Lily O'Briens Chocolates , Newbridge Business Park , Crotanstown
N/APlanning application 2562
Kildare - Kildare County Council
Proposed Development
for roof mounted solar panels consisting of up to c.727kWp 9c.1490m2) and ground mounted solar panels consisting of up to c.180kWp (c.963m2) and all associated site works
View the full application file on the council's planning portal →Application Details
- Location
- Lily O'Briens Chocolates , Newbridge Business Park , Crotanstown
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
Timeline
- Registration Date
- 24 March 2025
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for roof mounted solar panels consisting of up to c.727kWp (c.1490m2) and ground mounted solar panels consisting of up to c.180kWp (c.963m2) and all associated site works
Lily O'Briens Chocolates , Newbridge Business Park , Crotanstown
1no. single storey lean-to extension to the north-east of the existing factory building providing a Production Expansion Line; a single storey extension to the south west of the existing factory building providing a Raw Materials Store and Chocolate Tank Room with internal alterations providing a second Chocolate Tank Room; internal alterations providing a Packing Managers Office in the Packing Area; internal alterations to the existing Boiler House; 1no. single storey Pallet Store to the south west of the site; the reorientation of the existing Blast Freezer unit; 1no. HGV incline ramp situated adjacent to the existing descending ramp; an overflow carpark located to the north east of the applicant site, together with all associated siteworks
Lily O'Brien's Chocolates , IDA Business Park , Green Road
the construction of 7 no. 2-storey semi-detached / terrace dwellings in total consisting of 2 no. three bed dwellings & 5 no. two bedroom dwellings, new site entrance, connection to existing services and all ancillary site works
Moorfield Link Road between the Green Road & Athgarvan Road , Newbridge , Co. Kildare
the construction of 9 No. 2-storey terrace dwellings in total, consisting of 5 No. three bed dwellings and 4 No. two bedroom dwellings, new site entrance, connection to existing services and all ancillary site works
Moorfield , Link Road between Green Road and Athgarvan Road , Newbridge
for a canopy to the front elevation over loading-bay, and full planning permission for an extension to front of existing building and all associated ancillary siteworks
Newbridge Industrial Estate , Green Road , Newbridge
The development will consist of the following: the installation of Solar PV Panels to be mounted on the rooftop of an existing warehouse building and all associated ancillary infrastructure
Newbridge Industrial Estate Green Road , Newbridge , Co. Kildare.
Residential development consisting of 19 No. units in 2 No. blocks: (1) Block A: 3 storey apartment block consisting of 16 No. units, 8 No. 2 bedroom apartments at ground floor level and 8 No. 3 bedroom duplex units at first and second floor level. (2) Block B: 2 storey terrace block consisting of 3 No. 3 bedroom houses. (3) Bicycle store, bin storage, access road, car parking, landscaped gardens, pedestrian access onto Green Road, outfall drains and all associated site development works,
Beechmount , Green Road , Newbridge
Residential development consisting of 19 No. units in 3 No. blocks. (a) 2 No. 3 storey blocks accommodating 8 No. 2 bed ground floor apartments , with 8 No. 3 bed duplex units at 1st and 2nd floors (16 units total). (b) 3 No. 3 bedroom, 2 storey terrace houses. (c) Bicycle store and bin storage, access road, car parking, landscaped gardens, outfall drains and all associated site development works
Beechmount , Green Road , Newbridge
for an optional room at attic level to the 10 no. two storey, 3 bedroom dwellings permitted under Reg. Ref. 12/1015 as extended under Reg. Ref. 18/411. Permission is sought for an optional attic level to the permitted 10 no. dwellings (house types A,B,C and D) to accommodate the optional attic room with associated internal revisions to the staircase from first floor level to access same and revisions to permitted elevations to include rooflights to rear and front elevations and 1 no. new window to gable elevation at attic level of the permitted dwellings (House types A,B,C and D) to now provide for 10 no. two storey 3 bedroom dwellings with optional room at attic level. Permission is also sought for all ancillary site works necessary to facilitate the development
The Laurels , Green Road , Newbridge
of single storey staff shop adjacent to the existing manufacturing plant
IDA Industrial Estate , Green Road , Newbridge
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?