← Back to search

Millbrook , Naas , Co. Kildare

N/A

Planning application 221252

Kildare - Kildare County Council

Proposed Development

change of use of existing building to residential use as constructed and all associated site works

View the full application file on the council's planning portal →

Application Details

Location
Millbrook , Naas , Co. Kildare
Applicant
N/A
Application Type
RETENTION
Planning Authority
Kildare County Council
Site Area
0.0147 ha
Floor Area
587.4 sq m
Residential Units
3

Timeline

Registration Date
21 October 2022
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

4m
221490REFUSED15 Dec 2022

change of use of existing building to residential use as constructed and all associated site works. The development is within the curtilage of a Protected Structure (NS 19-037)

Millbrook , Naas , Co. Kildare W91EC42

4m
221204N/A7 Oct 2022

For change of use of existing building to residential use as constructed and all associated site works

Millbrook , Naas , Co. Kildare.

49m
2660168CONDITIONAL20 Feb 2026

amend granted planning reference 24/61161 (ABP-322381-25) . The amendment consists of the change of finished floor levels of dwelling no. 5-9 including all associated site works and services

Millbrook , Naas , Co. Kildare

60m
2461161REFUSED4 Nov 2024

for A) The demolition of an existing detached dwelling, B) The construction 3 no. 3 bedroom end-of-terrace dwellings (Type A1), C) The construction 4 no. 3 bedroom mid-terrace dwellings (Type A2) D) The construction of 1 no. 4 bedroom detached dwelling (Type B1), E) The construction 1 no. 3 bedroom end-of-terrace dwelling (Type B2), F) A modification to existing access road off the Millbrook Court road servicing Millbrook Villas and all associated services and site works

Millbrook , Naas , Co. Kildare

64m
21778CONDITIONAL2 Jun 2021

for a single storey flat roofed extension (floor area 40m2) to the rear and side of the existing two storey end of terrace house (floor area of existing house 70m2),

No. 22 Millbrook Court , Naas , Co. Kildare

78m
22420CONDITIONAL12 Apr 2022

construction of a dormer rear extension (north), single storey double height side extension (west) and a single storey side extension (east), installation of a dormer window on south roof plane, balcony style rooflight on west roof plane, amendment of ground floor windows on west and installation of rooflights on east and west roof plane and all associated site works

9 Millbrook Villas , Naas , Co. Kildare

80m
23774N/A13 Jul 2023

Will consist of : A) Demolition of the existing dwelling, B) Alternations to the elevations and plans to that previously granted and all associated site works and services

9 Millbrook Villas , Naas , Co.Kildare

81m
2360058CONDITIONAL20 Jul 2023

Full planning permission for development at 9 Millbrook Villas, Naas, Co. Kildare The development will consist of: A) Demolition of the existing dwelling, and B) Construction of replacement dwelling, and all associated site works and services.

9 Millbrook Villas , Naas , Co. Kildare

83m
23748N/A4 Jul 2023

Will consist of: A) Demolition of the existing dwelling, B) Alterations to the elevations and plans to that previously granted, and all associated site works and services

9 Millbrook Villas , Naas , Co.Kildare

97m
22356N/A30 Mar 2022

development consisting of the demolition of the existing single storey extension to the side and rear; the removal of the existing porch to the front; modifications to the existing cottage exterior including restoration of existing windows to front and new window to side; enlargement of existing window to side of two-storey return; a new rooflight to the existing two-storey return; and the construction of a new one-storey extension to the side and two-storey extension to the rear of the existing house along with associated landscape works

5 Millbrook Villas , Naas , Co. Kildare.

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?