Crosschapel , Blessington , Co Kildare
N/APlanning application 2660583
Kildare - Kildare County Council
Proposed Development
for
- 1)New all-weather football pitch 65m x 40m including perimeter fencing and 12m floodlighting.
- 2)Floodlighting to Pitch 1.
- 3)Ball stop netting to Pitch 1 & Pitch 2.
- 4)Spectator Fencing to Pitch 3 with surrounding walkway and walkway lighting to new and existing walkway.
- 5)Bicycle Shelter, Solar Panels & Polytunnel.
- 6)Removal of existing boundary fence and re-installation along new boundary line & importation of subsoil to create further level playing surface.
- 7)New sewage treatment unit & percolation area. & Retention permission for 1) Concrete plinth with low level walls, prefabricated units/changing rooms/toilet block, containers for storage, coffee shop container, existing well & water tank. 2) Spectator fencing to pitch 1 & 2, dug outs, and surrounding walkway 3) Block walls to entrance including gate, tarmac entrance road and stoned up car park areas. 4) Lighting to Pitch 3 for training
Application Details
- Location
- Crosschapel , Blessington , Co Kildare
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 4.59 ha
Timeline
- Registration Date
- 3 June 2026
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
1) New all-weather football pitch 65m x 40m including perimeter fencing and 12m floodlighting. 2) Floodlighting to Pitch 1. 3) Ball stop netting to Pitch 1 & Pitch 2. 4) Spectator Fencing to Pitch 3 with surrounding walkway and walkway lighting to new and existing walkway. 5) Bicycle Shelter, Solar Panels & Polytunnel. 6) Removal of existing boundary fence and re-installation along new boundary line & importation of subsoil to create further level playing surface. 7) New sewage treatment unit & percolation area. & Retention permission for 1) Concrete plinth with low level walls, prefabricated units/changing rooms/toilet block, containers for storage, coffee shop container, existing well & water tank. 2) Spectator fencing to pitch 1 & 2, dug outs, and surrounding walkway 3) Block walls to entrance including gate, tarmac entrance road and stoned up car park areas. 4) Lighting to Pitch 3 for training
Crosschapel , Blessington , Co Wicklow
• extension of the existing sand and gravel pit, in two separate but contiguous working areas on the eastern side of the Doran’s Pit Complex; • installation of new site infrastructure to facilitate the proposed pit development, principally a weighbridge and associated site / weighbridge office, a wheelwash, additional settlement lagoons, electrical charging infrastructure, staff welfare facilities and equipment / sample storage facilities; • stripping of overburden soils for immediate use in construction of environmental / perimeter safety bunds and stockpiling of any excess topsoil and overburden soil cover pending its re-use as cover material in future pit restoration works; • extraction of in-situ sand and gravel to within 2m of the in-situ groundwater table using battery powered (i.e. non-fossil fuel powered) mechanical excavators; • temporary removal and subsequent reinstatement of the existing internal haul road running north-south inside the eastern property boundary. The reinstated road will be lowered to run over the working floor of the Upper Pit and will rise northwards on an earth embankment (ramp) to the existing site access along Darker’s Lane; • transfer of excavated sand and gravel to the existing processing (washing and screening) plant to the west of the excavation area using battery powered dump trucks; • continued processing of excavated sand and gravel at the existing (mains-powered) processing plant to the west of the excavation area; • use of the adjoining (existing) pond and additional (new) ponds to settle out the separated fine particulate (silt) materials; • continued stockpiling of unprocessed sand and gravel and/or processed aggregates around the washing and screening plant, as required; • dispatch of processed aggregates off-site via the existing site access road and its junction with the N81 National Secondary Road at Santryhill (and any future replacement link road to the Blessington Inner Relief Road constructed over the life of the proposed development); • upgrading of the internal haul roads across Roadstone lands as required to support the proposed pit development, to include re-surfacing of the section between the proposed wheelwash facility and the existing N81 junction where necessary; • implementation of scheme to progressively restore excavated pit areas (in phases) to agricultural grassland in tandem with extraction activities
Dillonsdown Deerpark Newpaddocks and Santryhill Townlands , Blessington , Co. Wicklow
• extension of the existing sand and gravel pit, in two separate but contiguous working areas on the eastern side of the Doran’s Pit Complex; • installation of new site infrastructure to facilitate the proposed pit development, principally a weighbridge and associated site / weighbridge office, a wheelwash, additional settlement lagoons, electrical charging infrastructure, staff welfare facilities and equipment / sample storage facilities; • stripping of overburden soils for immediate use in construction of environmental / perimeter safety bunds and stockpiling of any excess topsoil and overburden soil cover pending its re-use as cover material in future pit restoration works; • extraction of in-situ sand and gravel to within 2m of the in-situ groundwater table using battery powered (i.e. non-fossil fuel powered) mechanical excavators; • temporary removal and subsequent reinstatement of the existing internal haul road running north-south inside the eastern property boundary. The reinstated road will be lowered to run over the working floor of the Upper Pit and will rise northwards on an earth embankment (ramp) to the existing site access along Darker’s Lane; • transfer of excavated sand and gravel to the existing processing (washing and screening) plant to the west of the excavation area using battery powered dump trucks; • continued processing of excavated sand and gravel at the existing (mains-powered) processing plant to the west of the excavation area; • use of the adjoining (existing) pond and additional (new) ponds to settle out the separated fine particulate (silt) materials; • continued stockpiling of unprocessed sand and gravel and/or processed aggregates around the washing and screening plant, as required; • dispatch of processed aggregates off-site via the existing site access road and its junction with the N81 National Secondary Road at Santryhill (and any future replacement link road to the Blessington Inner Relief Road constructed over the life of the proposed development); • upgrading of the internal haul roads across Roadstone lands as required to support the proposed pit development, to include re-surfacing of the section between the proposed wheelwash facility and the existing N81 junction where necessary; • implementation of scheme to progressively restore excavated pit areas (in phases) to agricultural grassland in tandem with extraction activities
Dillonsdown Deerpark Newpaddocks and Santryhill Townlands , Blessington , Co. Wicklow
(a) sunroom to side of existing bungalow and all associated site development works
Crosscool Harbour , Blessington , Co. Kildare
for a single storey dwelling house (c. 230 sqm gross floor area), and provision of a domestic garage (c. 49 sqm), wastewater treatment system, vehicular access via existing agriculture through road (for which I have right of way), landscaping and planting, and all services and ancillary site works necessary to facilitate the proposed development. Revised by Significant further Information which consists of an AA screening report regarding the impact of the proposed wastewater treatment system on the hydrological environment and subsequent potential impact on Red Bog SAC. Relocation of the dwelling to mitigate the impact on the landscape and improve the relationship of the house to the natural contour profile of the land
Redbog , Rathmore , Naas
for a single storey dwelling house (c. 230 sqm gross floor area), and provision of a domestic garage (c. 49 sqm), waste water treatment system, vehicular access at the location of the existing gated entrance to public road and replacement with a new recessed entrance and pillars, landscaping and planting, and all services and ancillary site works necessary to facilitate the proposed development
Redbog , Rathmore , Naas
for a single storey dwelling house (c. 230 sqm gross floor area), and provision of a domestic garage (c. 49 sqm), wastewater treatment system, vehicular access via existing agriculture through road (for which I have right of way), landscaping and planting, and all services and ancillary site works necessary to facilitate the proposed development
Redbog , Rathmore , Naas
for a single storey dwelling house (c. 230 sqm gross floor area), and provision of a domestic garage (c. 49 sqm), waste water treatment system, vehicular access at the location of the existing gated entrance to public road and replacement with a new recessed entrance and pillars, landscaping and planting, and all services and ancillary site works necessary to facilitate the proposed development
Redbog , Rathmore , Naas
for a single storey dwelling house (c. 230 sqm gross floor area), and provision of a domestic garage (c. 49sqm), waste water treatment system, vehicular access at the location of the existing gated entrance to public road and replacement with a new recessed entrance and pillars, landscaping and planting, and all services and ancillary site works necessary to facilitate the proposed development
Redbog , Rathmore , Naas
for a single storey dwelling house (c. 230 sqm gross floor area), and provision of a domestic garage (c. 49 sqm), waste water treatment system, vehicular access at the location of the existing gated entrance to public road and replacement with a new recessed entrance and pillars, landscaping and planting, and all services and ancillary site works necessary to facilitate the proposed development
Redbog , Rathmore , Naas
The submission window has closed
Observations on this application closed on Tuesday 7 July 2026, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?