Planning application 201200

Kildare - Kildare County Council

Proposed Development

A family flat on the north side of my house. The construction of a one bed 51.3m² family flat as a residence for my parents, and all associated site works,

View the full application file on the council's planning portal →

Application Details

Location
Blackdown , Kilteel , Co. Kildare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council

Timeline

Registration Date
14 October 2020
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

30m
2360524CONDITIONAL21 Dec 2023

A. Removing existing blockwork from previously granted dwelling which was partially constructed, Constructing a new split level two storey dwelling, B. Constructing a single storey detached domestic garage and home office, C. New sewer connection to existing communal wastewater treatment system (Licence Ref. No. WP 218-05) D. New vehicular entrance, and associated site works

Blackdown , Kilteel , Naas

37m
201240CONDITIONAL20 Oct 2020

to construct a family flat on the north side of my house. The development will consist of a one bed 51.3m² family flat as a residence for my parents, and all associated site works

Blackdown , Kilteel , Co. Kildare

37m
211784N/A17 Dec 2021

(a) Removing existing blockwork from previously granted dwelling which was partially constructed. Constructing a new split level two storey dwelling. (b) Constructing a single storey detached domestic garage and home office. (c) New sewer connection to existing communal wastewater treatment system (Licence Ref. No. WP 218-05). (d) New vehicular entrance, and associated site works

Blackdown , Kilteel , Co. Kildare.

54m
18285CONDITIONAL16 Mar 2018

the construction of a new 1.5 storey, 3 bedroom, dormer type bungalow dwelling with new recessed site entrance, on-site waste water treatment system and percolation rainwater harvesting system and soakaways, new bored well and all associated site works, services, landscaping and boundary treatments

Blackdown , Kilteel , Co. Kildare.

79m
2388CONDITIONAL2 Feb 2023

a single storey double garage with attic storage space of 47.5sqm, to the front and side of the existing property

Blackdown , Kilteel , Co. Kildare

101m
18546CONDITIONAL10 May 2018

development which consists of the following: Changes to windows on ground floor rear elevations. Addition of dormer window and Velux window to front elevation roof pitch. Addition of dormer window to rear elevation roof pitch. Construction of 2 storage units in rear curtilage. Construction of stone walls on the site boundary. Construction of stones featured seating areas. Erection of gates to front entrance. Surfaced playing areas

Yellow House , Blackdown , Kilteel

135m
19535CONDITIONAL14 May 2019

the construction of a 4 bedroom bungalow, 5.77m to ridge along with sewerage treatment system to comply with EPA:2009 together with new entrance and all associated site works

Kilteel , Naas , Co. Kildare.

147m
171277CONDITIONAL14 Nov 2017

Extension of Duration of Planning Ref. No. 12/769 - a bungalow, access road with connection to existing effluent treatment system ( Licence Ref No. WP 218/05 ) and associated site works

Blackdown , Kilteel , Naas

148m
20990CONDITIONAL1 Sept 2020

for the construction of a single storey rear extension, permission for the removal of existing roof and permission to construct new one and half story dormer roof and dormer floor extension, permission to amend front façade of existing house and all associated site works,

Kilteel Lower , Kilteel , Co Kildare

149m
18974REFUSED13 Aug 2018

Construction of a 5 bedroom dormer bungalow with integrated double garage 8.15 m to ridge along with sewerage treatment system to comply with EPA:2009 together with new entrance and all associated site works

Kilteel , Co. Kildare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.