← Back to search

5 Monread Court , Naas , Co. Kildare

N/A

Planning application 20454

Kildare - Kildare County Council

Proposed Development

the construction of a two storey extension to the side of an existing attached two storey dwelling, extension to go over existing single storey

View the full application file on the council's planning portal →

Application Details

Location
5 Monread Court , Naas , Co. Kildare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council

Timeline

Registration Date
5 May 2020
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

38m
2660353CONDITIONAL2 Apr 2026

(A) construction of a two storey side extension to front (south west) elevation and Side (south east) elevation to form a dual aspect house. (B) Single storey extension to Rear (north east) elevation.

206 Monread Height , Naas , Co. Kildare

40m
20453N/A5 May 2020

the construction of a two storey extension to the side of an existing attached two storey dwelling, extension to go over existing single storey

6 Monread Court , Naas , Co. Kildare

52m
2460917CONDITIONAL16 Sept 2024

for (a) sub-dividing an existing site, (b) constructing a new two-storey detached type dwelling house, (c) constructing new separating wall/boundary treatment, (d) modifying the existing front boundary to provide two number vehicular entrances, one serving new proposed dwelling and one serving existing dwelling, (e) providing a new connection to public foul drain system, and all associated ancillary site-works

212 Monread Heights , Naas , Co. Kildare

69m
244REFUSED9 Jan 2024

1. Retention for single storey attached granny flat to rear of existing dwelling house. 2, Retention for single storey detached granny flat to rear of existing dwelling house. 3. Retention for 2no.canopies to rear. 4. Retention for 2no. single storey outhouses to rear

1 Monread Close , Naas , Co. Kildare

71m
2560864CONDITIONAL31 Jul 2025

for the demolition of the existing single-storey roof, a proposed first-floor extension to the side of the house, internal modifications & all ancillary site works

201 Monread Heights , Naas , Co. Kildare

79m
23975N/A2 Nov 2023

for 1/ Retention of 3no. single storey self contained bedrooms with communal kitchen facility to rear and associated site works. 2/ Retention of 1no. single storey self contained apartment with communal kitchen facility to rear and associated site works

1 Monread Close , Naas , Co. Kildare

80m
2560865CONDITIONAL31 Jul 2025

for the demolition of the existing single-storey roof, a proposed first-floor extension to the side of the house, internal modifications & all ancillary site works

200 Monread Heights , Naas , Co. Kildare

86m
2360367CONDITIONAL8 Nov 2023

for: (a) sub-division of existing site, (b) new two-storey detached dwelling house, (c) new separating wall / boundary treatment, (d) modifications to front boundary to provide two number entrances, one serving new proposed dwelling and one serving existing dwelling, (e) new connection to mains site services and all associated site development works

215 Monread Heights , Naas , Co. Kildare

88m
2360318N/A23 Oct 2023

for (a) sub-division of existing site, (b) new two-storey detached dwelling house, (c) new separating wall/boundary treatment, (d) modifications to front boundary to provide two number entrances, one swerving new proposed dwelling and one serving exiting dwelling, (e) new connection to mains site services and all associated site development works

215 MONREAD HEIGHTS , NAAS , CO. KILDARE

100m
19800CONDITIONAL15 Jul 2019

The construction of a single storey front porch to existing detached two storey house and all associated site works.

222 Monread Heights , Naas , Co. Kildare.

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?