← Back to search

5 Blackhall , Calverstown , Co.Kildare

N/A

Planning application 23832

Kildare - Kildare County Council

Proposed Development

Will consist of the renovation and extension of the dwelling house to include internal reconfigurations and addition of first floor accommodation associated increase of ridge height and addition of dormer roof extension to the rear and rooflights to the front elevation

View the full application file on the council's planning portal →

Application Details

Location
5 Blackhall , Calverstown , Co.Kildare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Floor Area
185 sq m
Residential Units
1

Timeline

Registration Date
4 August 2023
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

43m
23887CONDITIONAL7 Sept 2023

the renovation and extension of the dwelling house to include internal reconfigurations and addition of first floor accommodation associated increase of ridge height and addition of dormer roof extension to the rear and rooflights to the front elevation

5 Blackhall , Calverstown , Co.Kildare

385m
18594CONDITIONAL22 May 2018

a change of house type from previously permitted development (planning reference 16/1326)

Blackhall , Calverstown , Kilcullen

412m
17933REFUSED18 Aug 2017

construction of domestic house, insulation of secondary effluent treatment system together with all associated site works

Blackhall , Calverstown , Kilcullen

578m
201211REFUSED16 Oct 2020

a bungalow, wastewater treatment system and sand polishing filter, recessed residential entrance and all ancillary site development works,

Blackhall , Narraghmore , Co. Kildare

583m
2095CONDITIONAL7 Feb 2020

a bungalow, recessed residential entrance, wastewater treatment system and raised sand polishing filter, replace septic tank serving existing dwelling with new wastewater treatment system and raised sand polishing filter and all ancillary site development works

Ballybarney , Narraghmore , Co. Kildare.

604m
17156CONDITIONAL16 Feb 2017

a dormer style dwelling, domestic garage and associated site works. Revised by Significant Further Information which consists of change of house type from dormer style to single storey and alterations to site boundary

Blackhall , Calverstown , Kilcullen

636m
2561170CONDITIONAL14 Oct 2025

permission to construct an extension to dwelling house with necessary alterations and renovations to same dwelling. Full planning permission to demolish previously built sunroom and domestic shed to facilitate the proposed extension. Full planning permission to install a new wastewater treatment system and all associated site development works

Blackhall Calverstown , Kilcullen , Co Kildare

819m
201609REFUSED23 Dec 2020

Construction of a detached one and half storey dormer bungalow, single storey domestic garage, recessed entrance, secondary effluent treatment system and all associated site works.

Blackhall , Calverstown , Co. Kildare.

859m
17843CONDITIONAL20 Jul 2017

the construction of a detached single storey house containing 134.7 sq. metres, a detached garage of 35 sq. metres, alteration of existing vehicular access (which leads to an adjacent dwelling) to accommodate a new entrance, sewage treatment system and percolation area, public water supply connection, along with all associated site works, including landscaping. This site was sterilised pursuant to condition No. 3 of permission Reg. 94/575 and the application seeks to lift this restriction, so as to allow for the proposed development to proceed

Blackhall , Calverstown , Co. Kildare.

904m
19827CONDITIONAL23 Jul 2019

demolition of existing side conservatory with permission to construct a replacement single storey side extension, permission to nappe plaster the external façade of existing house and all associated site works

Blackhall Lane , Blackhall , Calverstown

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?