Kilcullen Road , Naas , Co. Kildare

CONDITIONAL

Planning application 201338

Kildare - Kildare County Council

Proposed Development

for works carried out to date and Planning Permission for proposed works to a temporary construction site entrance and access road off the R448 Kilcullen Road, Naas, to facilitate temporary access to the Bellingsfield Residential Development, Piper’s Hill, Killashee, Naas, Co. Kildare, previously granted permissions under Planning Reference: 16/635 and 19/178. Retention Permission is sought for: A temporary construction vehicle access route from R448 Kilcullen Road, Naas temporary entrance, connecting to an existing farm haul road through lands at Killashee to access the Bellingsfield Residential Development Zone 6. A temporary stoned set back and 15m recessed entrance on R448 Kilcullen Road, Naas to facilitate construction vehicles at entrance gates. A temporary 2.4m high paladin entrance gates and fencing to R448 Kilcullen Road, Naas. Permission is sought for: Completion of the temporary stoned set back and 15m recessed entrance with temporary hardstanding. Use of the existing farm haul road for temporary access to the Bellingsfield Residential Development. Proposed appropriate signage and bollards/cones at the temporary construction entrance. The temporary relocation of the existing speed limit signs on R448 Kilcullen Road, Naas. These signs will revert to their original location upon completion of the construction phase of Bellingsfield Residential Development in March 2022. Proposed temporary traffic signage on the R448 Kilcullen Road, Naas for the duration of the use of the construction entrance. Removal of all temporary works and reinstatement of existing boundaries, surfaces, and hedgerows relating to this application upon completion of the construction phase of Bellingsfield Residential Development in March 2022. REVISED BY SIGNIFICANT FURTHER INFORMATION which consists of the relocation further north of the temporary site entrance to R448 Regional Road, the omission of any proposed changes to existing speed limits on R448 Regional Road, approximately 120m of new temporary haul road, removal of existing entrance and section of haul road and associated temporary boundary changes and landscaping to new entrance location

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    9 Nov 2020

  2. Further information requested

    7 Jan 2021

  3. Further information received

    8 Apr 2021

  4. Decision: CONDITIONAL

    13 May 2021

  5. Appeal submitted

    9 Jun 2021

  6. Application withdrawn

    12 Jul 2021

Application Details

Location
Kilcullen Road , Naas , Co. Kildare.
Applicant
N/A
Application Type
RETENTION
Planning Authority
Kildare County Council
Site Area
0.84 ha

Timeline

Registration Date
9 November 2020
Status
WITHDRAWN
Decision
CONDITIONAL
Decision Date
13 May 2021
Withdrawn
12 July 2021

An Coimisiún Pleanála Appeal

Appeal Reference
310468-21
Submitted
9 June 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

437m
23127CONDITIONAL14 Feb 2023

the installation/erection of 1 No. 7m high and 4 No. 6m high flagpoles (two No. with vertical banner type and three No. with standard flag configurations) together with all associated site development works. There are no works proposed to the existing Protected Structure (Hotel) within the grounds of Killashee House Hotel as part of this planning application

The Killashee House Hotel & Spa , Killashee , Naas

516m
201567CONDITIONAL18 Dec 2020

constructing an all-weather sports pitch with a 2.8m high perimeter fence, 1.1m high spectator safety rail fence, 15.2m high floodlights, covered team technical area, and all associated ancillary site-works

Killashee House Hotel , Killashee , Naas

516m
24359CONDITIONAL15 Nov 2024

for retention of a domestic garage and a covered pergola type structure to the side / rear of the existing dwelling and all associated site works. Planning permission is sought for a single storey extension to the front / side of the existing dwelling and all associated site works

11 The Green , Bellingsfield , Naas

525m
23627CONDITIONAL9 Jun 2023

single storey accommodation to include an administration building, a gear room, a home changing room, an away changing room, a referee room, an analysis room, a pitch equipment store, and all associated ancillary site works

Killashee House Hotel , Killashee , Naas

606m
23131CONDITIONAL14 Feb 2023

retention permission is sought for modifications to the fenestration and facade treatment of the existing building and minor internal reconfiguration of layouts from that as permitted under Reg. Ref. 03/1214. Permission is now sought for development comprising a change of use of the existing building from residential to office use ancillary to the Killashee House Hotel. The proposed development also comprises a minor internal alteration by way of addition of a dividing screen at ground floor level in the existing dining room. 5 no. car parking spaces are proposed including 1 no. accessible parking space and 1 no. EV charging point. The proposal includes all site services, drainage works and ancillary site development works. There are no works proposed to the existing Protected Structure within the grounds of Killashee House Hotel as part of this planning application

The Gate Lodge , Killashee House Hotel & Spa , Killashee

651m
22213REFUSED28 Feb 2022

for the construction of 3 no. detached two-storey dwellings each with their own septic tank, percolation area, and entrance including all associated site works

Kilashee , Naas , Co. Kildare.

662m
2460092CONDITIONAL7 Feb 2024

for the replacement of 4no. existing pedestrian crossings with raised crossings complete with Belisha beacons and reinstatement of existing road markings within the campus

Piper's Hill Campus , Naas , Co. Kildare

667m
2460030N/A22 Jan 2024

for replacement of 4no. existing pedestrian crossings with raised crossings complete with Belisha beacons and reinstatement of existing road markings within the campus.

Piper's Hill Campus , Naas , Co. Kildare

670m
2360359CONDITIONAL6 Nov 2023

for change of use of the existing building from part residential, part guest house use to full guest house use. The proposed development includes minor internal reconfiguration of layouts to provide a total of 9 no. ensuite bedrooms including 1 no. accessible ensuite bedroom. Changes to the façade include minor modifications to the fenestration on the north, west and east elevations, addition of roof lights and new door openings. The proposal also consists of the provision of a wellness garden facility to include a gym (c. 40.3 sqm), a wellness pod (c. 50.5 sqm) incorporating a treatment pod, hot tub deck area, sauna, WC and plant room. 11 no. car parking spaces including 1 no. accessible space and 1 no. EV charging point and, 10 no. bicycle parking spaces are proposed at surface level. The existing domestic wastewater treatment system is proposed to be decommissioned and replaced with an upgraded wastewater treatment plant and associated percolation area. Access will be maintained via the existing vehicular entrance. The proposal includes all site services, boundary treatments, photovoltaic panels, plant areas, bin storage areas, hard and soft landscaping, drainage works and ancillary site development works on a site of 0.925 ha

The Bower , Killashee and Rathasker , Naas

691m
201172N/A8 Oct 2020

Retention of a temporary construction vehicle access route form R448 Kilcullen Road temporary entrance to Bellingsfield Residential Development Zone 6. Retention of temporary hardstanding and 15m set back from R448 Kilcullen Road to facilitate construction vehicles at entrance gates. Retention of temporary 2.4m high paladin entrance gates to fencing to R448 Kilcullen Road. Proposed appropriate signage and bollards / cones at temporary construction access gates . Proposal to temporarily relocate the existing speed limit signs on R448 Kilcullen Road and add temporary traffic signage for the duration of the use of the construction entrance. These signs will revert to their original location upon completion of the construction phase of Bellingsfield Residential Development in March 2022. Removal of all temporary works and reinstatement of existing boundaries, surfaces, and hedgerows relating to this application upon completion of the construction phase of Bellingsfield Residential Development in March 2022

R448 Kilcullen Road , Pipers Hill , Killashee