← Back to search

Barrettstown , Newbridge , Co.Kildare

N/A

Planning application 21593

Kildare - Kildare County Council

Proposed Development

Planning permission for the construction of a storey and a half dwelling house, detached domestic garage, wastewater treatment system and percolation area, using the existing approved farm entrance

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    30 Apr 2021

  2. Application withdrawn

    15 Jun 2021

Application Details

Location
Barrettstown , Newbridge , Co.Kildare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
0.26 ha
Floor Area
238 sq m
Residential Units
1

Timeline

Registration Date
30 April 2021
Status
WITHDRAWN
Decision
N/A
Withdrawn
15 June 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

61m
22745REFUSED17 Jun 2022

the construction of a storey and a half dwelling house, detached domestic garage, wastewater treatment system and percolation area, and all associated site works using the existing approved farm entrance

Barrettstown , Newbridge , Co. Kildare.

213m
181480CONDITIONAL10 Dec 2018

(1) Revisions to previously approved development Reg. Ref. 07/716, consisting of alternative layout of sheep shed and hayshed, and (2) Revised recessed entrance to farm, together with internal gravel access roadway to the sheds,

Barrettstown , Newbridge , Co. Kildare.

227m
20170REFUSED24 Feb 2020

Permission for sub-division of existing site for the construction of a one and half storey detached house with dormer element, single storey domestic garage, secondary effluent treatment system, recessed entrance and all associated site works. Retention permission for the temporary use of mobile home on site for a period of 2 years

Barrettstown , Newbridge , Co. Kildare.

229m
21712REFUSED24 May 2021

for the sub- division of existing site for the construction of a one and half storey detached house with dormer element, single storey domestic garage, secondary effluent treatment system ,recessed entrance and all associated site works. Retention permission for the temporary use of moblie home on site for a period of 2 years

Barrettstown , Newbridge , Co. Kildare

239m
201304N/A30 Oct 2020

for sub-division of existing site for the construction of a one and half storey detached house with dormer element, single storey domestic garage, secondary effluent treatment system, recessed entrance and all associated site works. RETENTION PERMISSION for the temporary use of mobile home on site for a period of 2 years

Barrettstown , Newbridge , Co. Kildare

240m
201374REFUSED16 Nov 2020

subdivision of existing site for the construction of a one and a half storey detached house with dormer element, single storey domestic garage, secondary effluent treatment system, recessed entrance and all associated site works. Retention permission for the temporary use of mobile home on site for a period of 2 years,

Barrettstown , Newbridge , Co. Kildare

249m
191057REFUSED24 Sept 2019

for sub-division of existing site for the construction of a one and half storey detached house with dormer element, single storey domestic garage, secondary effluent treatment system, recessed entrance and all associated site works. Retention permission for the temporary use of mobile home on site for a period of 2 years

Barrettstown , Newbridge , Co. Kildare.

261m
19276REFUSED19 Mar 2019

sub-division of existing site for the construction of a one and half storey detached house with dormer element, single storey domestic garage, secondary effluent treatment system, recessed entrance and all associated site works

Barrettstown , Newbridge , Co. Kildare.

265m
18849CONDITIONAL16 Jul 2018

a) retention permission for the existing detached garage to the rear of the site permission and b) for permission for completion of same and all associated site works

Barretstown , Newbridge , Co. Kildare

268m
2237CONDITIONAL18 Jan 2022

The changes consist of: A) alterations to the fenestration including an additional dormer to the front elevation. B) increase in building footprint to the front, side and rear of the dwelling by an area of 59.5m2, and C) change in height of the dwelling

Barretstown , Newbridge , Co. Kildare.

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?