Great Connell and Kilbelin , Newbridge , Co. Kildare
CONDITIONALPlanning application 221504
Kildare - Kildare County Council
Proposed Development
The development will consist of the provision of approximately 790m of new Distributor Road, including a new bridge over the River Liffey, forming part of the Newbridge South Outer Orbital Road (NSOOR) linking the Great Connell Road to the section of the NSOOR permitted under ABP Reg. Ref. 302141-18 (Belin Woods, currently under construction) and will comprise of the following works: Provision of a single carriageway road, with cycleways and footpaths in both directions, including a five-span bridge of approximately 170m over the River Liffey, with provision for future bus stops and associated toucan pedestrian crossing; Tie-in of the proposed section of Distributor Road with the Great Connell Road including upgrade of the existing roundabout to a signal control junction including toucan crossings on all arms of the junction; Provision of a proposed River Park of approximately 9.2 ha as a multi-use recreational amenity, including pedestrian and cycle routes connecting to existing public space network, a multi-use games area (MUGA) and incorporating biodiversity and water management features; Provision of 2 No. new agricultural entrances from the proposed Distributor Road to adjoining lands (pending any future residential development of those lands); and All associated earthworks, signage, lighting, drainage works, services and connections, landscaping works, environmental measures and all ancillary works above and below ground level. The application will be accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS)
Application Timeline
Application received
19 Dec 2022
Further information requested
21 Feb 2023
Further information received
17 Jul 2023
Decision: CONDITIONAL
8 Sept 2023
Decision due
10 Sept 2023
Grant issued
2 Nov 2023
Application Details
- Location
- Great Connell and Kilbelin , Newbridge , Co. Kildare.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 13.63 ha
Timeline
- Registration Date
- 19 December 2022
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 8 September 2023
- Grant Date
- 2 November 2023
- Permission Expires
- 1 November 2028
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
STRATEGIC HOUSING DEVELOPMENT (ABP DECISION) - demolition of existing site structures (2,622.3 sqm) and the construction of 569 no. residential units, a neighbourhood centre with 11 no. units (gross floor area 2,141 sqm) and a childcare facility (886 sqm), a circa 350 metre section of distributor road, and all ancillary and associated works on a site of 27.64 ha surrounding and including the dwellings of "Greatconnell" and "Valencia Lodge"
Great Connell , Newbridge , Co. Kildare
STRATEGIC HOUSING DEVELOPMENT (ABP Decision) provision of 343 no. residential units comprising 283 no. terraced and semi-detached houses (56 no. two bed two storey; 169 no. three bed two storey; 20 no. four bed two storey, and 36 no. four bed three storey units); 48 no. apartments in 2 no. three storey blocks (16 no. one bed; 32 no. two bed), and 12 no. one bed apartments accommodated in three pairs of two storey semi-detached houses (maisonettes). Existing agricultural buildings on site will be demolished. The existing Kilbelin House will be renovated and extended to provide a 545sqm childcare facility with associated external play area and parking facilities
Kilbelin , Newbridge , Co. Kildare
an increase in the previously permitted occupancy under application 23/244 from 168 childcare places to 178 places, at any one time, due to a minor revised internal layout/reconfiguration of rooms. All at the existing purpose built creche/pre-school facility
Kilbelin House , The Park Belin Woods , Newbridge
The proposed development involves the construction of a two storey detached dwelling (including staff accommodation) and a single storey gate lodge, along with a new vehicular entrance off Ryston Avenue, car parking, driveway, landscaping (including ponds) and all associated site works (including temporary construction access via Ryston Pitch and Putt course).The two storey dwelling will have solar PV panels.
South of Ryston Pitch and Putt course , and east of Ryston Avenue , Ryston Newbridge
development on lands to the south of Ryston Pitch and Putt course and east of Ryston Avenue. The proposed development involves the construction of a two storey, detached dwelling (including staff accommodation) and a single storey gate lodge, along with a new vehicular entrance off Ryston Avenue, car parking, driveway, landscaping (including ponds) and all associated site works (including temporary construction access via Ryston Pitch and Putt course). The two storey dwelling will have solar PV panels. Revised by Significant Further Information
Ryston , Newbridge , Co. Kildare.
an increase in the previously permitted occupancy from 83 childcare places to 168 places due to a revised internal layout/reconfiguration of rooms. All at the existing purpose built creche/pre-school facility
Kilbelin House , The Park , Belin Woods
Extension of Duration for Planning File Ref. 16/811 - change of use of swimming pool room to self contained family unit (internal access and connectivity to the main house will remain). The works include modifications to existing windows, installation of new external door and all associated site works
Ryston Avenue , Newbridge , Co. Kildare
The development will consist of the removal of non-compliant roof and rooflight at the rear construction of a new extension to the rear comprising ground floor and room in the attic space under a new pitched room on the first floor, conversion of part of the existing garage to a walk in wardrobe and en-suite bathroom with new pitched roof and rooflights, photovoltaic panels on roofs at rear, rooflights front and rear together with all related internal alterations and all associated site development works.
Drewsboro , Kilbelin , Newbridge
development will consist of: Retention of single storey extension to front of existing single storey detached bungalow and all associated site works
Kilbelin , Newbridge , Co. Kildare W12 B628.
Extension of Duration of Planning File Ref. No. 16/811 - change of use of swimming pool room to self contained family unit (internal access and connectivity to the main house will remain). The works include modifications to existing windows, installation of new external door all associated site works
Ryston Avenue , Newbridge , Co. Kildare.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?