← Back to search

Athy Business Campus , Kilkenny Road , Athy

CONDITIONAL

Planning application 201555

Kildare - Kildare County Council

Proposed Development

to retain the formation and laying of an internal roadway, weighbridge with ramps and hard surface area. Full planning permission to construct a Grain intake, drying and storage facility, to include dryers, storage shed, storage bins, weighbridges, internal road structure, upgrade existing entrance and associated site works,

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    17 Dec 2020

  2. Further information requested

    17 Feb 2021

  3. Further information received

    16 Apr 2021

  4. Decision: CONDITIONAL

    10 May 2021

  5. Decision due

    13 May 2021

  6. Grant issued

    23 Jun 2021

Application Details

Location
Athy Business Campus , Kilkenny Road , Athy
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
3.16 ha
Floor Area
505 sq m
Residential Units
1

Timeline

Registration Date
17 December 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
10 May 2021
Grant Date
23 June 2021
Permission Expires
22 June 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

110m
2560937CONDITIONAL18 Aug 2025

for a 70 sq.m side extension to Industrial Unit 10 to form an Electric Vehicle Service Centre, ancillary alterations to front & side elevations, surface water to soakaways and all associated site works

Unit 10 Block F Athy Business Campus , Kilkenny Road , Athy

131m
231017CONDITIONAL7 Dec 2023

to construct a storage shed at our grain intake facility (PL Ref 20/1555) and associated site works. Revised by Significant Further Information which consists of; retention to amendments to permitted development (20/1555) to include; (a) Extension of Site Boundaries to include adjoining buildings. (b) Layout of Roadway & Operation of the facility as constructed. (c) 3 no Additional Grain Storage Bins. (d) Control Room / Dust Room. (e) Weighbridge Locations & Hut. (f) Water Storage Tank. (g) Generator Storage Room.

Athy Business Campus , Kilkenny Road , Athy

131m
24325REFUSED11 Oct 2024

for change of use from childcare facility to delicatessen at ground floor, timber-built extension to front and signage

Unit 1 Block C , Athy Business Campus , Kilkenny Road

136m
24309N/A27 Sept 2024

Retention of the following: Change of use from Childcare Facility to Delicatessen at ground floor, timber-built extension to front and signage

Unit 1 Block C Athy Business Campus , Kilkenny Road , Athy

150m
181204CONDITIONAL3 Oct 2018

the amalgamation of Units 2 and 11, and associated internal alterations

Units 2 & 11 Block B , Athy Business Campus , Athy

166m
19960N/A23 Aug 2019

the construction of a proposed single storey grain storage facility, car parking and yard areas, site entrance, boundary treatments and all associated site development works.

Athy Business Campus , Woodstock South , Athy

178m
23961REFUSED23 Oct 2023

an energy storage facility to provide services to the national grid system on a 2.32ha site comprising: 1 No. sub-station building and associated transformers and grid compliance equipment, 18 No. battery storage containers, 18 No. combined power conversion system and transformer units, 18 No. HVAC (Heating, Ventilation and Air Conditioning) units, 1 No. DNO (Distribution Network Operator) sub-station and interface kiosk, 1 No. spares container, access track from access road serving Athy Business Campus and Athy Industrial Estate, CCTV and lighting, perimeter screening earth berm, closed board and wire mesh fencing and ecologically beneficial landscaping, underground surface water storage tank, temporary construction compound, and associated ancillary site development works and services

Woodstock South , Athy , Co. Kildare

181m
191168CONDITIONAL21 Oct 2019

a 42m multi-user lattice telecommunications support structure carrying antenna and dishes enclosed within a 2.4 metre high palisade fence compound together with associated ground equipment cabinets, a new access track and, associated site works

Athy Business Campus , Woodcock South , Athy

185m
181183CONDITIONAL27 Sept 2018

an energy storage facility to provide services to the national grid system on a 2.32ha site comprising: 1 No. sub-station building and associated transformers and grid compliance equipment, 18 No. battery storage containers, 18 No. combined power conversion system and transformer units, 18 No. HVAC (Heating, Ventilation and Air Conditioning) units, 1 No. DNO (Distribution Network Operator) sub-station and interface kiosk, 1 No. spares container, access track from access road serving Athy Business Campus and Athy Industrial Estate, CCTV and lighting, perimeter screening earth berm, closed board and wire mesh fencing and ecologically beneficial landscaping, underground surface water storage tank, temporary construction compound, and associated ancillary site development works and services

Woodstock South , Athy , Co. Kildare.

271m
22282CONDITIONAL15 Mar 2022

to construct a warehouse extension to rear of the existing factory, to enlarge existing site entrance and all associated and necessary site works

Unit 4 Woodstock Industrial Estate , Athy , Co. Kildare.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?