← Back to search

Penuel Cottage St. Jude's , Tipper Road Naas , Co. Kildare

N/A

Planning application 2660023

Kildare - Kildare County Council

Proposed Development

- reduce in height to single storey and change to pitched roof - reduce footprint - change fenestration and materials.

View the full application file on the council's planning portal →

Application Details

Location
Penuel Cottage St. Jude's , Tipper Road Naas , Co. Kildare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
0.02 ha

Timeline

Registration Date
13 January 2026Other applications received that week
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

8m
22192CONDITIONAL24 Feb 2022

sought for demolition of part existing outhouses and existing single storey extensions, and construction of new part-single part-2-storey (loft) extension, widened vehicle access gate, new boundary fence to road, new wastewater treatment and percolation area, replacement roof covering to existing cottage, and all associated site works

Penuel Cottage St. Jude's , Tipper Road , Naas

218m
211119CONDITIONAL4 Aug 2021

(a) Erection of a single storey type house; (b) Garage/fuel store for domestic use; (c) Installation of an Oakstown BAF wastewater treatment plant with polishing filter percolation area and (d) New vehicular recessed entrance and access driveway and all associated site works

Tipper West , Naas , Co. Kildare.

857m
19820CONDITIONAL19 Jul 2019

a single storey temporary standalone pre-fabricated Training Facility (floor area = 44.7sqm) to the side of existing Training Centre together with all associated site works

Naas Local Services , Blessington Road , Naas East

900m
201137CONDITIONAL1 Oct 2020

retention of the sunroom with porch entrance located to the front of the existing house,

38 Woodlands , Naas , Co. Kildare

939m
17720CONDITIONAL20 Jun 2017

the construction of a single storey extension to the rear and Northern side of the existing house.

24 Kings Court , Naas , Co. Kildare.

944m
18677CONDITIONAL6 Jun 2018

the single storey extension to the rear of the house, the converted garage to the side, and all ancillary site works

79 Woodlands , Naas , Co. Kildare.

952m
18106CONDITIONAL2 Feb 2018

the construction of a single storey extension to side of existing single storey detached dwelling, 2 No. “Velux” type roof windows to existing rear roof surface, together with all associated site works

23 The Gallops , Naas , Co. Kildare.

1.0km
19741CONDITIONAL28 Jun 2019

1) part-demolition (only) of the existing single storey, single family dwelling. 2) proposed extension, to said dwelling to facilitate the construction therefrom of 3) two, detached, two storey (dormer-style) single family dwellings with 4) all associated site works, landscaping and boundary walls. The existing vehicular entrance unto the Tipper Road is to be used to allow access to two independent entrances, located within the site, into each new individual single family dwelling and site. (The existing single-storey studio building on the overall site is unaffected by the development and will remain within one of the sites). Additional works to include inter alia connections to the existing town foul sewer; soakaways to facilitate surface water disposal as required, parking to each site, landscaping and internal boundary walls along with all other ancillary site works

Lisheen , Tipper Road , Naas

1.0km
17655CONDITIONAL6 Jun 2017

construction of a single storey detached dwelling, single storey garage, entrance, driveway and proprietary waste water treatment system with associated disposal area and associated site works

Tipper North , Naas , Co. Kildare

1.1km
181095CONDITIONAL5 Sept 2018

a single storey extension to the rear of existing house

86 Woodlands , Naas , Co. Kildare.

The submission window has closed

Observations on this application closed on Monday 16 February 2026, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?