← Back to search

Tannalo , Daars South , Sallins

N/A

Planning application 2560854

Kildare - Kildare County Council

Proposed Development

for a single storey extension and revised window sizes and locations to all four elevations to the existing dwelling, increase in size with alterations to elevations of existing garage, store and guest house and retention of upgraded wastewater treatment system and all ancillary works

View the full application file on the council's planning portal →

Application Details

Location
Tannalo , Daars South , Sallins
Applicant
N/A
Application Type
RETENTION
Planning Authority
Kildare County Council
Site Area
0.626 ha

Timeline

Registration Date
28 July 2025
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

9m
2560994CONDITIONAL31 Aug 2025

for a single storey extension and revised window sizes and locations to all four elevations to the existing dwelling, increase in size with alterations to elevations of existing garage, store and shed and retention of upgraded wastewater treatment system and all ancillary works

'Tannalo' Daars , Sallins , Co. Kildare

137m
2360253CONDITIONAL28 Sept 2023

for construction of a detached two storey house with single storey element, single storey domestic garage, utilisation of existing permitted family recessed entrance, secondary effluent treatment system and all associated site works

Daars South , Sallins , Co. Kildare

143m
2360238N/A22 Sept 2023

for construction of a detached two storey house with single storey element, single storey domestic garage, utilisation of existing permitted family recessed entrance, secondary effluent treatment system and all associated site works

Daars South , Sallins , Co. Kildare

144m
181154REFUSED20 Sept 2018

the construction of a two storey dwelling house, stables and garage building, equine training area, waste water treatment system and all associated site works (on lands sterilised under planning reference 95/745)

Daars South , Sallins , Co. Kildare

157m
2360250N/A27 Sept 2023

for construction of a detached two storey house with single storey element, single storey domestic garage, utilisation of existing permitted family recessed entrance, secondary effluent treatment system and all associated site works

Daars South , Sallins , Co. Kildare

162m
211569CONDITIONAL3 Nov 2021

for a front, side & rear single storey extension to an existing single storey detached dwelling, ancillary alterations to all dwelling elevations, on site effluent treatment system and percolation area to replace existing septic tank, surface water to soakaways, alterations to existing side & rear site boundaries and all associated site works

Daars North , Sallins , Co. Kildare.

170m
181102N/A10 Sept 2018

The development will consist of the construction of a two storey dwelling house, outbuilding, waste water treatment system and all associated site works

Daars South , Sallins , Co. Kildare

182m
171221CONDITIONAL2 Nov 2017

the construction of a 2 storey, 4-bedroom detached dwelling (c.253m2), installation of a proprietary waste water treatment system to E.P.A. standards, new vehicular access from Sherlockstown Road, removal of existing agricultural access and all associated site works and boundary treatments on site of circa 0.39ha

Daars South , Sallins , Co. Kildare

244m
23199CONDITIONAL3 Mar 2023

construction of a new part two-storey, part single-storey four bedroom house, including solar panels, 2 no. rooflights, a new domestic garage, a new domestic road entrance, packaged foul drainage treatment system and sand polishing filter, surface water soakaway, landscaping, and all ancillary works

Daars North , Sallins , Co. Kildare

256m
19478REFUSED1 May 2019

construction of a two storey dwelling house, stables and garage building, waste water treatment system and all associated site works

Daars South , Sallins , Co. Kildare.

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?