Proposed Development
for an extension to the north-west of the existing sand and gravel pit with an extraction footprint of c. 2.25 hectares to facilitate the extraction and processing of sand and gravel. The development will also incorporate all ancillary site development including stockpiling, landscaping and boundary treatment works and restoration of the extraction area. The development is proposed to run concurrently with the permitted development established under Kildare County Council Reg. Ref. 17/1224; An Bord Pleanála Ref. ABP-302199-18
View the full application file on the council's planning portal →Application Details
- Location
- Corbally , Kilcullen , Co. Kildare
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 2.25 ha
Timeline
- Registration Date
- 29 May 2025
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for an extension to the north-west of the existing sand and gravel pit with an extraction footprint of c. 2.25 hectares to facilitate the extraction and processing of sand and gravel. The development will also incorporate all ancillary site development including stockpiling, landscaping and boundary treatment works and restoration of the extraction area. The development is proposed to run concurrently with the permitted development established under Kildare County Council Reg. Ref. 17/1224; An Bord Pleanála Ref. ABP-302199-18
Corbally , Kilcullen , Kildare
a 4-bedroom, 2-storey split-level dwelling (c. 207 sqm), a single storey domestic garage, wastewater treatment system, associated percolation area, alterations to existing vehicle entrance to provide a shared entrance along with all associated site development and facilitating works on family-owned land
Corbally Cross , Newbridge , Co. Kildare
for new external door opening at ground floor level in existing gable wall to front of existing dormer dwelling
Goose Acre Cottage , Corbally , Newbridge
for amendments to dormer style bungalow to include basement on foot of planning permission ref no. 01/76
Corbally , Newbridge , Co. Kildare
for the demolition of existing single storey shed on site to facilitate the construction of a single storey side and rear extension to existing single storey cottage to link existing single-storey stables, which are to be extended and converted to habitable use, installation of new secondary effluent treatment system to replace existing septic tank and all associated site works
Beechwood Cottage , Oldtown , Newbridge
alteration and removal of condition 2 of planning grant 90/963
Beechwood Farm , Oldtown , Newbridge
alter Condition No.2 attached to planning application Ref:90/963 and to convert the existing Beechwood Farm Cottage and associated stables into a self-contained dwelling independent of the main dwelling house (Beechwood Farm); the upgrading of an existing vehicular entrance to a shared entrance (including associated works to achieve sightlines, gates, piers and railings); and the provision of all other associated site excavation, infrastructural and site development works above and below ground including an Aswaflow SBR Wastewater Treatment System and soil polishing filter
Beechwood Farm , Oldtown , Newbridge
constructing a single storey detached garage and all ancillary site works
Corbally , Newbridge , Co. Kildare.
of the existing vehicular entrance in addition to seeking planning permission for a single storey, low pitched roof side extension (floor area of side extension 58m²) onto the existing two storey house (existing floor area 224m²), and alterations to the existing ground floor plan
Corbally , Newbridge , Co. Kildare.
the continuance of the following development previously permitted under Kildare County Council (KCC) Reg. Ref. 07/707; ABP Ref. PL09.226792 and KCC Reg. Ref. 14/920. (1) Extraction of sand and gravel and processing on c.85.9 hectares for a 20 year period, with control cabin and canteen facilities, electricity substation, bunded fuel tanks, Electricity Supply Board substation and switch-house and septic tank, aggregate crushing, washing and screening plants and the continued use of the internal access road and existing site access onto the R448 with a further two years to complete site restoration to agriculture. The development proposes progressive restoration throughout the life of sand and gravel extraction. (2) Dry Batch Mortar Plant comprising structures and pieces of plant and machinery:- loading ramp and receiving hopper; a feed conveyor; a drying plant building (c8.6 metres high); external bucket elevators (up to c24.8 metres high); a storage and mixing plant building (c23.5 metres high) (housing plant and machinery); two number finished product storage silos with bulk loadout machinery (c20.5 metres high); prefabricated office; prefabricated compressor container; prefabricated control and switchgear container; a bunded and covered fuel tank; truck and car parking areas. (3) Storage at the existing Overburden Storage Mound (area of c3.4 hectares) which is covered with topsoil and is grass seeded and wil ultimately be used in the restoration of the aforementioned sand and gravel development site. (4) Dry Mortar Bagging Plan and Storage Hall Structure (c7 metres high). (5) Existing weighbridge and wheelwash within the development site. (6) Covered aggregate storage bays, a sand storage shed and a bagging shed. Permission is also sought for the provision of new works including an office building (and two proprietary sewage effluent treatment systems), dry batch mortar plant extension (including plant and machinery), tile manufacturing plant; associated switch-house; car parking; provision of two weighbridges; covered storage sheds; rerouting of internal access road to plant site; the demolition of a storage shed and weighbridge; extraction of sand and gravel to the south-west of previously permitted extraction area and extension to existing overburden storage mound; landscaped screening berms and overburden storage mounds along perimeter of the site. All development will be within the c85.9 hectare Kilsaran Concrete landholding for a period of 20 years
Brownstown Corbally and , Silliothill , Co. Kildare
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.