Proposed Development

development at this site on land south of the L1015 Road at Confey. The development will consist of permission to amend the design of the approved development (Planning Reference 16/848) which comprises consent for a Solar PV Energy Development. Proposed amendments include: (1) Substation to increase in size and relocate; (2) Customer Substation to be removed; (3) Storage Container to relocate: (4) Transformer Containers to relocate, increase in size and reduce in numbers; (5) Change in height and layout of Deer Fencing: (6) Reduction in height and numbers of CCTV cameras; (7) Slight alteration to the access tracks; (8) Change in height and angle of solar panels; (9) MW output to be reduced from 10MW to 8.2MW, and (10) Project lifetime proposed to be extended from 30 to 35 years

View the full application file on the council's planning portal →

Application Details

Location
Confey , Leixlip , Co. Kildare.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council

Timeline

Registration Date
9 December 2021
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

86m
211470REFUSED12 Oct 2021

Extension of Duration of Planning Ref. No. 16/848 - a solar PV panel array with an export capacity of 10MW comprising approximately 38, 600 photovoltaic panels on ground mounted frames within a site area of 16.91 hectares, 7 No. single storey MV substations, 1 No. single storey DSO substation, 1 No. single storey customer substation, 1 No. single storey spares building, 1 No. communications pole, boundary security fencing, CCTV, associated electrical cabling and ducting, alteration to existing entrance to include access gates and all associated ancillary development works. Revised by Significant Further Information which includes submission of a Natura Impact Statement; submission of road safety audit, swept path analysis and visibility splay drawings; revised location of communications pole as shown on the revised Customer Building Drawing; Revised DSO and MV Building Drawings; Revised Site Layout drawings; Revised Environmental Impact Assessment Screening Report, on land south of the L1015 road

Confey , Leixlip , Co. Kildare.

139m
211773N/A17 Dec 2021

development at this site on land south of the L1015 Road at Confey, Leixlip. The development will consist of permission to amend the design of the approved development (Planning Reference 16/848) which comprises consent for a Solar PV Energy Development. Proposed amendments include: (1) Substation to increase in size and relocate; (2) Customer Substation to be removed; (3) Storage Container to relocate; (4) Transformer Containers to relocate, increase in size and reduce in numbers; (5) Change in height and layout of Deer Fencing: (6) Reduction in height and number of CCTV cameras; (7) Slight alteration to the access tracks; (8) Change in height and angle of solar panels; (9) MW output to be reduced from 10MW to 8.2MW, and (10) Project lifetime proposed to be extended from 30 to 35 years

Confey , Leixlip , Co. Kildare.

173m
226CONDITIONAL10 Jan 2022

to amend the design of the approved development (Planning Reference 16/848) which comprises consent for a Solar PV Energy Development. Proposed amendments include: (1) Substation to increase in size and relocate; (2) Customer substation to be removed, (3) Storage container to relocate, (4) Transformer containers to relocate, increase in size and reduce in numbers, (5) Change in height and layout of deer fencing, (6) Reduction in height and number of CCTV cameras, (7) Slight alteration to the access tracks, (8) Change in height and angle of solar panels, (9) MW output to be reduced from 10MW to 8.2MW, and (10) Project lifetime proposed to be extended from 30 to 35 years. Revised by Significant Further Information which consists of the duration allowed for the works permitted under planning application reference 16/848 is sought to be increased to 10 years from the date of the final grant of permission (9th March 2017); and Condition 18 is sought to be amended to allow construction of both Confey Solar Farm (16/848) and Towerhill Solar Farm (16/777 to occur at the same time

Land South of the L1015 Road at Confey , Leixlip , Co. Kildare

214m
2660290CONDITIONAL20 Mar 2026

change of use of temporary construction related access laneway into permanent agricultural use at my farmlands located at Malone Farm, Confey Road, Confey, Kellystown, Leixlip, Co. Kildare. The temporary construction related access laneways were developed under Grant of Planning Permission Reg. Ref. 221417. The development will consist of the following items: Change of use of temporary construction related access laneway into permanent agricultural use. The total length of this agricultural laneway is approximately 481 metres. This access laneway will safely connect the upper and lower lands of the farm

Malone Farm , Confey Road Confey , Kellystown Leixlip

372m
18234N/A8 Mar 2018

the construction of a new 5m high, 23m span pedestrian/services bridge across the Rye River and associated landscaping

Within the townland of Leixlip , 900m east of the exsiting Sandsford Bridge

385m
18343CONDITIONAL29 Mar 2018

the construction of a new 5m high, 23m span pedestrian/services bridge across the Rye River, associated landscaping and temporary construction laydown area within the townland of Leixlip, 900m east of the existing Sandford’s Bridge,

Leixlip townland , 900m east of Stanfords Bridge , Co. Kildare

451m
221401N/A24 Nov 2022

the alteration and realignment of an approximate 1.1km section of existing double circuit overhead line which supports the existing Maynooth-Ryebrook and Dunfirth-Kinnegad-Rinnawade 110kV overhead line circuits. The proposed development comprises of: (1) Diversion. Diverting a section of the existing 110kV double circuit overhead line to the north of the River Rye, along the eastern side of the Intel site at Collinstown, linking back to the existing overhead line section at the car park of the Lidl supermarket, directly south of the R148. (2) Removal of Existing Double Circuit Towers. The decommissioning and removal of 4 No existing double circuit steel lattice towers and associated electrical conductors to include the removal of the existing towers and associated electrical conductors from site. (3) Double Circuit Towers. The installation of 7 No new double circuit steel lattice towers. Two of these will be replacement towers (Towers T1 & T7). The towers will range in height from approximately 20.75m to approximately 39.75m above ground level and will support six electrical conductors (overhead lines). (4) Site Works. All ancillary site development, preparation and reinstatement works, including access, landscaping and connection to existing services and utilities and miscellaneous site works. This application consists of a variation to a previously permitted development on an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required. An Environmental Impact Assessment Report ("EIAR") and a Natura Impact Statement ("NIS") accompany this application and they will be available for inspection or purchase at the office of the Planning Authority. This is a site to which the Chemicals Act (Control of Major Accident Hazard Involving Dangerous Substances) Regulations 2015 (S.I. 209 of 2015) applies.

Intel Leixlip Site , Collinstown Blakestown Kellystown , Collinstown Industrial Park

508m
21229CONDITIONAL26 Feb 2021

(1) Modular Storage Unit. A Single storey storage unit, sized approximately 7 metres by 12 metres and 6 metre high, located in the Utilities Yard to the north of the existing Fab10 Support Building. (2) FAB10 Waste Tanks. The installation of 3no. new bunded waste storage tanks, 2no. sized approximately 2.5 metres in diameter and 16.5 metres high, located in the Utilities Yard to north of the existing Fab10 Support Building and 1no. sized approximately 3.7metres in diameter and 15 metres high located to the north of the Fab10 Utilities Yard. (3) Process Support Building Extension. The construction of a two-storey extension to the existing Process Support Building (PSB) sized approximately 20 metres by 11 metres and 14 metres high, located to the north east of the existing Fab 24 Process Support Building. (4) FAB24 and FAB14 Waste Tanks. The installation of 3no. additional waste tanks and associated access platforms and stairways, 1no. sized approximately 9 metres by 10 metres and 7 metres high, located in the Utilities Yard to the north of the existing FAB24 Manufacturing Building and 1no. sized approximately 3 metres high located to the south of existing FAB14 Process Building and 1 no. sized approximately 4.25 metres in diameter and 16 metres high, located to the south of existing FAB14 process Building.(5) Site Works. The proposed development includes linking pipe-bridges to the Fab10 and Fab14 support buildings, site development works, site utilities, site lighting, separation walls, road alterations, landscaping and all associated site works. This application consists of a variation to a previously permitted development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required. A Natura Impact Statement ("NIS") accompanies this application for inspection or purchase at the office of the Planning Authority. This is a site to which the Chemical Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (S.I.209 of 2015) applies

Collinstown Leixlip , Blakestown Kellystown , Collinstown Industrial Park

532m
191339CONDITIONAL3 Dec 2019

modifications to the permitted ASU's (Air Separation Units, tank and equipment installations granted as part of the development permitted under An Bord Pleanála Ref. ABP-304672-19 (Kildare County Council Ref. 19/91), including reconfigured site layout of the proposed structures and support plant. The proposed development comprises: Air Separation Units. The proposed development includes positional alterations to the 2no. permitted Air Separation Unit (ASU) compounds, associated towers and compressor buildings. Towers are circa 65 metres high and associated compounds including tanks and equipment are circa 45 metres high and compressor buildings are approximately 20m metres high, all located to the north of the existing Fab 14 building. The ASU compounds also comprise of 2no. compressor buildings each sized 765 square metres approximately and circa 20 metres high with roof mounted plant, equipment and storage and associated 1no. single storey electrical building sized 60 square metres approximately and circa 6 metres high with roof mounted equipment. The proposed development also relates to associated site development works associated equipment housings, yard works and tank bunds, pipe-bridges, and lighting. The application consists of a variation to a previously permitted development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required. A "Natura Impact Statement ("NIS") accompanies this application, and will be available for inspection or purchase at the office of the Planning Authority. This is a site to which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (S.I. 209 of 2015) applies

Collinstown Leixlip , Blakestown Kellystown , Collinstown Industrial Park

544m
2027CONDITIONAL16 Jan 2020

the replacement of approximately 120m of existing 2.3m high chainlink perimeter fencing and associated access/emergency gates with new 2.4m green palisade security fencing/gates and all associated site works

Existing Above Ground Natural Gas Installation at , Collinstown , Leixlip

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?