Topline , Naas Industrial Estate , Maudlings
CONDITIONALPlanning application 23245
Kildare - Kildare County Council
Proposed Development
the construction of a new warehouse building with external canopy, modifications to the existing entrances and boundary fence, upgrades to the existing storm and foul drainage, concrete yard improvements, and all associated site works. Two existing warehouses shall also be demolished as part of the development at their existing warehouse distribution facility
View the full application file on the council's planning portal →Application Timeline
Application received
13 Mar 2023
Further information requested
2 May 2023
Further information received
24 Aug 2023
Decision: CONDITIONAL
14 Sept 2023
Decision due
20 Sept 2023
Grant issued
17 Nov 2023
Application Details
- Location
- Topline , Naas Industrial Estate , Maudlings
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 1.81 ha
Timeline
- Registration Date
- 13 March 2023
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 14 September 2023
- Grant Date
- 17 November 2023
- Permission Expires
- 16 November 2028
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the erection of a new 540sqm single storey warehouse building and associated site works
Naas Industrial Estate , Naas , Co. Kildare.
for The construction of a lean-to building and a counter sunk loading dock off the existing south east facing elevation of block C (previously granted planning permission 06/500091) with associated alterations and all associated site works.
Irish Dog Foods , Naas Industrial Estate , Fishery Lane Naas
to construct an extension to the existing facility which will consist of the construction of a freezer warehouse, marshalling area and two loading docks together with all ancillary site works. Also it is proposed to extend and revise the layout of the existing carpark, closing the present entrance from the adjacent roadway and constructing a new access to the east of the existing entrance including all associated site works
Unit 2 Naas Industrial Estate , Naas , Co. Kildare.
construct an extension to their existing facility. The proposed development will consist of the construction of a Freezer Warehouse, Marshalling Area and two Loading Docks together with all ancillary site works. Also it is proposed to extend and revise the layout of the existing carpark, closing the present entrance from the adjacent roadway and constructing a new access to the east of the existing entrance including all associated site works
Unit 2 , Naas Industrial Estate , Naas
construction of a single storey M.V. Substation and Switch room total area 24 sqm at the front elevation of Irish Dog Foods Limited (south-west elevation) and all ancillary works
Units 2 Naas Industrial Estate , Fishery Lane , Naas
revisions to existing North, South and West elevations. The revisions will consist of erection of new metal cladding façade, add and remove some windows and doors on the elevations, remove existing canopy and erection of parapet walls, together with all associated works, all
Naas Industrial Estate , Fishery Lane , Naas
proposed vehicle entrance to the rear of Irish Dog Foods on the North eastern boundary Which shall comprise of 2.4m high 4m wide motorized galvanized gate and all ancillary works
Naas Industrial Estate , Fishery Lane , Naas
the erection of a new 436.5sqm single storey Warehouse building and associated site works
Naas Industrial Estate , Naas , Co. Kildare
the erection of a new 540sqm single storey warehouse building and associated site works. Site boundary fence to be partially removed as proposed building to be constructed on the boundary line
Naas Industrial Estate , Naas , Co. Kildare
The development will consist of: (a) Demolition of Industrial Unit Nos. 17, 18 and 19 (550 sqm); (b) Construction of Industrial building extension (1954 sqm) to Production building for increased Manufacturing area and additional Loading Bays. This building will comprise Processing Area, Ovens, 3 No. Loading Bays all on ground floor, and on first floor (735 sqm) comprise offices, changing areas, canteen, toilet facilities and plant room; (c) Erection of signage on building; (d) And all ancillary works
Unit 2 Unit 17 Unit 18 and Unit 19 , Naas Industrial Estate , Fishery Lane
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?