R415 (Nurney Road) Greyabbey Townland Kildare Town Co. Kildare , bounded generally by the M7/M7 junction no.13 to the north , Grey Abbey View residential estate to the south

CONDITIONAL

Planning application 2535

Kildare - Kildare County Council

Proposed Development

for the provision of a managed car park with shuttle bus service, accommodating 345 no. spaces on a site of c.1.256 hectares. The development also includes works to extend the existing vehicular access (off the R415) and provision of a gated vehicular entrance, the provision of a bus shelter, associated set down area, signage, boundary fencing, lighting, landscaping and all associated site works and services including a generator and temporary staff welfare facilities

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    17 Feb 2025

  2. Further information requested

    8 Apr 2025

  3. Further information received

    7 May 2025

  4. Decision: CONDITIONAL

    28 May 2025

  5. Decision due

    3 Jun 2025

  6. Grant issued

    11 Jul 2025

Application Details

Location
R415 (Nurney Road) Greyabbey Townland Kildare Town Co. Kildare , bounded generally by the M7/M7 junction no.13 to the north , Grey Abbey View residential estate to the south
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
1.256 ha

Timeline

Registration Date
17 February 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
28 May 2025
Grant Date
11 July 2025
Permission Expires
10 July 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

79m
2460594CONDITIONAL1 Jul 2024

for the provision of three motor showrooms in two buildings and a valeting and wash building; comprising of ‘Building ‘A’, single storey motor sales showroom and service workshop facility with associated ancillary spaces, with a total gross floor area of 1,567 sq.m. (maximum height of c. 8m); ‘Building ‘B’, single storey motor sales showrooms (with mezzanines) and service workshop facility with associated ancillary spaces, with a total gross floor area of 2,326 sq.m. (maximum height of c. 8m); ‘Building ‘C’, single storey motor valeting and wash facility, solely for use as part of the vehicle serving business, with a total gross floor area of 375 sq.m. (maximum height of c. 5m). The development will also comprise: illuminated signage on the building facades; 4no. free-standing double-sided illuminated pylon sign; 3 no. flag poles with double-sided flags; revisions to existing site entrance, customer and staff car parking; bicycle parking; new and used vehicle display parking; vehicle storage area and service parking; electric vehicle charging points; associated lighting; hard and soft landscaping including the provision of boundary treatments, gates, fencing, walls and bollards; SUDs measures; associated site servicing (foul and surface water drainage and water supply); and all other site excavation and development works above and below ground.

1.611 hectares of lands bounded by the M7 / M7 Junction no. 13 to the north the R415 (Nurney Road) to the east the access road to the Junction 13 service station to the south and currently undeveloped lands to the west , Greyabbey (townland) , Kildar

106m
2560720CONDITIONAL27 Jun 2025

to modify a planning permission granted under Reg. Ref. 24/60594 for 3 no. motor showrooms and a valeting and wash building along with associated works on lands bounded by the M7 / M7 Junction no. 13 to the north, the R415 (Nurney Road) to the east, the access road to the Junction 13 service station to the south and currently undeveloped lands to the west Greyabbey (townland), Kildare, Co. Kildare. The proposed modifications consist of the following: a) the construction of a 45.6 sq.m. single storey extension to permitted building ‘C’ (single storey vehicle wash & valeting building). b) omission of condition nos. 7, 8, 9 and 10 relating to the provision of a cycle track to the east of the site along the R415. c) the proposal will now provide for a revised cycle track along the eastern boundary up to the existing Toucan crossing along the R415 and the reservation of lands for future cycle provision along the remainder of the eastern boundary (north of the Toucan crossing)

lands bounded by the M7 / M7 Junction no. 13 to the north the R415 (Nurney Road) to the east , the access road to the Junction 13 service station to the south and currently undeveloped lands to the west , Greyabbey (townland) Kildare Co. Kildare

108m
1978CONDITIONAL30 Jan 2019

The development will consist of the provision of a managed car park (with shuttle bus service ) accommodating 345 no. spaces on a site of c.0.94 hectares. The development also includes works to the existing vehicular access (off the R415), the provision of a bus shelter with the associated set down area, boundary fencing, signage, lighting and all associated site services, landscaping, site works and alterations to site levels.

R415 (Nurney Road) , Greyabbey Townland , Kildare Town

109m
221234CONDITIONAL17 Oct 2022

For permission and retention permission for a temporary period of three years for development at R415 (Nurney Road) Greyabbey Townland, Kildare Town, Co Kildare. The development will consist of: i) permission for the continuation of use of a managed car park (with shuttle bus service) accommodating 345 no. spaces, boundary fencing, lighting, landscaping and all associated site services and site works on a site of c0.9 hectares and permission for the relocation of the bus shelter with associated set down area and sign (all perviously permitted under Reg. Ref. No. 19/78); and ii) retention permission for the relocated vehicular entrance for the car park off the internal access road (from the roundabout on the R415).

R415 (Nurney Road) , Greyabbey Townland , Kildare Town

157m
201587CONDITIONAL22 Dec 2020

(i) A double sided, internally illuminated main identification totem sign located to northern boundary of petrol filling station approved under Planning Register Reference 04/2974, and (ii) All associated site and development works on lands

Greyabbey , Kildare , Co. Kildare.

171m
2360405CONDITIONAL23 Nov 2023

a change of use to part of the retail unit to an ancillary off-licence at ground floor level measuring c. 25.2 sqm within the approved convenience retail unit including all associated site works and services. Development was previously permitted under the parent application Reg. Ref. 04/2974 (extended by Reg. Ref. 16/1360 and amended by Reg. Ref. 22/659)

Centra Emo Station , Greyabbey , Kildare Co. Kildare

173m
21960CONDITIONAL1 Jul 2021

installation of internally illuminated signage to the north, south, east and west elevations of the petrol filling station building (under construction) approved under planning register reference 04/2974

Greyabbey , Kildare , Co.Kildare

179m
22659CONDITIONAL31 May 2022

a single storey extension accommodating customer seating and toilets and internal reconfiguration of the service station amenity building

Centra Junction 13 , Greyabbey , Kildare

206m
181532CONDITIONAL18 Dec 2018

Extension of duration 07/1211. Development consisting of change use and all associated site works for building no's 8.1,8.2,8.3 & 7.5(c) and the omission of building no 8.4 and its replacement with 10 no.residential units which formed part of the neighbourhood centre.

Greyabbey , Kildare Town , Co. Kildare

240m
2360077CONDITIONAL31 Jul 2023

for a 7 year planning permission for development on a site of c. 23.4 hectares bounded generally by the M7/M7 Junction no. 13 to the north, residential development under construction (‘Grey Abbey View’) to the south, and the R415 to the east and undeveloped agricultural lands to the west. The development will consist of the construction of 2 no. light industrial buildings of c.61,472 sq. m (for the purpose of timber frame/light gauge steel manufacturing) A) All site clearance and enabling works required to facilitate the development; B) Building A (Factory unit A) will comprise c. 38,124 sq. m GFA) - height of c.17.1 metres (with a partial cladding element extending 1m above roofline on elevations up to 18.1m) and which includes 2,185 sq. m of support and staff welfare facilities, kitchen and dining facilities, warehouse/storage space, and ancillary office space at ground and first floor levels, water tanks, recycling area along with signage on elevations (2 no. types); C) Building B (Factory unit B) will comprise c. 23,348 sq. m GFA) - height of c.17.1 metres (with a partial cladding element extending 1m above roofline on elevations up to 18.1m) and which includes c. 2,185 sq. m of support and staff welfare facilities, kitchen and dining facilities, warehouse/storage space, and ancillary office space at ground and first floor level with signage on elevations (2 no. types); D) Provision of yards and recycling areas, along with loading bays, waste compactor and gated access points, and 2 no. ESB substations, (each with an overall GFA of 42.8 sqm) and the provision of 2 no. single storey security guard houses (each with a GFA of 29.8sqm); E) Access to the unit will be provided via a revised entrance onto the R415 and the provision of 622 no. car parking spaces, parking for 80 trucks/trailers, and 622 no. bicycle spaces; F) The development includes landscaping, boundary treatments, photovoltaic panels at roof level, entrance barriers, site lighting, and all associated site development works, including underground foul and storm water drainage services and attenuation areas, internal drainage diversions, culverts and all ancillary works; G) The development also consists of the reprofiling of the subject site to include an increase of ground levels at the site by up to circa 3m. The increase in ground levels will be facilitated through the importation of approximately 250,000m3 of infill material. For the avoidance of doubt, the imported infill material requi

Lands at Nurney Road (R415) , Greyabbey (townland) Kildare , Co. Kildare

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?