← Back to search

Main Street , Celbridge , Co. Kildare

N/A

Planning application 22861

Kildare - Kildare County Council

Proposed Development

sought for development on the public footpath at Main Street, 3.6m southwest of existing telephone kiosk outside The embassy Takeaway, Celbridge. The development will consist of the replacement of the existing telephone kiosks with a new telephone Kiosk with integral Communication Unit and a 1.53 sq. metre digital advertising display. The proposed structure has an overall height 2.43m, a depth of 0.762m and a width 1.096m

View the full application file on the council's planning portal →

Application Details

Location
Main Street , Celbridge , Co. Kildare.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council

Timeline

Registration Date
15 July 2022
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

4m
221019REFUSED19 Aug 2022

development on the public footpath at Main Street, 3.6m southwest of existing telephone kiosk outside The Embassy Takeaway, Celbridge, Co. Kildare. The development will consist of the replacement of existing telephone kiosks with a new telephone kiosk with integral communication unit and a 1.53sqm digital advertising display. The proposed structure has an overall height of 2.43m, a depth of 0.762m and a width of 1.096m

3.6m southwest of existing telephone kiosk outside The Embassy Take-away , Main Street , Celbridge

16m
181354N/A9 Nov 2018

a two storey extension to the rear of the existing dental surgery, removal of external fire escape stairs, internal modifications and all ancillary site works

Main Street , Celbridge , Co. Kildare.

23m
19944N/A21 Aug 2019

constructing a two storey extension to the rear of the existing Dental Practice, removal of external fire escape stairs, internal modifications and all ancillary site works

Main Street , Celbridge , Co. Kildare.

44m
17351CONDITIONAL3 Apr 2017

External works: demolition of non-original single storey extension to the rear of existing house, demolition of garden shed, new 2-storey extension to the rear, replacement of 1 over 1 sash windows with 6 over 6 sash windows to the front elevation, removal of non-original sand cement rough cast pebble dash to front elevation and application of new lime render to front elevation, removing fibre cement slates to roof and re-roofing with natural slates, repair of rain water gutters and downpipes, addition of 2 No. rooflights on the southeast facing pitch roof, addition of limestone slabs to front concrete steps and limestone capping to low concrete wall either side of front steps; Internal works: alteration to internal layout including removal of non-original partitions at basement and first floor level, new partitions at 1st floor level, widen rear door ope on rear wall at entrance level, removal of non-original fixtures and fittings, break down cill to staircase rear window to form door opening and relocation of original sash window in new location, decoration and all associated site works at this protected structure,

The Laurels , Main Street , Celbridge

49m
181062CONDITIONAL30 Aug 2018

retaining a partly completed storage compound constructed to the rear of the car park area which is used as an enclosed bin storage area; (b) Retaining a metal storage container situated within the compound which currently stores pub furniture; (c) Permission to complete the existing storage compound by construction a pergola roof, rendering existing walls and all ancillary site works

The Castletown Inn , Main Street , Donaghcumper

52m
201330N/A6 Nov 2020

Mixed use development, the proposed development consists of the demolition of the existing buildings on site (total demolition 335.2sqm) and the construction of a 3-storey building facing onto Main Street, accommodating 2 No. apartments, comprised of 1 No. 1 bed apartment and 1 No. 2 bed apartment. The 3-storey building will provide for a single office/retail unit at ground floor (85.5sqm). The proposed development provides for 11 No. two storey townhouses, comprised of 7 No. 3 bed units and 4 No. 4 bed units. Vehicular access to the development will be from Main Street, with 25 No. car parking spaces and 15 No. bicycle spaces provided. The development also provides for all associated site development works, hard and soft landscaping, boundary treatments, ground floor refuse/storage areas (20.4sqm) and associated signage all on a site of 0.34ha

Main Street , Donaghcumper , Celbridge

66m
201369REFUSED13 Nov 2020

Mixed use development, the proposed development consists of the demolition of the existing buildings on site (total demolition 335.2sqm) and the construction of a 3-storey building facing onto Main Street, accommodating 2 No. apartments, comprised of 1 No. 1 bed apartment and 1 No. 2 bed apartment. The 3-storey building will provide for a single office/retail unit at ground floor (85.5sqm). The proposed development provides for 11 No. two storey townhouses, comprised of 7 No. 3 bed units and 4 No. 4 bed units. Vehicular access to the development will be from Main Street, with 25 No. car parking spaces and 15 No. bicycle spaces provided. The development also provides for all associated site development works, hard and soft landscaping, boundary treatments, ground floor refuse/storage areas (20.4sqm) and associated signage all on a site of 0.34ha

Main Street , Donaghcumper , Celbridge

67m
201462CONDITIONAL2 Dec 2020

change of use of part of ground floor of existing commercial premises from previously permitted office use to restaurant use, including new waiting & dining area & private dining room, to connect to existing adjoining restaurant, alterations to rear yard to facilitate amendments including rearrangement of & provision of additional public & staff car parking, new external seating area, landscaping and all associated works, bin & bike stores etc,

No.3 Main Street , Celbridge , Co. Kildare

94m
2560739N/A3 Jul 2025

for two-storey extension to rear at together with revised car and cycle parking layouts, oil and general waste storage enclosures, standby generator and enclosure and associated site works

Celbridge Medical Centre and Pharmacy , Main Street , Celbridge

99m
22640CONDITIONAL27 May 2022

Shop alterations which comprise of: fitting of new branded signage (after removal of existing signage/or over existing signage) onto existing shopfront, replacement of existing ATM with new ATM (location retained). 2 No. internally located digital marketing LED screen, to be viewed externally through the existing glazing. Minor internal alterations to existing front banking hall to consist of new internal SSBM and ATM bunker rooms

Ulster Bank , Main Street Donaghcumper , Celbridge Co. Kildare.

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?