Taghadoe , Maynooth , Co. Kildare
CONDITIONALPlanning application 201243
Kildare - Kildare County Council
Proposed Development
the construction of a single storey bungalow, domestic garage, recessed entrance, secondary effluent treatment system and all associated site works
Application Timeline
Application received
20 Oct 2020
Further information requested
7 Dec 2020
Further information received
25 May 2021
Decision due
21 Jun 2021
Decision: CONDITIONAL
21 Jun 2021
Grant issued
25 Aug 2021
Application Details
- Location
- Taghadoe , Maynooth , Co. Kildare
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 0.642 ha
- Floor Area
- 285 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 20 October 2020
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 21 June 2021
- Grant Date
- 25 August 2021
- Permission Expires
- 24 August 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
(a) Retention permission for change of use of existing farm building to office use with canteen and WC. (b) Planning permission for new recessed vehicular entrance. Existing entrance to be closed up. (c) Planning permission for new 630sqm shed for agricultural use. (d) Planning permission for new proprietary wastewater treatment system and sand filter percolation area. (e) Planning permission for new surface water management works. Revised by Significant Further Information which consists of submission of a Natura Impact Statement
Taghadoe , Maynooth , Co. Kildare.
construction of a two storey detached type house, one and a half storey detached type domestic garage with loft store, effluent treatment system, and all ancillary siteworks
Donaghstown , Maynooth , Co. Kildare.
for the construction of a solar PV development and an ‘under the fence’ transformer compound on a ca. 180ha site consisting of: I. Solar PV panels laid out in arrays across the Site; II. 39 No. inverter units (ca. 2.9m (h) x ca. 6.1m (l) and 2.4(w)); III. 1 No. control room structure (5m (h) x 15.3m (l) and 3.7m (w)); IV. 1 No. transformer unit (ca. 6m x ca. 4m) and associated bund; V. Security fencing around the ‘under the fence’ transformer compound (2.65m high); VI. Electrical and communications cabling; VII. Pole-mounted security cameras; VIII. Perimeter security fencing (2m high) and security gates; IX. Upgrade of 3 No. existing Site entrances; X. Development of 2 No. new Site entrances; XI. 3 No. temporary construction compounds; XII. Internal access tracks; and, XIII All associated ancillary development, landscaping and reinstatement works
Cowanstown Kealstown Bryanstown Dowdstown , Donaghstown Posseckstown Taghadoe Toolestown , - Windgates Rowanstown and Roosk
for the construction of infrastructure, and associated development, at the existing and planned expanded substation, comprising:- •construction of a new 220 kV Gas Insulated Switchgear (GIS) building (83.5m long x 18.5m wide (25.1m including staircases), 17m in height) (1,637 sqm); • construction of a new 110kV GIS building (68.8m x 15.4m, (22m including staircases) 15m in height) (1,138sqm); • both of the GIS Buildings will have 8 no. associated air rods on each of the roofs (3m in height); • construction of 4 no. 220/110kV power transformers to include connections to the new GIS buildings; • 2 no. 220kV and 1 no. 110kV line/cable interface towers and associated removal of 3 no. existing end masts; • 3 no. lightning masts (height 22m); • cable connections to the 220kV GIS building; • new 4.5m wide internal access road and 10 no. new permanent car parking spaces; • associated site excavation, infrastructural and site development works, and above and below ground boundary treatment and landscaping including palisade fencing (2.6m height), lighting and surface water drainage and foul water tank; • associated demolition of existing bungalow farmhouse and agricultural buildings (1,111.6m2 floorspace total) to facilitate the proposed development; and • all ancillary and associated temporary works to facilitate the development at the construction stage, including construction access track, temporary construction compound / site laydown areas and cable connection for the existing Derryiron-Maynooth 110kV overhead line. Planning permission is sought for a period of 10 years. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.
Maynooth 220kV Substation , Taghadoe , Co. Kildare
with the consent and approval of the Electricity Supply Board (ESB), for the construction of a new 220 kV Gas Insulated Switchgear (GIS) building (83.5m long x 18.5m wide (25.1m including staircases) 17m in height) (1,637 sqm); construction of a new 110kV GIS building (68.8m x 15.4m, (22m including staircases) 15m in height) (1,138 sqm); both of the GIS Buildings will have 8 no. associated air rods on each of the roofs (3m in height); construction of 4 no. 220/110kV Power Transformers to include connections to the new GIS buildings, 2 no. 220 kV and 1 no. 110kV line / cable interface towers and associated removal of 3 no. existing end masts, 3 no. lightning masts (height 22m) and cable connections to the 220 kV GIS Switchboard building; new internal access road and 10 no. new permanent car parking spaces; associated site excavation, infrastructural and site development works above and below ground, boundary treatment and landscaping, including palisade fencing (2.6m height), lighting and surface water drainage and foul water tank; temporary use of the land associated with the existing farmhouse for the construction compound; and all ancillary and associated temporary works to facilitate the development at the construction stage, including construction access track, 2 no. construction compounds and cable connection for the Derryiron – Maynooth 110kV overhead line. Temporary construction and permanent access will be off the L5037. Planning permission is sought for a period of 10 years. A Natura Impact Statement will be submitted to the Planning Authority with the application
Maynooth 220kV Substation , Taghadoe , Co. Kildare
for construction of a new 220 kV Gas Insulated Switchgear (GIS) building (83.5m long x 18.5m wide (25.1m including staircases), 17m in height) (1,637 sqm); construction of a new 110kV GIS building (68.8m long x 15.4m wide (22m including staircases), 15m in height) (1,138 sqm); both of the GIS Buildings will have 8 no. associated lightning protection spikes / rods on each of the roofs (3m in height); construction of 4 no. 220/110kV power transformers to include connections to the new GIS buildings; 2 no. 220kV and 1 no. 110kV line/cable interface towers and associated removal of 3 no. existing end masts and overhead line and cable works; 3 no. lightning masts (height 22m); cable connections to the 220kV GIS and 110kV buildings; new 4.5m wide internal access road and 10 no. new permanent car parking spaces; associated site excavation, infrastructural and site development works, and above and below ground boundary treatment and landscaping including palisade fencing (2.6m height), lighting and surface water drainage and foul water tank; associated demolition of existing bungalow farmhouse and agricultural buildings (1,112sqm floorspace total) to facilitate the proposed development; and all ancillary and associated temporary works to facilitate the development at the construction stage, including construction access track, temporary construction compound / site laydown areas and cable connection for the existing Derryiron-Maynooth 110kV overhead line. Planning permission is sought for a period of 10 years. A Natura Impact Statement will be submitted to the Planning Authority with the application
Maynooth 220kV Substation , Taghadoe and Windgates , Co. Kildare
increasing the number of children catered for from 10 to 14 in line with Early Childhood Ireland ECCE Scheme
Acres of Fun Playschool , Taghadoe , Maynooth
for construction of infrastructure, and associated development, at the existing and planned expanded substation, comprising:- •construction of a new 220 kV Gas Insulated Switchgear (GIS) building (83.5m long x 18.5m wide (25.1m including staircases), 17m in height) (1,637 sqm); • construction of a new 110kV GIS building (68.8m x 15.4m, (22m including staircases) 15m in height) (1,138sqm); • both of the GIS Buildings will have 8 no. associated air rods on each of the roofs (3m in height); • construction of 4 no. 220/110kV power transformers to include connections to the new GIS buildings; • 2 no. 220kV and 1 no. 110kV line/cable interface towers and associated removal of 3 no. existing end masts; • 3 no. lightning masts (height 22m); • cable connections to the 220kV GIS building; • new 4.5m wide internal access road and 10 no. new permanent car parking spaces; • associated site excavation, infrastructural and site development works, and above and below ground boundary treatment and landscaping including palisade fencing (2.6m height), lighting and surface water drainage and foul water tank; • associated demolition of existing bungalow farmhouse and agricultural buildings (1,111.6m2 floorspace total) to facilitate the proposed development; and • all ancillary and associated temporary works to facilitate the development at the construction stage, including construction access track, temporary construction compound / site laydown areas and cable connection for the existing Derryiron-Maynooth 110kV overhead line. Planning permission is sought for a period of 10 years. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
Maynooth 220kV Substation , Taghadoe , Co. Kildare
for (A) increased in ridge height on house previously granted planning permission under file ref no.23/54, 17/519 & 12/251 and (B) Retention Permission for first floor accommodation for residential use with 4 no. roof lights to the rear (west) elevation and 1 no. roof light to front (east) elevation
Taghadoe , Maynooth , Co. Kildare
for the development consisting of completion of single storey type house, garage for domestic use and proprietary wastewater treatment system presently under construction, all granted planning permission under file ref no. 12/251 & extension of duration granted under file ref no. 17/519.