← Back to search

Barrogstown , Maynooth , Co. Kildare

N/A

Planning application 211122

Kildare - Kildare County Council

Proposed Development

a detached 4 No. bedroom dormer style dwelling and all associated site works

View the full application file on the council's planning portal →

Application Details

Location
Barrogstown , Maynooth , Co. Kildare.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Floor Area
247 sq m
Residential Units
1

Timeline

Registration Date
5 August 2021
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

129m
181000N/A16 Aug 2018

The development will consist of a new infill light industrial / warehouse unit extension to Block D at M4 Interchange

M4 Interchange Park , Celbridge , Co. Kildare

132m
181044CONDITIONAL27 Aug 2018

a new extension to Block D, gross floor area 92sqm. Revised by significant further information consisting of; revised plans consisting of changes to the red line boundary to include realignment of the internal access road and associated parking spaces

M4 Interchange Park , Celbridge , Co. Kildare

191m
17847CONDITIONAL21 Jul 2017

proposed new industrial warehousing building on the existing development site, including all associated car parking and infrastructural services

M4 Interchange Park , Celbridge , Co. Kildare.

191m
17600N/A24 May 2017

proposed new industrial warehousing building on the existing development site, including all associated car parking and infrastructural services

M4 Interchange Park , Celbridge , Co. Kildare.

211m
20534CONDITIONAL28 May 2020

(i) a single storey extension (120 sq.m) to provide storage, circulation and staff facilities; (ii) a single storey extension (75 sq.m) to the existing play area to provide dedicated soft-play area for babies and toddlers up to five years of age; (iii) a single storey entrance porch (12 sq.m) to the main entrance; (iv) a two storey infill extension at the north eastern corner of the existing building to provide an office/meeting room (78 sq.m) at ground floor and which is linked at first floor to a new mezzanine floor within the existing building in order to provide an indoor football pitch (330 sq.m) at first floor level; (iv) an external storage area and facilities area (covered and enclosed) to the rear elevation and (v) the relocation and re-configuration of the previously permitted car park serving Base Entertainment Centre together with an additional 19 no. car parking spaces to serve the additional floor area sought to be retained in this application together with all ancillary landscaping, services, lighting and internal connections to the existing building necessary to serve the development sought to be retained

Base Entertainment Centre , Block C M4 Interchange Park , Celbridge

224m
17230REFUSED3 Mar 2017

Ppoposed leisure and recreational unit (family entertainment centre), comprising of: (a) 2 No. indoor sports pitches; (b) Ancillary staff and customer facilities, toilets, all associated works to ground floor, and all associated and ancillary site works including alterations to existing parking layout

M4 Interchange Park , Celbridge , Co. Kildare.

267m
2026N/A16 Jan 2020

18 no. warehouse/light industrial units with ancillary office and staff facilities in 1 no. block totalling 1,972 sq. metres. The proposed development includes connections to existing services at M4 Interchange Park, signs, internal roads, carparking, bicycle parking, landscaping, lighting, boundary treatments and ancillary works, with vehicular and pedestrian access from the R405 by access road and foot paths previously permitted by Kildare County Council under planning ref. 18/1442

Moortown , Maynooth Road , Celbridge

269m
2560601CONDITIONAL3 Jun 2025

for amendments to the Warehouse and Light Industrial Development permitted under Kildare County Council Reg. Ref. 22/627 (as amended by Kildare County Council Reg. Ref. 24/87 and 24/88 and proposed to be amended by Kildare County Council Reg. Ref. 25/60553). The amendments principally comprise: the omission of Unit B (Warehouse with a Gross Floor Area of 2,622 sq m) and its associated infrastructure including 46 No. car parking spaces; and the provision of an ancillary car park comprising 193 No. spaces to serve Block C in the M4 Interchange Business Park. Access to the ancillary car park will be via the M4 Interchange Business Park. The amendments will also comprise: modifications to the permitted landscaping and boundary treatments; provision of bicycle parking; gates; and all associated site and development works

0.88 Ha site in the townland of Moortown Celbridge , The site which is currently partially in use as a surface car park is generally bound to the north by the M4 Motorway and undeveloped lands to the south by the R405 , to the east by undeveloped lan

278m
171449CONDITIONAL20 Dec 2017

conversion of the attic to habitable space as bedrooms/ensuite with dormer windows to front and rear and with new stairs from hall and retention planning permission is sought for a) the bungalow in its as constructed orientation b) the garage and store as constructed and c) lifting of condition 4 of the original grant of planning permission ref 1008/90 to facilitate development of the remainder of the lands in compliance with Rural Housing Policy (Local Needs). Revised by significant further information consisting of; 1. Upgrade of existing wastewater treatment system 2. Withdrawal of Part C of the original application (removal of Condition 4 of planning permission 1008/90 to facilitate development of the remaining lands) 3. Alteration to entrance in compliance with Kildare Co Council drawing E3639-1

Barrogstown , Maynooth , Co.Kildare

286m
181442CONDITIONAL28 Nov 2018

the construction of a new gated vehicular and pedestrian access onto the Maynooth Road (R405) for access to facilitate future development and all associated site works. Revised by significant further information consisting of: revised red line boundary

M4 Interchange Park , Moortown , Maynooth Road Celbridge

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?