Proposed Development
to construct a dwelling house, waste water treatment system, new splayed entrance and associated site work
Application Details
- Location
- Coolroe , Athy , Co. Kildare.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Floor Area
- 183 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 19 August 2020
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to construct a dwelling house, waste water treatment system, new splayed entrance and associated site work,
Coolroe , Athy , Co. Kildare
construct a Dwelling house, waste water treatment system, new splayed entrance and associated site work
Coolroe , Athy , Co. Kildare
for to construct an entrance to Dwelling house and associated site works. This entrance supersedes that of Planning Ref:- 23 / 544
Coolroe , Athy , Co. Kildare
to construct an extension to dwelling house, necessary renovations to same house, construction of a domestic garage/storage shed, installation of new wastewater treatment system, relocation of existing entrance and associated site works
Coolroe , Athy , Co. Kildare
to construct an entrance to Dwelling house and associated site works. This entrance supersedes that of Planning Ref:- 23/544
Coolroe , Athy , Co. Kildare
Replacement (“restringing”) and uprating of c.8.89km section of the conductor along the existing Athy - Carlow 110 kV OHL circuit; - Provision of fibre communication connection on the uprated circuit; - Replacement of 11No. existing Intermediate Wooden Polesets, with similar structures. The replacement of these structures will result in standardised heights from 16m to 24m, with height increases between 1m and 3m; - Replacement of 12No. existing intermediate Wooden Polesets crossarms; - Recapping works on shear blocks at 1No. existing steel angle mast; - Foundation strengthening of 1No. existing steel angle mast; - Bar member replacements to 8No. existing steel angle masts; - Separation of the existing double OHL circuit to provide for a new bypass OHL section measuring approximately 422m, connecting from the existing Athy 110 kV substation to the following proposed new structures on the existing Athy - Portlaoise 110 kV OHL: 2no. new single circuit angle masts (approximately 22.5m maximum height) and 1no. new wooden poleset (approximately 23.6m maximum height); and, - All associated works/development to existing structures, including hardware replacement (strain clamps, suspension clamps and vibration dampers), replacement of step bolts, replacement of line identification and danger notices, painting of angle masts, replacement/installation of anti-climbing guards, access tracks, vegetation clearance, temporary construction compounds and all other works necessary to facilitate the development
In the townlands of Woodstock South Ballaghmoon Bennetsbridge Castleroe East Castleroe West Crooket Gorteenvacan Knocknagee , Knockroe Maganey Lower Maganey Upper Newtownallen , Prumpelstown Upper Rosbran and Tonlegee within County Kildare
an energy storage facility to provide services to the national grid system on a 2.32ha site comprising: 1 No. sub-station building and associated transformers and grid compliance equipment, 18 No. battery storage containers, 18 No. combined power conversion system and transformer units, 18 No. HVAC (Heating, Ventilation and Air Conditioning) units, 1 No. DNO (Distribution Network Operator) sub-station and interface kiosk, 1 No. spares container, access track from access road serving Athy Business Campus and Athy Industrial Estate, CCTV and lighting, perimeter screening earth berm, closed board and wire mesh fencing and ecologically beneficial landscaping, underground surface water storage tank, temporary construction compound, and associated ancillary site development works and services
Woodstock South , Athy , Co. Kildare
an energy storage facility to provide services to the national grid system on a 2.32ha site comprising: 1 No. sub-station building and associated transformers and grid compliance equipment, 18 No. battery storage containers, 18 No. combined power conversion system and transformer units, 18 No. HVAC (Heating, Ventilation and Air Conditioning) units, 1 No. DNO (Distribution Network Operator) sub-station and interface kiosk, 1 No. spares container, access track from access road serving Athy Business Campus and Athy Industrial Estate, CCTV and lighting, perimeter screening earth berm, closed board and wire mesh fencing and ecologically beneficial landscaping, underground surface water storage tank, temporary construction compound, and associated ancillary site development works and services
Woodstock South , Athy , Co. Kildare.
to retain the formation and laying of an internal roadway, weighbridge with ramps and hard surface area. Full planning permission to construct a Grain intake, drying and storage facility, to include dryers, storage shed, storage bins, weighbridges, internal road structure, upgrade existing entrance and associated site works,
Athy Business Campus , Kilkenny Road , Athy
for a 70 sq.m side extension to Industrial Unit 10 to form an Electric Vehicle Service Centre, ancillary alterations to front & side elevations, surface water to soakaways and all associated site works
Unit 10 Block F Athy Business Campus , Kilkenny Road , Athy
The submission window has closed
Observations on this application closed on Tuesday 22 September 2020, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?