← Back to search

Oldgrange , Monasterevin , Co Kildare

REFUSED

Planning application 2461155

Kildare - Kildare County Council

Proposed Development

for the sub-division of existing site for permission for the construction of a single-story bungalow in rear garden of family lands, secondary effluent treatment system and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    2 Nov 2024

  2. Further information requested

    12 Dec 2024

  3. Further information received

    10 Mar 2025

  4. Decision: REFUSED

    3 Apr 2025

  5. Decision due

    6 Apr 2025

Application Details

Location
Oldgrange , Monasterevin , Co Kildare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
0.18 ha
Floor Area
217 sq m
Residential Units
1

Timeline

Registration Date
2 November 2024
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
3 April 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

6m
2461132N/A30 Oct 2024

for the sub-division of existing site for permission for the construction of a single-story bungalow in rear garden of family lands, secondary effluent treatment system and all associated site works

Oldgrange , Monasterevin , Co. Kildare

64m
2360311CONDITIONAL19 Oct 2023

for 1. alterations to a one storey detached house to include revised front roof profile, revised location of front and rear doors, removal of a front window and removal of a side window, 2. septic tank & percolation area, 3. two detached one storey sheds all as constructed and all associated siteworks. The house was previously granted planning permission under planning reference no. 81/578.

Oldgrange , Monasterevin , Co. Kildare

112m
221075REFUSED2 Sept 2022

the construction of a single storey detached bungalow; single storey domestic garage; recessed entrance, secondary effluent treatment system and all associated site works

Barraderra , Monasterevin , Co. Kildare

115m
211318REFUSED15 Sept 2021

for the construction of a single storey detached bungalow, single storey domestic garage, recessed entrance, secondary effluent treatment system and all associated site works

Barraderra , Monasterevin , Co. Kildare.

122m
2561137N/A8 Oct 2025

for the construction of a two-storey detached dwelling, single storey domestic garage, recessed entrance, secondary effluent treatment system and all associated site works

Barraderra , Monasterevin , Kildare

138m
2561140REFUSED8 Oct 2025

for the construction of a two-storey detached dwelling, single storey domestic garage, recessed entrance, secondary effluent treatment system and all associated site works

Barraderra , Monasterevin , Kildare

146m
22217CONDITIONAL28 Feb 2022

development consists of a single storey detached garage with attached lean to "fuel store", surface water to soakaways and all associated site works

Barraderra , Monasterevin , Co. Kildare.

151m
1944N/A22 Jan 2019

of a single storey detached garage with attached lean to "fuel store", surface water to soakaways and all associated site works

Barraderra , Monasterevin , Co. Kildare.

204m
211032REFUSED13 Jul 2021

a 1.5 storey house, effluent treatment system & polishing filter, recessed entrance and all associated site works

Barraderra , Monasterevin , Co. Kildare

234m
211189CONDITIONAL17 Aug 2021

retention and completion of change of house type B (3 bed 2-storey semi-detached house), granted under Pl. Ref. 19/1393, to house type A (4 bed 2-storey semi-detached house with attic accommodation) on site 33 The Birches. It also consists of change of house type B (3 bed 2-storey semi-detached house), granted under Pl. Ref. 19/1431, to house type A (4 bed 2-storey semi-detached house with attic accommodation) on sites 26 and 27 The Green and all associated ancillary siteworks

The Birches and The Green , Oldgrangewood , Monasterevin

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?