Callenders Mill , Celbridge , Co. Kildare

N/A

Planning application 23196

Kildare - Kildare County Council

Proposed Development

a new creche/childcare facility over 2 floors (circa. 254sq.m) new signage, bin storage, play area to rear, parking area/drop off zone to front and associated site works to comply with previously granted planning permissions 17/771 & 04/1371

View the full application file on the council's planning portal →

Application Details

Location
Callenders Mill , Celbridge , Co. Kildare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council

Timeline

Registration Date
2 March 2023
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

8m
17711CONDITIONAL19 Jun 2017

a single storey childcare crèche facility (floor area 128.69 sq.m) with 2 No. 2000mm x 700mm & 1 No. 2750mm x 950mm signs with back lighting and all associated site works. This application was granted previously under planning application reference number 04/1371.

Callenders Mill , Celbridge , Co. Kildare

8m
23347CONDITIONAL4 Apr 2023

for a new creche/childcare facility over 2 floors (circa. 254m2) new signage, bin storage, play area to read, parking area/drop off zone to front and associated site works to comply with previously granted planning permissions 17/711 & 04/1371. Revised by significant further information which consists of revised plans / Elevational Design Changes, in relation to the application.

Callenders Mill , Celbridge , Co. Kildare

9m
21828REFUSED8 Jun 2021

revision of existing planning permission Ref. 17/711, to create a new neighbourhood convenience unit, to include new revised entrance position, internal modifications, new signage, bin storage, delivery area to rear. Parking area to front and associated site works

Callenders Mill , Celbridge , Co. Kildare.

82m
211663CONDITIONAL24 Nov 2021

(a) Construction of a single storey extension to provide an enlarged living room and dining area; (b) Removal of existing chimney and new solar panel array to south facing roof, all to the front side and rear of the existing dwelling along with all associated site development and facilitating works including site landscaping

189 The Grove , Celbridge , Co. Kildare.

92m
211622N/A16 Nov 2021

for A) Construction of a single storey extension to provide an enlarged living room and dining area, B) Removal of existing chimney and new solar panel array to south facing roof, all to the front side and rear of the existing dwelling, along with all associated site development and facilitating works including site landscaping

189 The Grove , Celbridge , Co. Kildare.

94m
2460802CONDITIONAL19 Aug 2024

for the construction of a single storey kitchen / living extension to the rear, a garage conversion to the side and front with new flat roof, a porch enclosure to the front with new flat roof, to existing semi-detached dwelling and all associated site works

195 The Grove , Celbridge , Co. Kildare

98m
2460765N/A8 Aug 2024

for the construction of a single storey kitchen/living extension to the rear, a garage conversion to the side and front with new flat roof, a porch enclosure to the front with new flat roof, to existing semi-detached dwelling and all associated site works

195 The Grove , Celbridge , Co. Kildare

152m
20630N/A18 Jun 2020

retention of small garden shed (14 square metres) on shared boundary with house No. 23

24 Simmonstown Manor , Celbridge , Co. Kildare.

158m
2439N/A31 Jan 2024

development will consist of 2 no. single storey, retail shops (floor area shop (2) 44m2 on site c0.7 acre. Associated signage zone. Loading area, service yard with entrance gates at 1800mm high walls, and all associated site works.

C allenders Mill , Celbridge , Co .Kildare

162m
22552N/A12 May 2022

erection of a 3 bedroom, 2 storey, detached dwelling with vehicular access and associated site workss

Callenders Mill , Celbridge , Co. Kildare.

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?