← Back to search

Co. Kildare , , Refer to Particulars attached

CONDITIONAL

Planning application 2561155

Kildare - Kildare County Council

Proposed Development

works to uprate the existing Rinawade – Dunfirth Tee – Kinnegad 110kV overhead line (OHL). Within County Kildare, the proposed development will take place within the following townlands: Confey, Parsonstown, Barnhall, Easton, Rinawade Upper, Rinawade Lower, Castletown, Oldcarton, Nicholastown, Killickaweeny, Cappagh, Newtown, Ballynakill, Ballyvoneen, Dysart, Dunfierth, Coolree, Kilmurry, Thomastown, Kilshanchoe, Clonagh, Cadamstown, Tanderagee, Calfstown, Ballinderry, Balrinnet, Kilglass, Nurney, Williamstown, Ballindoolin, Carrick, Grange East, Rahin. The Rinawade - Dunfirth Tee - Kinnegad 110 kV OHL circuit runs through County Meath, County Kildare and County Offaly. It is 54 km in length and travels from Kinnegad 110 kV substation in Killaskillen (County Meath) and traverses southeast where a short loop into Dunfirth 110 kV substation in Dunfirth (County Kildare) exists. The line then continues southeast where it terminates at Rinawade 110kV substation in Rinawade Lower (County Kildare). The OHL has a total of 249no. supporting structures. Within the functional area of Kildare County Council, there is 30.66 km of the existing OHL circuit, with 140 no. structures. Within the functional area of Meath County Council there is 23.16 km, with 107 no. structures, and within the functional area of Offaly County Council there is 0.42 km, with 2 no. structures. Separate planning applications will be lodged with Meath County Council and Offaly County Council. The proposed development within Co. Kildare will comprise: the replacement (“restringing”) of the existing OHL circuit conductor wires with a new higher capacity conductor between structure numbers 93 - 153, 224 - 226, and 240 - 247; the strengthening of tower foundations at 9no. locations; the strengthening of towers (i.e., member replacement) at 14no. locations; the painting of towers at 15no. locations; shear block remedial works of towers at 1no. location; the replacement of polesets at 43no. locations, with similar structures. There will be no change in height at 6no. poleset replacements. There will be height increases between 0.1m and 2.0m at 33no. poleset replacements. Poleset numbers 67, 72 and 132 will increase in height no greater than 3.0m, and poleset number 151 will increase in height no greater than 4.0m; the replumbing of polesets at 14no. locations; the replacement of insulating and ancillary hardware at all structures where conductor wires will be replaced; the replacement of stay wire/a

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    13 Oct 2025

  2. Further information requested

    3 Dec 2025

  3. Further information received

    14 Apr 2026

  4. Decision: CONDITIONAL

    8 May 2026

  5. Decision due

    11 May 2026

  6. Grant issued

    15 Jun 2026

Application Details

Location
Co. Kildare , , Refer to Particulars attached
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
146.6 ha

Timeline

Registration Date
13 October 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
8 May 2026
Grant Date
15 June 2026
Permission Expires
14 June 2031

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

431m
2560844N/A25 Jul 2025

for the construction of a two storey dwelling and a waste water treatment system and a vehicular entrance and all associated site works

Nurney , Carbury , Co. Kildare

435m
2560693N/A23 Jun 2025

for a two storey dwelling and a waste water treatment system and a vehicular entrance and all associated site works

Nurney , Carbury , Co. Kildare

436m
2560923REFUSED12 Aug 2025

for construction of a two storey dwelling and a waste water treatment system and a vehicular entrance and all associated site works

Nurney , Carbury , Co. Kildare

579m
191062CONDITIONAL25 Sept 2019

retention and completion of works having a floor area of 41sqm within an existing agricultural building to a Farm TV/Video Production Studio with connection into the existing septic tank and all associated site works

Nurney , Carbury , Co. Kildare.

708m
17277CONDITIONAL14 Mar 2017

the construction of a private residence and garage together with connection to a proprietary wastewater treatment system including all ancillary site works as revised by significant further information containing a revised position and design of the dwelling, revised site layout, revised entrance arrangements and revised treatments system

Nurney , Carbury , Co. Kildare

716m
17205N/A28 Feb 2017

construction of a private residence and garage, together with connection to existing services and including all ancillary site works

Nurney , Carbury , Co. Kildare

915m
1764CONDITIONAL25 Jan 2017

(a) Tarmacadam walking/running track around the existing playing pitch; (b) The erection of 6 No. 18 metres high floodlighting columns for the existing playing pitch and the proposed walking/running track

Balrinnet , Carbury , Co. Kildare.

985m
20589CONDITIONAL10 Jun 2020

for weighbridge, weighbridge office, wheel wash and portaloo

Balrinnet and Kilglass , Carbury , Co. Kildare.

1.0km
2560812CONDITIONAL17 Jul 2025

for the refurbishment of the existing derelict building into a habitable, three-bedroom, detached bungalow, to include the demolition of the existing extension at the rear, a new pitched roof, proposed revisions to window & door openings on all four elevations, proposed internal modifications, the provision of a new wastewater treatment unit, a well for the provision of potable water, a proposed detached garage, entrance, landscaping, boundary treatments & all ancillary site works

Fearavolla , Carbury , Co. Kildare

1.1km
2345N/A20 Jan 2023

for the development consisting of the restoration of an area of a disused Sand and Gravel Pit, back to agriculture use. The proposed site covers approx 6.4 hectares and approx 116,000 cubic metres (185,600 tonnes) of uncontaminated soil and stone is to be imported under a waste facility permit over a period of 8 to 10 years. A maximum of 5 loads per day will be delivered to the facility Monday to Friday, no waste will be accepted at the weekend or on bank holidays. The maximum annual tonnage to be accepted will be 20,000 tonnes so an EIAR is not required.

Kilglass , Balrinnet , Carbury

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?