within the townlands of Droichead Nua (Newbridge) , and Old Connell Naas Road , Newbridge
CONDITIONALPlanning application 2460412
Kildare - Kildare County Council
Proposed Development
for phase 1 of a 2 phase residential development for some 126 no dwellings on a wider site are of c4ha. The phase 1 will consist of
- A)The construction of 40 no. residential dwellings and a creche comprising: 32 no. houses (26 no. 3 bedroom dwellings [2 storey] and 6 no. 4 bedroom houses [3 storey]) and 8 no. apartments/duplex apartments comprising 1 no. 2 bedroom apartment and 1 no. 3 bedroom duplex apartment in a separate end of terrace (3 storey) arrangement in 4 locations throughout the site (with apartments/duplex units to include balcony or terrace/private amenity space)
- B)Vehicular/pedestrian and cyclist access from the Naas Road along with upgrades to the existing vehicular, pedestrian, cyclist and public transport infrastructure along the Naas Road including; the installation of new segregated cycle lanes either side of the Naas Road; a relocated bus stop location at the northern section of the Naas Road and upgraded bus stop at the southern section; a toucan pedestrian crossing across the Naas Road, revised carriageway, and enhanced pedestrian pathways
- C)The provision of 62 no. surface resident car parking spaces (including visitor and creche) as well as bicycle storage for apartments; internal road and shared surface networks including pedestrian and cycle paths
- D)A 2 storey creche of c. 222 sq. m (with associated play area and parking)
- E)Provision of c. 0.57 ha of public open space including proposed central square, as well as linear parkways as well as outdoor play areas, and landscaped planting
- F)Provision of foul and surface water drainage as well as bin stores; public lighting and all associated landscaping and boundary treatment works, site development and infrastructural works, ESB substations, and all ancillary works necessary to facilitate the development (the proposed development will provide all roads, services [foul & attenuation] and landscaping for the Phase 1 and Phase 2 sites) on this 2.84 ha site
Application Timeline
Application received
10 May 2024
Further information requested
3 Jul 2024
Further information received
20 Sept 2024
Decision due
28 Nov 2024
Decision: CONDITIONAL
28 Nov 2024
Grant issued
20 Jan 2025
Application Details
- Location
- within the townlands of Droichead Nua (Newbridge) , and Old Connell Naas Road , Newbridge
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 2.84 ha
- Floor Area
- 4015.599999999998 sq m
- Residential Units
- 32
Timeline
- Registration Date
- 10 May 2024Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 28 November 2024
- Grant Date
- 20 January 2025
- Permission Expires
- 19 January 2030
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
single storey extension to the rear of my house. The development will consist of a bedroom extension, a kitchen/living room extension, and minor alterations to the boundary walls at the front of the house, and all associated site works
700 Old Connell Cottages , Newbridge , Co. Kildare W12 TC99.
a storey-and-a-half house in the side/rear garden of Paul's parent's house, demolition of existing domestic shed, and all associated site works
698 Old Connell , Newbridge , Co. Kildare.
single storey shop unit, associated signage, canopy, new site entrance, car parking area, bin storage area, boundary walls, gates and all associated site development works at junction of Naas Road and St.Conleth's Avenue/Hawthorn Close, Newbridge, Co.Kildare. Planning permission has been granted previously on planning permission register reference 17/1039 for demolition of existing habitable single storey bungalow on site
Juntion of Nass Road & St.Conleth's Avenue/Hawthorn Close , Newbridge , Co.Kildare
variation to planning permission register reference 19/22 to include construction of 2 no. semi-detached three bedroom two storey dwelling houses, including new site entrances to St. Conleths Avenue/Hawthorn Close, car parking and all associated site development works including boundary walls
St. Conleth's Avenue/Hawthorn Close , Naas Road , Newbridge
single storey shop unit, associated signage, canopy, new site entrance, car parking area, bicycle parking area, bin storage area, boundary walls, gates and all associated site development works
at junction of Naas Road and St. Conleth's Avenue/Hawthorn Close , Newbridge , Co. Kildare.
(a) Sub-division of existing site granted planning permission on planning register reference 19/22; (b) Erection of 2 No. semi-detached three bedroom two storey dwellinghouses, including new site entrances to St. Conleth's Avenue/Hawthorn Close, car parking and all associated site development works including boundary walls. The granting of planning permission for this proposed development will involve a variation to planning permission register reference 19/22. All development to take place
St. Conleth's Avenue/Hawthorn Close , Newbridge , Co. Kildare.
of “Granny Flat” with ancillary attic storage including Velux roof lights as constructed to the rear of existing two-storey dwelling house known as
13 Sycamore Road , Connell Drive , Newbridge
the construction of a new temporary single storey prefabricated building containing 1 no. technology classroom and 1 no. preparation room to be located to the rear / north of the existing main school building and adjacent to the playing fields together with all other ancillary and associated siteworks
Patrician Secondary School , Naas Road , Newbridge
(a) 20 classroom temporary system buildings of part 1 and part 2 storeys, of 1,600sqm in area, to be removed on completion of the development. (b) the removal of existing single storey prefabricated structures of 992sqm on completion of the development. (c) the refurbishment and extension of the primary school will consist of:(a) new 2 storey building providing 9 no. classrooms and support spaces with floor area of 686sqm; (b) reconfiguration and refurbishment of 5 no. classrooms and associated support spaces in existing school building. (d) the refurbishment and extension of the infant school will consist of: (a) new 2 storey building providing 9 no. classrooms and support spaces with floor area of 531sqm; (b) new double height general purpose hall and support spaces with a floor area of 272sqm; (c) reconfiguration and refurbishment of 7 no. classrooms and associated spaces in existing school building (e) new special needs unit 1 storey extension, providing 3 no. special needs unit classrooms and associated spaces with a floor area of 649sqm and a new 1 storey link corridor, with a floor area of 47sqm. (f) external works will include 4 no. ballcourts 2,340sqm, 2 no. junior play areas of 860sqm, a secure hard and soft play area of 200sqm, a sensory garden of 100sqm, a total of 66 car park spaces, widening and associated works to the existing vehicular entrance, proposed new 7000mm wide opening in existing boundary wall to accommodate re-configured road/exit off main Naas Road R445 to the South/Eastern boundary of the site, new gates and associated site landscape works (g) Temporary construction/school entrance to the South/Eastern corner boundary of the site formed off main Naas Road R445 for the duration of the construction period. Reinstatement of the existing boundary wall once works are complete (h) All associated and ancillary site works on an overall site area of 1.95 hectares
Naas Road , Newbridge , Co. Kildare
(a) 20 classroom temporary system buildings of part 1 and part 2 storeys, of 1,600sqm in area, to be removed on completion of the development. (b) the removal of existing single storey prefabricated structures of 992sqm on completion of the development. (c) the refurbishment and extension of the primary school will consist of:(i) new 2 storey building providing 9 no. classrooms and support spaces with floor area of 686sqm; (ii) reconfiguration and refurbishment of 5 no. classrooms and associated support spaces in existing school building. (d) the refurbishment and extension of the infant school will consist of: (i) new 2 storey building providing 9 no. classrooms and support spaces with floor area of 531sqm; (ii) new double height general purpose hall and support spaces with a floor area of 272sqm; (iii) reconfiguration and refurbishment of 7 no. classrooms and associated spaces in existing school building. (e) new special needs unit 1 storey extension, providing 3 no. special needs unit classrooms and associated spaces with a floor area of 649sqm and a new 1 storey link corridor, with a floor area of 47sqm. (f) external works will include 4 no. ballcourts 2,340sqm, 2 no. junior play areas of 860sqm, a secure hard and soft play area of 200sqm, a sensory garden of 100sqm, a total of 66 car park spaces, widening and associated works to the existing vehicular entrance, a new vehicular exit road, and associated site landscape works on an overall site area of 1.95hectares
St Conleths Infant School & St Conleth & Mary's Primary School , Naas Road , Newbridge
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?