← Back to search

Firmount East , Clane , Co. Kildare

N/A

Planning application 201544

Kildare - Kildare County Council

Proposed Development

construction of a single storey side and rear extension to existing detached cottage, construction of a detached garage, construction of a new re-located recessed entrance, upgrading of existing septic tank system with secondary effluent treatment system and percolation area and all associated site works,

View the full application file on the council's planning portal →

Application Details

Location
Firmount East , Clane , Co. Kildare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council

Timeline

Registration Date
16 December 2020
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

11m
201606CONDITIONAL23 Dec 2020

construction of a single storey side and rear extension to existing detached cottage, construction of a detached garage, construction of a new re-located recessed entrance to replace existing entrance, upgrading of existing septic tank system with secondary effluent treatment system and percolation area and all associated site works

Firmount East , Clane , Co. Kildare.

202m
1831CONDITIONAL12 Jan 2018

a part single, part two storey private dwelling, separate garage, effluent treatment system and percolation area with polishing filter, entrance and all associated site development works

Millicent Road , Clane , Co.Kildare

234m
2460341CONDITIONAL19 Apr 2024

for the erection of an agricultural entrance and all ancillary site-works

Firmount East , Clane , Co. Kildare.

359m
20646CONDITIONAL23 Jun 2020

the provision of 2no. prefabricated single classrooms 78m² each with a combined area of 164m² as a standalone extension to the existing school building and all associated site works including the installation of a new wastewater treatment system as designed and granted as part of previous planning application 15/368

Hewetson National School , Millicent , Clane

503m
171440REFUSED19 Dec 2017

bungalow, separate double garage, separate stable building, new vehicular entrance with sight lines formed either side, driveway, wetland polishing filter system and landscaping

Ashfield Stud , Millicent Road , Clane

584m
171250CONDITIONAL7 Nov 2017

Extension of Duration of planning file ref. 12/620 - Erection of an agricultural shed and all ancillary site works

Millicent South , Sallins , Co. Kildare

605m
221086CONDITIONAL5 Sept 2022

the construction of a single storey extension to the rear of the existing gate lodge and associated site works

Longtown Farm , Clane , Co. Kildare.

618m
201198REFUSED14 Oct 2020

(A) Erection of a single storey type house. (B) Garage / Fuel store for domestic use. (C) New connection to public foul sewer. (D) Recessed vehicular entrance and access driveway and all associated site works,

Millicent North , Clane , Co. Kildare

636m
2560129REFUSED13 Feb 2025

for constructing an extension to existing storage sheds to be used for storing agricultural and hardware supplies, new car parking spaces, and all associated ancillary site-works

Millicent Road , Clane , Co. Kildare.

648m
2460754CONDITIONAL2 Aug 2024

for (A) change of use of existing community hall to a residential dwelling, (B) demolition of existing outbuilding to the rear. (C) single storey front porch extension to Front (north east) Elevation and the installation of 2 no. new windows and replacement windows to existing openings with new window fenestration to Front (north east) Elevation (D) single storey extension to Rear (south west) Elevation (E) installation of an Oakstown BAF wastewater treatment plant with polishing filter percolation area and (F) upgrading works to the existing entrance to a vehicular recessed entrance and access driveway and all associated site works. Revised by Significant Further Information which consists of: Revised design which omits the porch

Millicent South , Sallins , Co. Kildare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?