Barnhall Road , Leixlip , Co. Kildare

CONDITIONAL

Planning application 2179

Kildare - Kildare County Council

Proposed Development

the change of use of the existing and permitted (Reg. Ref:. 95/923) Ancillary Production Support Office associated with part of Building No. 2 to a standalone independent Office use including break room and tea station (c. 1,139sqm). The proposed development specifically relates to Building No. 2 located to the north-east of the centre of the site. (No alteration to the balance of the development is sought by this Application.) The site is principally bounded by: Barnhall Road to the north; Celbridge Road to the east; Barnhall Rugby Football Club to the south; and by grounds associated with Castletown House to the west. At a site of c.80.56 hectares at Liffey Business Campus (formerly known as the Hewlett Packard Campus)

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    26 Jan 2021

  2. Decision: CONDITIONAL

    18 Mar 2021

  3. Decision due

    22 Mar 2021

  4. Grant issued

    30 Apr 2021

Application Details

Location
Barnhall Road , Leixlip , Co. Kildare.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
80.56 ha

Timeline

Registration Date
26 January 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
18 March 2021
Grant Date
30 April 2021
Permission Expires
29 April 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

300m
2060CONDITIONAL28 Jan 2020

The proposed development specifically relates to Building No. 3 and Building No. 4 located to the north-east of the centre of the site. (No alteration to the balance of the development is sought by this Application). The development for which retention permission is sought consists of: the change of use of Building No. 3 from its permitted warehouse use (Reg. Ref. 95/923) to manufacturing use (4,421 sq. m gross floor area including ancillary offices at ground floor and first floor level); and the change of use of part of Building No. 4 from its permitted manufacturing use (Reg. Ref. 95/923) to office use (9,002 sq. m gross floor area ). The development for which retention permission is sought also consists of: the provision of ancillary office space at first floor level within Building No. 4 (246 sq. m gross floor area); and all other associated site development works above and below ground. The site is principally bounded by; Barnhall Road to the north; Celbridge Road to the east; Barnhall Rugby Football Club to the south; and by grounds associated with Castletown House to the west

At a site of c. 80.56 hectares , at Liffey Business Campus (formerly known as the Hewlett Packard Campus) , Barnhall Road

343m
21623CONDITIONAL10 May 2021

The proposed development which specifically relates to Building No. 4 located to the northeast of the centre of the site. The development for which retention permission is sought consists of the retention of the mezzanine area (121 sqm) on the first- floor level. This consists of office space, toilets, and a canteen. Retention permission is sought for any associated site works that would have occurred due to the construction of the mezzanine

Liffey Park Technology Campus , Barnhall Road , Parsonstown

355m
21270N/A5 Mar 2021

Retention permission for development specifically relates to Building No.4, retention permission consists of the retention of the mezzanine area(121 sqm) on the first floor level. This consists of office space, toilets, and a canteen. Retention permission is sought for any associated site works that would have occurred due to the construction of the mezzanine.

Liffey Park Technology Campus , Barnhall Rd Parsonstown , Leixlip

421m
2560200CONDITIONAL28 Feb 2025

for the demolition of an existing 23m2 single storey entrance porch at Building No.3 (North-East elevation) and removal of entrance pathway. Construction of new 148m2 single storey reception building at point of existing entrance on North-East façade to include a sheltered canopy public entrance with separate staff entrance, reception waiting area, tea station, 1 no. office room, 1 no. meeting room and a wheelchair accessible W.C. all with associated ancillary, drainage and landscape works including permeable paving serving as attenuation tank and soakaway

Kildare Innovation Centre , Barnhall Road , Leixlip

452m
23450N/A28 Apr 2023

erection of six 3m diameter x 10m high raw material storage siles in the open yard to the rear of buildings 2, 3, and 4. Two new fire exit doors (double doors) to building 2 (south west elevation.) Retention of the erection of two 3m diameter x 10m high raw material storage silos in the open yard to the rear of buildings 2, 3, and 4.

Kildare Innovation Centre , Barnhall Road , Leixlip

463m
2460230CONDITIONAL17 Mar 2024

A new porch and canopy roof to front of dwelling, a new 2 storey front side and rear extension, comprising of a garage, utility room and open storage area on ground floor, a new bedroom and en-suite on first floor, a new single storey rear extension with roof windows, new roof windows to rear of existing roof, a new single door entrance to side of boundary wall and all associated site works

3 Rinawade Lawns , Leixlip , Co. Kildare

468m
2560280CONDITIONAL18 Mar 2025

for the construction of two storey extension to the side and single storey extension to the rear, Attic conversion with Dormer windows, internal alterations and all associated ancillary site works

10 Rinawade Lawns , Leixlip , Co. Kildare

468m
23690CONDITIONAL22 Jun 2023

will consist of erection of Six 3m diameter x 10m high raw material storage silos in the open yard to the rear of Buildings, 2, 3 and 4. Two new fire exit doors (double doors) to Building 2 (South West Elevation). Retention of the erection of Two 3m diameter x 10m high raw material storage silos in the open yard to the rear of Buildings 2, 3 and 4

Kildare Innovation Centre , Barnhall Road , Leixlip

476m
221096CONDITIONAL6 Sept 2022

development of 4 No. 20 kV ESB double substations at four sites of c. 591 sqm in total (Site 1, c. 138 sqm adjacent to Building 4; Site 2, c. 138 sqm adjacent to Building 2 and Building 5; Site 3, c. 138 sqm adjacent to Building 5; and Site 4, c. 177 sqm partially within Building 9, at the Kildare Innovation Campus (formerly known as the Hewlett Packard Campus) Barnhall Road, Leixlip, Co. Kildare. The wider Kildare Innovation Campus is c. 80 hectares. The wider Campus is principally bounded by: Barnhall Road to the north; Celbridge Road to the east; Barnhall Rugby Football Club to the south; and grounds associated with Castletown House to the west. The proposed development will consist of: the construction of 3 No. standalone ESB double substations and associated LV switch rooms (Substations No. 1-3) of c. 3m in height, c. 4.8m in depth, and c. 17.8m in width, with an individual gross floor area of 57.5 sqm; and all associated works above and below ground. Substation No. 4 (gross floor area of 57.5 sqm) will include: internal alterations to the existing Campus Building No. 9; associated LV switch rooms; the removal of existing louvre and replacement with substation access doors on the southeast elevation; access path; and all associated works above and below ground. The cumulative gross floor area of the development will be 230 sqm

Kildare Innovation Campus , Barnhall Road , Leixlip

480m
2560230N/A7 Mar 2025

for the construction of two storey extension to the side and single storey extension to the rear, Attic conversion with Dormer windows, internal alterations and all associated ancillary site works

10 Rinawade Lawns , Leixlip , Co. Kildare