023

for to construct a two storey four bedroom dwelling, a detached single storey double garage, a septic tank and percolation area, and all associated site works

Gilltown , Kilcullen , Kildare

76m
2561253CONDITIONAL4 Nov 2025

for proposed alterations to previously granted planning application Pl. Ref: 25/60146. Alterations to consist of: changing proposed hipped roofs on house and garage to gable roofs, extending the proposed dwelling’s footprint by 74m², and all associated site works

Gilltown , Kilcullen , Kildare

147m
17685CONDITIONAL12 Jun 2017

construction of a new three bedroom bungalow property with garage structure to the rear of the dwelling, new waste water treatment plant, alterations to existing site entrance and all the associated site works. Revised by Significant Further Information which consists of the removal of condition no. 5 of planning file reference 73/436 relating to the sterilisation

Gilltown , Kilcullen , Co. Kildare

147m
201305N/A30 Oct 2020

for the previously granted permission, reference number 17685, relating to alterations and repositioning of the construction of a bungalow and garage, septic tank and percolation area, alterations to existing site entrance and all the associated site works

Gilltown , Kilcullen , Co. Kildare.

152m
20859N/A5 Aug 2020

sought for the previously granted permission, reference number 17/685, relating to minor alterations and the repositioning on site of the construction of a new three bedroom bungalow property with garage structure to the rear of the dwelling, new waste water treatment plant, alterations to existing site entrance and all the associated site works

Gilltown , Kilcullen , Co. Kildare.

163m
201341CONDITIONAL9 Nov 2020

sought for the previously granted permission reference number 17/685, relating to alterations and the repositioning of the construction of a bungalow and garage, septic tank and percolation area, alterations to existing site entrance and all the associated site works

Gilltown , Kilcullen , Co. Kildare.

274m
201153N/A5 Oct 2020

for an agricultural access gate to be constructed beside the existing domestic entrance gate,

Gilltown , Kilcullen , Co. Kilcullen

399m
2460855CONDITIONAL30 Aug 2024

for (a) retention of a single storey extension to the rear of the existing single storey dwelling which consists of a dining room, living room and utility room and (b) retention of the location of the site entrance along with all site development and facilitating works

Gilltown , KIlcullen , Co. Kildare

408m
2560285N/A19 Mar 2025

for the construction of a single storey rear extension to existing detached single storey bungalow and all associated site works

Gilltown , Kilcullen , Co. Kildare

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?