Proposed Development
for the importation of soil and stone material to infill and re-contour the subject site. Once the importation is complete, the applicant will seed the land in line with Teagasc guidelines and return it to agricultural use. The Operational Phase will see the 4.28 hectare site being used as pastureland for horses. The applicant proposes, subject to planning, to import clean greenfield soil and stone to remediate approximately 3.82 ha of the total site. The 3.82 ha is divided into four distinct areas - Phase Area 1 is 0.99 ha, Phase Area 2 is 1.40ha, Phase Area 3 is 1.11ha, and Phase Area 4 is 0.31ha. A plan has been drawn up for the importation of approximately 52,765.5 tonnes to fill Phase Area 1, 40,749 tonnes to fill Phase Area 2, 23,937 tonnes to fill Phase Area 3, and 4,551 tones to fill Phase Area 4, equating to a total of 122,002.5 tonnes. Permission is being sought for a 5- year period and will be subject to a waste facility permit
View the full application file on the council's planning portal →Application Timeline
Application received
26 Jan 2024
Decision: REFUSED
20 Mar 2024
Decision due
21 Mar 2024
Application Details
- Location
- Wolfestown , Eadestown , Naas
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 4.28 ha
Timeline
- Registration Date
- 26 January 2024
- Status
- APPLICATION FINALISED
- Decision
- REFUSED
- Decision Date
- 20 March 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
sought to infill the subject site of 28.86 hectares in order that the site, which is presently a disused sand and gravel pit, can be restored to agricultural use in keeping with the surrounding land use. The applicant proposes, subject to planning, to operate this facility as an infill facility for inert non-hazardous soil and stone. The incoming soil and stone will be deposited on site and the site contoured to final restoration levels. These will be designed in order to ensure that the restored site will be fully in keeping with the surrounding landscape. It has been estimated that there is approximately 1.8 million tonnes of void space remaining within the site. The applicant proposes to fill this at approximately 200,000 tonnes per annum. The applicant also proposes to install a site office and canteen, weighbridge, wheel-wash, new entrance, internal haul road and carry out all ancillary site works. The application relates to an activity requiring a Waste Licence from the Environmental Protection Agency. The application is accompanied by an Environmental Impact Statement (now referred to as an Environmental Impact Assessment Report (EIAR). All works
Wolfstown , Eadestown , Naas
for existing single storey house asconstructed on site (including new location and orientation on site), retention of relocation of access driveway on site and all associated site works
Wolfestown , Eadestown , Naas
the construction of a detached single storey bungalow, single storey domestic garage, secondary effluent treatment system, access via existing agricultural entrance with proposed new replacement entrance and all associated site works
Wolfestown , Eadestown , Naas
existing single storey house as construction on site (including new location and orientation on site), retention of relocation of access driveway on site and all associate site works
Wolfestown , Eadestown , Naas
For existing single storey house as constructed on site (including new location and orientation on site), retention of relocation of access driveway on site and all associated site works
Wolfestown , Eadestown , Naas
sought to infill the subject site of 28.86 hectares in order that the site, which is presently a disused sand and gravel pit, can be restored to agricultural use in keeping with the surrounding land use. The applicant proposes, subject to planning, to operate this facility as an infill facility for inert non-hazardous soil and stone. The incoming soil and stone will be deposited on site and the site contoured to final restoration levels. These will be designed in order to ensure that the restored site will be fully in keeping with the surrounding landscape. It has been estimated that there is approximately 1.8 million tonnes of void space remaining within the site. The applicant proposes to fill this at approximately 200,000 tonnes per annum. The applicant also proposes to install a site office and canteen, weighbridge, wheel-wash, new entrance, internal haul road and carry out all ancillary site works. The application relates to an activity requiring a Waste Licence from the Environmental Protection Agency. The application is accompanied by an Environmental Impact Statement (now referred to as an Environmental Impact Assessment Report (EIAR).
Wolfstown , Eadestown , Naas
to construct a bungalow, domestic garage, recessed entrance, secondary effluent treatment system, with all facilitating and associated site works all
Wolfestown , Eadestown , Naas
for alterations and modifications to that granted to planning file reference 19/718. Namely, to retain the dwelling, its floor plan, its elevations and its location on site, also the location of the recessed entrance and with all facilitating and associated site works.
WOLFESTOWN , EADESTOWN , NAAS
the construction of a detached single storey house, single storey domestic garage, recessed entrance, secondary effluent treatment system and all associated site works
Wolfestown , Eadestown , Naas
sought for part two storey dormer style single family dwelling (with habitable accommodation within roof space) and detached ancillary single storey store/farm animal shelter housing, proprietary on-site wastewater treatment system and associated percolation area, relocation and widening of existing site access to form new vehicular entrance together with all associated landscaping development works at (Townland: part Wolfestown part Eadestown, Barony: Naas North)
Wolfestown / Eadestown , Naas , Co. Kildare.