Orchard Lodge , Lumville , Curragh
CONDITIONALPlanning application 2660194
Kildare - Kildare County Council
Proposed Development
for
- (a)collapsed walls and re-construction of same walls to southwest and northeast elevations to existing dwelling granted under Planning Ref. 2360425
- (b)addition of window to southwest elevation to dwelling granted under Planning Ref. 20360425
- (c)realigned vehicular entrance layout granted under Planning Ref. 20360425
- (d)alterations to domestic garage granted under Planning Ref. 20360425 including changes to the roof profile and front elevation along with all associated site development and facilitating works. Revised by Significant Further Information which consists of retention of the following:
- 1)Raising of roof height by 0.154 metres
- 2)altering the dimensions of 3nr box dormers
- 3)removal of chimney detail to front elevation from that granted under Planning Ref. 23/60425
- 1)
Application Timeline
Application received
25 Feb 2026
Further information requested
17 Apr 2026
Further information received
27 Aug 2026
Decision: CONDITIONAL
1 Oct 2026
Decision due
4 Oct 2026
Grant issued
6 Nov 2026
Application Details
- Location
- Orchard Lodge , Lumville , Curragh
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Kildare County Council
- Site Area
- 0.22 ha
Timeline
- Registration Date
- 25 February 2026Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 1 October 2026
- Grant Date
- 6 November 2026
- Permission Expires
- 5 November 2031
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for (a) single storey extensions to the side and rear of the existing dwelling; (b) a new porch & pitched roof section on the front elevation; (c) the change of use of an existing garage to use as a bedroom for assisted living; (d) alternations to elevations including alterations to dormer windows; (e) all associated site and landscaping works to serve the development
Tudor Lodge , Green Road , Newbridge
(a) removal of existing pitch roof over the single storey garage projection, (b) two storey extension to front (south east) elevation, side (north east) elevation and rear (north west) elevation over the existing single storey garage, (c) alterations to existing front (south east) elevation consisting of removal of existing porch roof and replaced with sheet metal flat roof, and new gable roof over existing bay window and to plaster over the existing brick façade with a render finish, (d) single storey extension to rear (north west) elevation, (e) alteration to existing window fenestration on all elevations and minor internal alterations within the existing house
Beech House , Green Road , Newbridge
Retention permission for (a) detached domestic garage and (b) detached garden studio to rear of existing house.
Beech Lodge , Green Road , Newbridge
the change of use of existing single storey shed building to a parent and child tea room ancillary to the permitted pre-school and after-school facility, permission for the construction of a single storey rear extension to be used as 2 No. classrooms, accessible toilets and all associated site works
Gate Lodge B , Green Road , Newbridge
the change of use of existing detached one and half story house known locally as "Gate Lodge B" from residential use to use as a preschool and afterschool facility. Permission to replace a window with a door on the north-west elevation, permission to install a fire exit door (which replaces a window which had historically been a door) on the south elevation, car parking and all associated site works
Gate Lodge B , Green Road , Newbridge
to retain porch to front, conversion of extra living space from garage and stables to family assisted accommodation, games room, relaxation area, windows to front, side and rear and doors to rear and all associated site works
Bridgefort , Green Road , Curragh
a domestic extension to dwelling and all ancillary works
Lumville , The Curragh , Co. Kildare.
the construction of a first-floor extension to the rear of the existing dwelling
32 Greenmount Park , Newbridge , Co. Kildare.
The demolition of the original single storey school building (apart from the single storey extension constructed under planning permission reference 10/1131), the two existing prefabricated units located to the side and rear of the existing school and all associated siteworks, the construction of a new permanent Special Educational Needs (SEN) School consisting of a new single storey Junior School building and associated works to the front/upper level of the site, a new two story and part three storey (water tank room only in three storey block) Senior School building and associated works to the rear/lower level of the site, the provision of solar photovoltaic panels (PV) on the roofs of the new buildings together with the provision of all associated and ancillary siteworks, boundary treatments and landscaping works required as part of the redevelopment of the school. The new school accommodation will consist of 11 No. new classrooms for Special Educational Needs students along with associated support accommodation, to include a G.P. Room, Staff Facilities, specialist rooms, a two storey link corridor block between the Junior and Senior Schools, ancillary accommodation together with outdoor hard and soft play areas, new canopies to play areas, a replacement canopy to the existing bus set down area, and all-weather pitch, sensory garden and polytunnel, additional staff parking areas, an additional site exist onto the R413 public road to the south east corner of the site (Kilcullen side of existing entrance) to facilitate an in-out traffic flow, new boundary treatments and all associated siteworks and the provision of a single storey temporary prefabricated Administration Office for the duration of the works. The single storey prefabricated accommodation constructed to the front of the site under planning reference 19/192 will be removed on completion of the permanent school accommodation for which permission is being sought as part of this planning application. Permission is also sought for a temporary site entrance (for construction traffic) onto the R413 public road to the north west corner of the site (M7 side of existing entrance) for the duration of the works
Ballymany Cross , The Curragh , Co. Kildre.
This is a resubmission of planning application reference 21/419 which was deemed withdrawn. The development will consist of the demolition of the original single storey school building (apart from the single storey extension constructed under planning permission reference 10/1131), the demolition of the two existing prefabricated units located to the side and rear of the existing school and all associated siteworks, the construction of a new permanent Special Educational Needs (SEN) School consisting of a new single storey Junior School building and associated works and siteworks to the front/upper level of the site, a new two storey and part three storey (Water Tank Room only in three storey block) Senior School building and associated works and siteworks to the rear/lower level of the site, the provision of solar photovoltaic panels (PV) on the roofs of the new buildings together with the provision of all associated and ancillary siteworks, acoustic fencing and screens, boundary treatments and landscaping works required as part of the redevelopment of the school. The new school accommodation will consist of 11 No. new classrooms for Special Educational Needs students along with associated support accommodation, to include a G.P. Room, Staff Facilities, specialist rooms, a two storey link corridor block between the Junior and Senior Schools, ancillary accommodation together with outdoor hard and soft play areas, new canopies to play areas, a replacement canopy to the existing bus set down area, and all-weather pitch, sensory garden and polytunnel, additional staff parking areas, an additional site exit onto the R413 public road to the south east corner of the site (Kilcullen side of existing entrance) to facilitate an in-out traffic flow, new boundary treatments and all associated siteworks and the provision of a single storey temporary prefabricated Administration Office for the duration of the works. The single storey prefabricated accommodation constructed to the front of the site under planning reference 19/192 will be removed on completion of the permanent school accommodation for which permission is being sought as part of this planning application. Permission is also sought for a temporary site entrance (for construction traffic) onto the R413 public road to the north west corner of the site (M7 side of existing entrance) for the duration of the works