← Back to search

Unit 2b , Courtyard Shopping Centre , Newbridge

N/A

Planning application 2460329

Kildare - Kildare County Council

Proposed Development

for change of use of existing unit from Retail use to Office use together with new signage onto existing signage band to the front of the unit, and associated site works

View the full application file on the council's planning portal →

Application Details

Location
Unit 2b , Courtyard Shopping Centre , Newbridge
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
0.006 ha

Timeline

Registration Date
18 April 2024
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

4m
2460348CONDITIONAL22 Apr 2024

for the change of use of existing unit from Retail use to Office use together with new signage onto existing signage band to the front of the unit, and associated site works

Unit 2b , Courtyard Shopping Centre , Edward Street Newbridge

4m
2181CONDITIONAL27 Jan 2021

the material change of use of Block A (Unit 1A/2C) from Retail to Offices, which comprises of Interior modifications and alterations & all ancillary site works

Unit 1A/2C Block A , The Courtyard Shopping Centre , Edward Street Newbridge

13m
21324CONDITIONAL15 Mar 2021

change of use of existing retail and office unit at No. 3 The Courtyard Shopping Centre, Newbridge, to dental/medical use comprising surgical facilities, consulting rooms, offices and associated ancillary services together with alterations to shop fronts and associated signage

No. 3 The Courtyard Shopping Centre , Newbridge , Co. Kildare.

43m
19553CONDITIONAL17 May 2019

An extension to the Shopping Centre by the erection of a new single storey glazed customer lobby measuring 55sq m, and all associated site works.

Whitewater Shopping Centre , Newbridge , Co. Kildare.

48m
17798CONDITIONAL7 Jul 2017

(a) Amalgamating Units 5 and 6 by part demolition of internal party wall on the ground floor; (b) Proposed signage and minor modifications to elevations and internal layout; (c) And all ancillary works

Units 5 &6 Block C The Courtyard Shopping Centre , Edward Street , Newbridge

49m
201121CONDITIONAL29 Sept 2020

of: (a) Amalgamation of ground floor units 7 and 8 into one unit referred to as Unit 8. (b) Change of use of this unit 8 from retail to pharmacy. (c) Retention of signage external and internal visible through glazing. Permission for: (d) Change of use from retail to pharmacy on Unit 9A. (e) Amalgamation of Unit 9A with existing pharmacy in Unit 8. (f) Proposed new external signage. (g) Modifications of elevations. (h) And all ancillary works

Units 7 8 & 9A Block B , The Courtyard , Edward Street

50m
2460264CONDITIONAL27 Mar 2024

change of use from retail unit granted under ref 06/892 to medical centre as constructed along with new signage to front of building and all associated site development works

Edward street , Newbridge , Co. Kildare

54m
191002CONDITIONAL6 Sept 2019

the demolition of an existing retail unit (28sqm), external seating and canopies; construction of one new retail unit (123sqm) and one new café unit (139sqm); creating of new central meeting point on The Avenue with replacement pedestrian canopy, seating, hard and soft landscaping; and all associated site works

External Pedestrianised Avenue , Whitewater Shopping Centre , Newbridge

67m
2360473CONDITIONAL12 Dec 2023

the change of use of existing single story retail unit for mixed use development as a coffee shop with take away facility, sit down restaurant with take-away facility, new front door and front façade arrangement, external retractable canopy and external seating area (on private lands) with removable wind screens and all associated site works

Edward Street , Newbridge , Co. Kildare

67m
231026N/A11 Dec 2023

a change of use from two-storey retail unit to a two-storey Healthcare Clinic (196sqm), which comprises waiting area, assessable W/C, offices and consultation rooms. Extending first floor mezzanine by 27sqm. The external elevations will remain unchanged

Unit 10 , Edward Street , Newbridge

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?