← Back to search

Community Complex , Newbridge Road , Kilcullen

N/A

Planning application 2660233

Kildare - Kildare County Council

Proposed Development

A) Change of use of Existing First Floor Storage Area to Proposed Community Dance Studio including new fenestration to side (western) & rear (southern) elevations at first floor level with new entrance door to front (Northern) Elevation at Ground Floor Level, B) Change of use to section of existing ground floor storage area to proposed Sensory Gym, C) Proposed Single Storey Extension with Balcony & Railing Over to Rear of Existing Unit, D) Proposed Two Storey Enclosed Escape Stairwell to Rear of Existing Unit , E) Demolition of Existing Rear Boiler House & Relocation of Same to Side of Existing Unit along with all site development & facilitating works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    4 Mar 2026

  2. Further information requested

    27 Apr 2026

Application Details

Location
Community Complex , Newbridge Road , Kilcullen
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kildare County Council
Site Area
0.03 ha

Timeline

Registration Date
4 March 2026
Status
FURTHER INFORMATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

73m
211342CONDITIONAL20 Sept 2021

for Change of Use from Staff Canteen to a Barista Kitchen, together with 1 No retractable awning to external side of building, 1nr French canopy awning to external side of building, retail hatch and external seating along with all associated site development and facilitating works at

Community Complex , Newbridge Road , Kilcullen

137m
211341CONDITIONAL20 Sept 2021

for the following as built amendments to previously approved planning ref: 07/2658, a) revised first floor layout, b) revised layout to 3nr ground floor rooms, c) Alterations to site boundaries to include astro & grass play areas along with all associated site development and facilitating works at

Community Complex , Newbridge Road , Kilcullen

143m
2660162CONDITIONAL19 Feb 2026

A) Storey-and-a-half extension to rear of existing creche building consisting of two no. proposed classrooms & ancillary rooms B) lean-to external overhang to proposed covered patio to rear of existing creche building, C) Conversion of existing external overhang area to front of existing creche building to proposed sensory room with proposed external access door provided to same along with all site development & facilitating works

Community Complex , Newbridge Road , Kilcullen

205m
181537CONDITIONAL18 Dec 2018

the construction of a new temporary single storey prefabricated building, located to the south of the existing main single storey school building, containing a Technology Room and Technology Preparation Room, a Science Laboratory and Preparation Room, an entrance lobby, toilet accommodation and all associated accommodation, new single storey canopies to new walkways between the existing school buildings and the new prefabricated building together with all associated site works. The works will also involve the provision of 4 no. additional car parking spaces adjacent to the existing school staff car park and the opening up of a temporary construction site entrance, for the duration of the construction works, on the R448 Athy / Carlow Public Road (opposite the existing Health Centre) together with all other ancillary and associated siteworks

Cross & Passion College , Kilcullen , Co. Kildare

210m
17544CONDITIONAL12 May 2017

construction of a new temporary single storey, prefabricated building located to the south of the existing main single storey school building, containing a Special Education Unit (SEN) consisting of 1 No. SEN classroom with 1 No. One to One room, 1 No. storeroom and 1 No. accessible wc/shower room together with 2 No. general classrooms, 1 No. art room, entrance lobbies, toilet accommodation and 2 No. canopies to walkways between the existing school and the new prefabricated building. The works will also involve the provision of 8 No. additional car parking spaces adjacent to the existing staff car park as well as a temporary construction entrance for the duration of the construction works located on the R448 Athy/Carlow Road (opposite the Health Centre) together with all other ancillary and associated siteworks

Cross & Passion College , Kilcullen , Co. Kildare.

222m
22993CONDITIONAL12 Aug 2022

(1) The phased demolition of existing school buildings, with the exception of the existing Cross and Passion former convent building (1,333m²) and nearby stone building (76m²), which are to be retained and refurbished; (2) To allow the school to remain operational during the construction period, the erection on site of new temporary school accommodation units (1,517m² ) along with the retention of the existing temporary school accommodation units and, on completion of construction works, the decommissioning and removal of all temporary school classrooms; (3) The phased construction of a new 2- and 3-storey school building with a total gross internal floor area of 10,005.7m² (the total new school floor area incorporating refurbished elements is 11,414.7m²) incorporating 37 No. general classrooms, a series of support and specialist classrooms, a special needs unit, a library, multi media rooms, a single storey multi-use sports hall, staff rooms and all ancillary accommodation including photovoltaic panels at roof level, externally accessible storage shed (33.5m²) and plant (42.5m²) within the retained and refurbished stone building, and separate bin enclosure (25m²); (4) The new school grounds will comprise the existing grassed sports pitch, which is to be retained, and the construction of 6 No. multi-use hard ball courts, outdoor seating and breakout areas, a sensory garden, a construction studies yard, and associated hard and soft landscaping including the retention of the majority of existing trees on site including the existing woodland area along the R413, which is to have the addition of a woodland trail and seating area; (5) The retention of existing vehicular and pedestrian access arrangements from the R413 and the R448/Main Street, the provision of new pedestrian access arrangements through the site between Main Street and the community centre/sports grounds to the south of the school, the modification of the internal roadway and the provision of 92 No. car parking spaces (including 5 No. disabled parking spaces and 2 No. EV charge point spaces) and 177 No. bicycle parking stands providing 354 No. parking spaces; (6) The proposal also includes new foul and surface water drainage system works incorporating pump station, soakaways, SUDs measures, rainwater harvesting, a new substation (28m²), Liquid Petroleum Gas (LPG) and Air Source Heat Pump (ASHP) compounds and all other associated site and development works

Cross and Passion College , Main Street , Kilcullen

273m
19839N/A26 Jul 2019

a new vehicular entrance to serve existing development and Retention Permission for development as constructed and all associated site works

Former Health Care Centre , Nicholastown , Kilcullen

282m
211570CONDITIONAL3 Nov 2021

for a front, side& rear single storey extension to an existing two storey semi detached house, ancillary alterations to all elevations, Foul water to existing foul sewer, surface water to soakaways and all associated site works

1026 Nicholstown , Kilcullen , Co. Kildare.

286m
19901CONDITIONAL8 Aug 2019

Permission for a new vehicular entrance to serve existing development and retention permission for development as constructed for use as a community building and all associated site works

Former Health Care Centre , Nicholastown , Kilcullen

290m
19807N/A17 Jul 2019

Permission for a new vehicular entrance to serve existing development and retention permission for development as constructed and all associated site works

Former Health Care Centre , Nicholastown , Kilcullen

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.