← Back to search

"The Pines" , Blessington Road , Naas

N/A

Planning application 23946

Kildare - Kildare County Council

Proposed Development

Planning permission is sought for the demolition of the existing single storey bedroom extension and sunroom to the rear, removal of the existing roof over the main house, addition of a first floor to the existing building, construction of a single storey extension to the front, replacement of all external windows and doors, internal and external elevational alterations, removal of the existing septic tank and a new connection to the existing foul drain on the road in front, all to the existing single storey detached dwelling.

View the full application file on the council's planning portal →

Application Details

Location
"The Pines" , Blessington Road , Naas
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council

Timeline

Registration Date
13 October 2023
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

18m
23962CONDITIONAL24 Oct 2023

the demolition of the existing single storey bedroom extension and sunroom to the rear, removal of the existing roof over the main house, addition of a first floor to the existing building , construction of a single storey extension to the front, replacement of all external windows and doors. internal and external elevational alterations, removal of the existing septic tank and a new connection to the existing foul drain on the road in front, all to the existing single storey detached dwelling

The Pines , Blessington Road , Naas

35m
20689CONDITIONAL1 Jul 2020

the demolition of the utility room to the rear of the existing house and the detached garden shed to the rear, the construction of a single storey extension complete with rooflights to the rear, the conversion of the existing garage and dormer area over to habitable space, complete with new dormer window, the replacement of all windows and external doors, minor internal and external alterations, the construction of a detached domestic garage/garden shed, all to the existing two storey detached dwelling

Whitegates , Blessington Road , Naas

49m
2560063CONDITIONAL28 Jan 2025

for 1. Retention of the existing dining area (17M/2) to the side, converted from a garage constructed with the original house and all associated ancillary site development works above and below ground, and will consist of, 2. Permission for a single storey extension (29M/2) to the side, two number roof windows to the existing dining area, a new fire escape roof window, alterations to the size and position of the existing first floor rear gable-end window and the addition of a new first floor rear gable-end window and all associated ancillary site development works above and below ground at my two-storey detached dormer dwelling

Number 362 , Sunday's Well , Naas

66m
2560039N/A22 Jan 2025

for the existing dining area (17M/2) to the side, converted from a garage that was constructed with the original house, and will consist of the construction of a single storey extension (29M/2) to the side, 2 number roof windows to the existing dining area, a new fire escape roof window, alterations to the size and position of the existing first floor rear gable-end window and the addition of a new first floor rear gable-end window and all associated ancillary development works above and below ground at my 2-storey detached dormer dwelling

Number 362 Sunday's Well , Naas , Co. Kildare

78m
221321CONDITIONAL7 Nov 2022

The development will consist of the change of use of existing integrated garage to habitable space consisting of two bedrooms and an en-suite as well as the construction of a two storey extension to the rear of existing detached dwelling and all associated site works

1 Alderwood Park , Naas , Co. Kildare

128m
22578CONDITIONAL18 May 2022

sought for new fencing to be installed over top of existing boundary wall on the Lacken View boundary of the school grounds, along with new gates and piers

Holy Child National School , Ballycane , Naas

172m
211823CONDITIONAL22 Dec 2021

(a) Proposed new single storey front and side extension to existing dwelling; (b) Demolition of existing garage to side of existing house along with all associated site development and facilitating works

105 Lacken View , Ballycane , Naas

180m
181226CONDITIONAL8 Oct 2018

A two storey rear extension to an existing two storey detached dwelling, associated alterations to side and rear elevations and all associated site works

10 Alderwood Park , Blessington Road , Naas

236m
18555CONDITIONAL14 May 2018

a single storey extension to the back of existing house, including two bedrooms, bathroom, utility room, wardrobe as well as demolition of garage

104 Mountain View , Naas , Co. Kildare.

255m
2560976CONDITIONAL28 Aug 2025

for (A) new single storey extension to side/rear of existing dwelling house, (B) internal modifications to tie in with new spaces, (c) revised window and door arrangements (D) landscaping, connection to all existing site services and all associated site development works

38 Mountain View , Naas , Co. Kildare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?