← Back to search

Morristownbiller , Newbridge , Co. Kildare

N/A

Planning application 211449

Kildare - Kildare County Council

Proposed Development

development consists of: Retention of existing structure (currently used as a self-contained residential unit) to be re-converted back to a domestic shed, playroom, gym, shower room, home office and store, retention of existing detached single storey shed as constructed, permission to upgrade existing septic tank to secondary effluent treatment system and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    8 Oct 2021

  2. Further information requested

    30 Nov 2021

  3. Application withdrawn

    17 Aug 2022

Application Details

Location
Morristownbiller , Newbridge , Co. Kildare.
Applicant
N/A
Application Type
RETENTION
Planning Authority
Kildare County Council
Site Area
0.323 ha

Timeline

Registration Date
8 October 2021
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
17 August 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

7m
20270REFUSED16 Mar 2020

of existing single storey family unit with permission to construct a single storey link extension linking the family unit to the existing family home, retention of existing detached single storey shed as constructed, permission to upgrade existing septic tank to secondary effluent treatment system and all associated site works

Morristownbiller , Newbridge , Co. Kildare.

27m
2333CONDITIONAL18 Jan 2023

Retention of existing structure (currently used as a self-contained residential unit) to be re-converted back to a domestic shed, playroom, gym, shower room, home office and store. Retention of existing detached single storey shed as constructed. Permission to upgrade existing septic tank to secondary effluent treatment system and all associated site works as revised by Significant Further Information consisting of Retention of existing secondary effluent treatment system as constructed

Morristownbiller , Newbridge , Co. Kildare.

70m
17965CONDITIONAL25 Aug 2017

the construction of a new single access recessed entrance to serve existing detached house (the existing portion of the shared access entrance used by the applicant will be blocked up) and all associated site works

Blackberry Lane , Morristownbiller , Newbridge

78m
173CONDITIONAL3 Jan 2017

Construction of a single storey rear extension, to existing detached bungalow, permission to upgrade existing septic tank to secondary effluent treatment system and all associated site works

Cill Dara Lodge , Blackberry Lane , Morristownbiller

131m
20596N/A11 Jun 2020

a part one and a half storey and part single storey dwelling, a waste water treatment system, percolation area, a shared residential and agricultural site entrance, a wall to the side of the dwelling separating the front garden and driveway from the rear, a carport and all associated siteworks

Blackberry Lane , Morristownbutler , Newbridge

135m
20653CONDITIONAL24 Jun 2020

a part one and a half storey and part single storey dwelling; a waste water treatment system, percolation area, a shared residential and agricultural site entrance, a wall to the side of the dwelling separating the front garden and driveway from the rear, a carport and all associated siteworks

Blackberry Lane , Morristownbiller , Newbridge

156m
21570CONDITIONAL27 Apr 2021

a revised wall finish from a plaster finish as per planning permission Ref. 20/653 to a black corrugated fibre cement cladding to the side walls of the dwelling

Blackberry Lane , Morristownbiller , Newbridge

163m
20622N/A17 Jun 2020

of a part one and a half storey and part single storey dwelling, a waste water treatment system, percolation area, a shared residential and agricultural site entrance, a wall to the side of the dwelling separating the front garden and driveway from the rear, a carport and all associated siteworks

Blackberry Lane , Morristownbutler , Newbridge

171m
20671CONDITIONAL29 Jun 2020

To construct a one and a half storey extension to the rear of existing single storey dwelling, new entrance and driveway, connection to existing services and all associated site works.

Blackberry Lane , Morristown Biller , Newbridge

242m
171023CONDITIONAL11 Sept 2017

(a) the construction of a new detached dwelling; (b) the provision of a new recessed vehicular entrance; (c) the provision of a new waste water treatment system and percolation area; and (d) all associated site works

Blackberry Lane , Newbridge , Co. Kildare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?