Planning application 21649

Kildare - Kildare County Council

Proposed Development

the demolition of the existing extension to the side of the house, proposed single-storey extensions to the side and rear, the upgrading of the existing septic tank to a wastewater treatment system, and all ancillary site works

View the full application file on the council's planning portal →

Application Details

Location
Rathmore , Blackhall , Clane
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council

Timeline

Registration Date
12 May 2021
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

39m
21695CONDITIONAL20 May 2021

the demolition of the existing extension to the side of the house, proposed single storey extensions to the side and rear, the upgrading of the existing septic tank to a wastewater treatment system, and all ancillary site works

Rathmore , Blackhall , Clane

86m
20664N/A26 Jun 2020

(a) the erection of a single storey type house, (b) the installation of a Sepcon BAF wastewater treatment plant with polishing filter percolation area and (c) new vehicular entrance and access drive way and all associated site works

Blackhall , Clane , Co. Kildare.

97m
20710REFUSED3 Jul 2020

(a) The erection of a single storey type house; (b) The installation of a Sepcon BAF wastewater treatment plant with polishing filter percolation area; and (c) New vehicular entrance and access driveway and all associated site works

Blackhall , Clane , Co. Kildare.

157m
19959REFUSED23 Aug 2019

a 1 & 1/2 storey dwelling, on site effluent treatment system and percolation area, surface water to soak aways, detached stable block with 3 no. stables, tack room and store, recessed vehicular entrance and all associated site works

Blackhall , Rathmore , Clane

159m
20362REFUSED9 Apr 2020

construction of a one and half storey detached house, secondary effluent treatment system, recessed entrance, detached stable block (3 stables, tack room, store) and all associated site works. Removal of sterilisation condition attached to planning Ref. 77/9

Rathmore , Clane , Co. Kildare.

174m
20346N/A2 Apr 2020

construction of a one and half story detached house, secondary effluent treatment system, recessed entrance, detached stable block (3 stables, tack room, store) and all associated site works. Removal of sterilisation condition attached to planning ref. 77/9

Rathmore , Clane , Co. Kildare.

179m
19899N/A8 Aug 2019

Permission is sought for a 1 ½ storey dwelling, on site effluent treatment and percolation area, surface water to soak aways, detached stable block with 3 no. stables, tack room and store, recessed vehicular entrance and all associated site works.

Rathmore , Clane , Co. Kildare.

179m
201229N/A19 Oct 2020

construction of a one and a half story detached house, secondary effluent treatment system, recessed entrance, detached stable block (3 stables, tack room, store) and all associated site works, removal of sterilisation condition attached to Planning Ref 77/9,

Rathmore , Clane , Co. Kildare

188m
201290REFUSED29 Oct 2020

construction of a one and a half storey detached house, secondary effluent treatment system, recessed entrance, detached stable block (3 stables, tack room, store) and all associated site works, removal of sterilisation condition attached to Planning Ref. 77/9,

Rathmore , Clane , Co. Kildare.

355m
21970CONDITIONAL2 Jul 2021

(A) the erection of Two storey type house with single storey side projection to the south elevation, (B) garage/fuel store for domestic use, (C) the installation of a proprietary wastewater treatment plant with a soil polishing filter percolation area and (D) new access driveway to serve the proposed house taken from the existing family home entrance/roadway granted under file ref 02/2498 and all associated site works

Blackhall , Clane , Co. Kildare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.