Athy Business Campus , Kilkenny Road , Athy
CONDITIONALPlanning application 201555
Kildare - Kildare County Council
Proposed Development
to retain the formation and laying of an internal roadway, weighbridge with ramps and hard surface area. Full planning permission to construct a Grain intake, drying and storage facility, to include dryers, storage shed, storage bins, weighbridges, internal road structure, upgrade existing entrance and associated site works,
View the full application file on the council's planning portal →Application Timeline
Application received
17 Dec 2020
Further information requested
17 Feb 2021
Further information received
16 Apr 2021
Decision: CONDITIONAL
10 May 2021
Decision due
13 May 2021
Grant issued
23 Jun 2021
Application Details
- Location
- Athy Business Campus , Kilkenny Road , Athy
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 3.16 ha
- Floor Area
- 505 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 17 December 2020
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 10 May 2021
- Grant Date
- 23 June 2021
- Permission Expires
- 22 June 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for a 70 sq.m side extension to Industrial Unit 10 to form an Electric Vehicle Service Centre, ancillary alterations to front & side elevations, surface water to soakaways and all associated site works
Unit 10 Block F Athy Business Campus , Kilkenny Road , Athy
to construct a storage shed at our grain intake facility (PL Ref 20/1555) and associated site works. Revised by Significant Further Information which consists of; retention to amendments to permitted development (20/1555) to include; (a) Extension of Site Boundaries to include adjoining buildings. (b) Layout of Roadway & Operation of the facility as constructed. (c) 3 no Additional Grain Storage Bins. (d) Control Room / Dust Room. (e) Weighbridge Locations & Hut. (f) Water Storage Tank. (g) Generator Storage Room.
Athy Business Campus , Kilkenny Road , Athy
for change of use from childcare facility to delicatessen at ground floor, timber-built extension to front and signage
Unit 1 Block C , Athy Business Campus , Kilkenny Road
Retention of the following: Change of use from Childcare Facility to Delicatessen at ground floor, timber-built extension to front and signage
Unit 1 Block C Athy Business Campus , Kilkenny Road , Athy
the amalgamation of Units 2 and 11, and associated internal alterations
Units 2 & 11 Block B , Athy Business Campus , Athy
the construction of a proposed single storey grain storage facility, car parking and yard areas, site entrance, boundary treatments and all associated site development works.
Athy Business Campus , Woodstock South , Athy
an energy storage facility to provide services to the national grid system on a 2.32ha site comprising: 1 No. sub-station building and associated transformers and grid compliance equipment, 18 No. battery storage containers, 18 No. combined power conversion system and transformer units, 18 No. HVAC (Heating, Ventilation and Air Conditioning) units, 1 No. DNO (Distribution Network Operator) sub-station and interface kiosk, 1 No. spares container, access track from access road serving Athy Business Campus and Athy Industrial Estate, CCTV and lighting, perimeter screening earth berm, closed board and wire mesh fencing and ecologically beneficial landscaping, underground surface water storage tank, temporary construction compound, and associated ancillary site development works and services
Woodstock South , Athy , Co. Kildare
a 42m multi-user lattice telecommunications support structure carrying antenna and dishes enclosed within a 2.4 metre high palisade fence compound together with associated ground equipment cabinets, a new access track and, associated site works
Athy Business Campus , Woodcock South , Athy
an energy storage facility to provide services to the national grid system on a 2.32ha site comprising: 1 No. sub-station building and associated transformers and grid compliance equipment, 18 No. battery storage containers, 18 No. combined power conversion system and transformer units, 18 No. HVAC (Heating, Ventilation and Air Conditioning) units, 1 No. DNO (Distribution Network Operator) sub-station and interface kiosk, 1 No. spares container, access track from access road serving Athy Business Campus and Athy Industrial Estate, CCTV and lighting, perimeter screening earth berm, closed board and wire mesh fencing and ecologically beneficial landscaping, underground surface water storage tank, temporary construction compound, and associated ancillary site development works and services
Woodstock South , Athy , Co. Kildare.
to construct a warehouse extension to rear of the existing factory, to enlarge existing site entrance and all associated and necessary site works
Unit 4 Woodstock Industrial Estate , Athy , Co. Kildare.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?