Ballynafagh Springs , Cooleragh East , Coill Dubh
CONDITIONALPlanning application 24165
Kildare - Kildare County Council
Proposed Development
52 no. two-storey dwellings consisting of 34 no. semi-detached 3-bedroom houses, 12 no. semi-detached 4-bedroom houses, 6 no. semi-detached 2-bedroom houses, pedestrian access to adjoining 'The Meadows' housing estate and all ancillary siteworks on site previously granted planning permission under file ref. 07/1186, 13/143 & 14/833. Revised by significant further information consisting of; Proposal reduced to 51 no. dwellings comprising: 32 no. 3 bed semi-detached, 12 no. 4 bed semi-detached , 6 no. 2 bed semi-detached & 1 no. 3 bed semi-detached two storey dwellings as per Pl. Ref 18/851
Application Timeline
Application received
20 May 2024
Decision: CONDITIONAL
3 Jul 2024
Decision due
14 Jul 2024
Grant issued
14 Aug 2024
Application Details
- Location
- Ballynafagh Springs , Cooleragh East , Coill Dubh
- Applicant
- N/A
- Application Type
- EXTENSION OF DURATION
- Planning Authority
- Kildare County Council
Timeline
- Registration Date
- 20 May 2024
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 3 July 2024
- Grant Date
- 14 August 2024
- Permission Expires
- 2 July 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
erection of bungalow, garage for domestic use and the installation of Sepcon wastewater treatment system and percolation area as per Pl. Ref. 18/851
Ballynafagh Springs , Cooleragh East , Coill Dubh
a mixed use development consisting of: 1. Demolition of the existing petrol service building, shop, attached residence and shed for commercial use to rear. Removal of existing signage, gates to rear, underground tanks and all other existing ancillary site elements to prepare the site for new development. 2. Erection of replacement 2-storey service station building (Building A) which will contain 1 no food offers including seating (60sqm), a retail area (86.2sqm) and back of house area (70.3sqm). 2 no independent office spaces (44sqm & 48sqm) and 4 no residential apartments on first floor. The number of fuel dispensing pumps will be expanded from 1 single sided pump to 2 double sided pumps (on one island), replacement commercial fuel pump. Provision of pump station canopy to be erected displaying fuel branding signage. Provision of 2 no new signs/branding at entrance and one new totem sign. 15 car parking spaces provided for retail, 6 car parking for office and 5 car parking for residences. Total of 26 parking spaces provided to service block A and 10 bicycle parking spaces. All associated site works including landscaping, drainage, lighting, refuse compound, relocated vent pipes, making good boundary walls, service bay and new bollards to front of service building and a landscaped hardstanding area with seating in front of building A. 3. Erection of 2-storey apartment building (Building B) with 4 no wheelchair accessible apartments (2 no bedroom) and 4 no wheelchair accessible apartments (1 no bedroom). 10 parking spaces provided to service block B, refuge compound, 10 bicycle parking spaces and all other ancillary site works. 4.8 no 2-storey houses which will be an extension to the existing approved estate (under construction planning file 18/851). Consisting of: 4 no detached houses (4-bedroom), 2 no semi-detached houses (3 bedroom) and 2 no semi-detached (2 bedroom). These new houses will connect directly into existing estate and include all additional open space and extension of all ancillary services. 5. Revised design for portion layout granted planning permission under planning file 18/851. This redesigned area of the existing site to include the removal of existing 8 no 2-storey semi-detached houses and to replace it with 4 no detached houses (4 bedroom), 1 no semi-detached (4 bedroom), and 1 no semi-detached (3 bedroom). 6.Revised design for portion of access road, landscaping and open space granted planning permission under planning file 18/851
Cooleragh East , Coill Dubh , Naas
52 no. two-storey dwellings consisting of 34 no. semi-detached 3-bedroom houses, 12 no. semi-detached 4-bedroom houses, 6 no. semi-detached 2-bedroom houses, pedestrian access to adjoining 'The Meadows' housing estate and all ancillary siteworks on site previously granted planning permission under file ref. 07/1186, 13/143 & 14/833. Revised by significant further information consisting of; Proposal reduced to 51 no. dwellings comprising: 32 no. 3 bed semi-detached, 12 no. 4 bed semi-detached , 6 no. 2 bed semi-detached & 1 no. 3 bed semi-detached two storey dwellings
Cooleragh East , Coill Dubh , Naas
A Mixed-use development. 1. Demolition of the existing petrol service building, shop and attached residence, and shed for commercial use to rear. Removal of existing signage, gates to rear, underground tanks, and all other existing ancillary site elements to prepare the site for new development. 2. Erection of replacement two storey service station building (Building A) which will contain 1 no. food offers including seating (60sq.m), a retail area of (86. 2sq.m), and back of house area (70.3sq.m). 2 no. independent Office spaces (44sq.m & 48sq.m). and 4 no. residential apartments on first floor. The number of fuel dispensing pumps will be expanded from 1 single sided pump to two double sided pumps (on one island), replacement commercial fuel pump. Provision of pump station canopy to be erected displaying fuel branding signage. Provision of 2 no. new signs/branding at entrance and one new totem sign. 15 car parking spaces provided for retail, 6 car parking for office and 5 car parking for residences. Total of 26 parking spaces provided to service block A and 10 bicycle parking spaces. All associated site works including landscaping, drainage, lighting, refuse compound, relocated vent pipes, making good boundary walls, service bay, and new bollards to front of service building and landscaped hardstanding area with seating in front of building A. 3. Erection of two storey apartment building (Building B), with 4 no. wheelchair accessible apartments (2 no. bedroom) and 4 no. wheelchair accessible apartments (1 no. bedroom). 10 parking spaces provided to service block B, refuge compound, 10 bicycle parking spaces and all other ancillary site works. 4. 8. No. 2 storey houses which will be an extension to the existing approved estate (under construction planning file 18/851). Consisting of: 4. No. detached houses (4-bedroom), 2. semi-detached houses (3 bedroom) and 2 No. Semi-detached (2 bedroom). These new houses will connect directly into existing estate and include all additional open space and extension on ancillary services. 5. Revised design for portion layout granted planning permission under planning file 18/851. This redesigned area of the existing site to include the removal of existing 8. No 2-storey semi-detached houses and to replace it with 4. No. detached houses (4-bedroom), 1 No. semi-detached (4-bedroom), and 1 No. 4 semi-detached (3-bedroom) contd...…
Cooleragh East , Coill Dubh , Naas
Extension of Duration of Planning Ref. 14/930 - (a) demolition of existing single storey house; (b) erection of replacement dormer type house; (c) garage/fuel store for domestic use and all associated site development works
Cooleragh East , Coill Dubh , Co. Kildare.
a dormer style bungalow with a proprietary waste water treatment system and percolation area and all associated site works
Coolearagh East , Timahoe , Clane
for 1) demolition of existing outbuildings; 2) demolition of existing lean-to extensions, internal alterations and extension to existing two-storey residential house; 3) Construction of 22 no. Dwellings. The dwellings will consist of 4 no. 2-storey 4-bed detached houses, 4 no. 2-storey 4-bed semi-detached houses, 10 no. 3-bed 2-storey semi-detached houses & 1 no. 2-storey apartment block containing 2 no. 2-bed units and 2 no. 1-bed units and adjoining bike and bin store; 4) 2 no. new recessed access roads off the L1019; 5) Access for house number 19 from Síog na Móna housing development; 6) pedestrian connection to Cois na Móna housing development; 7) Decommissioning of existing septic tank; and 8) All associated ancillary site-works
Cooleragh , Coill Dubh , Co. Kildare
Revision to planning file 19/530 for the construction of an additional detached two-storey house, (three houses in total), revised boundaries and all ancillary site works
Cooleragh West , Coill Dubh , Co. Kildare.
Demolishing existing agricultural outbuildings and sheds and constructing 2 no. 2 – storey detached dwellings and all ancillary site works
Cooleragh West , Coill Dubh , Co. Kildare.
of alterations as constructed to a house previously approved in file 19/530. The alterations include a single storey extension to the rear, conversion of attic space to a bedroom, & minor alterations to elevations. Full planning permission is sought for change of use to guest house, and all associated ancillary site-works
1 Siog Na Mona , Cooleragh Coill Dubh , Naas
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?