← Back to search

137 Griffin Rath Hall , Maynooth , Co. Kildare

N/A

Planning application 2660752

Kildare - Kildare County Council

Proposed Development

for attic conversion and window to side elevation

View the full application file on the council's planning portal →

Application Details

Location
137 Griffin Rath Hall , Maynooth , Co. Kildare
Applicant
N/A
Application Type
RETENTION
Planning Authority
Kildare County Council
Site Area
0.018 ha

Timeline

Registration Date
6 July 2026Other applications received that week
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

155m
201181CONDITIONAL9 Oct 2020

demolition of a single storey wall and flat roof and the construction of ground floor extension to rear and first floor extension to front and rear, and all associated ancillary site works

53 Maynooth Park , Maynooth , Co. Kildare W23 D5W4.

169m
2011CONDITIONAL10 Jan 2020

to alter the existing Moneycooly-Kilcock 38kV line at Mullen Park, Straffan Road, Greenfield, Co. Kildare. The proposed alteration will be carried out over the Townland of Moneycooly, Co. Kildare and will involve undergrounding sections of the above mentioned overhead 38kV line to facilitate the development of a previously permitted housing development Ref: 18/761 & 18/762. The proposed alteration will comprise of One (1) lattice steel tower, of maximum height 15 metres. The existing overhead line consists of three overhead steel reinforced aluminum conductors. Four (4) existing wooden pole sets and the associated overhead wires will be removed as part of the alteration

Mullen Park , Straffan Road , Greenfield

177m
18612N/A23 May 2018

Revision to previously approved development under Reg. Ref. 06/1153 and will consist of the omission of portion of lands to the north west and change of house type from that previously approved. This development (Section B) will consist of the construction of 91 No. dwellings, link street (Objective TRO 2(a) Maynooth LAP) and all associated site works. The housing breakdown is as follows: 36 No. House Type B (3bed, 2 storey, 114.5sqm); 4 No. House Type C (3 bed, 2 storey, 117.7sqm); 10 No. House Type F (2 bed, 2 storey, 89.6sqm); 8 No. House Type G (3 bed, 2.5 storey, 132.2sqm) and 33 No. House Type G1 (4 bed, 2.5 storey, 135.9sqm). Total No. of dwellings is 91

Greenfield , Maynooth , Co. Kildare.

247m
18611N/A23 May 2018

Revision to previously approved development under Reg. Ref. 06/1153 and will consist of the omission of portion of lands to the north west and change of house type from that previously approved. This development (Section A) will consist of the construction of 83 No. dwellings, 1 No. two storey crèche 380sqm, link street (Objective TRO 2(a) Maynooth LAP) and all associated site works. The housing breakdown is as follows: 2 No. House Type A (4 bed, 2.5 storey, 151.7sqm); 19 No. House Type B (3 bed, 2 storey, 114.5sqm); 8 No. House Type F (2 bed, 2 storey, 89.6sqm); 7 No. House Type G (3 bed, 2.5 storey, 132.2sqm) and 47 No. House Type G1 (4 bed, 2.5 storey, 135.9sqm). Total No. of dwellings is 83,

Greenfield , Maynooth , Co. Kildare.

301m
17383CONDITIONAL10 Apr 2017

for a new two-storey 16 classroom Primary School building constructed over two phases with a total floor area of 3,200m2; -Phase 1- incorporating;- A) Provision of a 1,820m2 two-storey, 8-classroom Primary School building, including staff and pupil facilities and ancillary spaces; the provision of a 495m2 special education two-classroom, single storey wing, with support rooms; with associated site works and landscaping; retaining the existing car parking and drop off arrangement with an additional 17.No car parking spaces and new ball courts to the rear and new boundary walls and railings to the east and south boundaries;- and upon completion of the new building, the demolition of the existing 1,440m2 temporary 8-classroom with 2-classroom special education building;- and Phase 2 incorporating;- B) the provision of a new 885m2 two-storey 8-classroom extension with ancillary spaces connected to Phase 1 in the location of the demolished existing temporary school building including all associated site works

Maynooth Educate Together , RailPark , Celbridge Road Maynooth

309m
21199CONDITIONAL22 Feb 2021

for the construction of a ground floor single storey extension and two storey first floor extension, both to the rear of the existing dormer style semi-detached dwelling incl. minor internal modifications and the addition of a bedroom at first floor together with all associated landscaping, site works and services

No. 5 Griffin Rath Manor (Townland: Moneycooley) , Maynooth , Co. Kildare

335m
181151CONDITIONAL19 Sept 2018

change of use of 80sq.m warehouse space to office use, internal alterations and associated site works

Unit H2 Maynooth Business Campus , Maynooth , Co. Kildare

339m
17286N/A15 Mar 2017

of the existing internal alterations and increase in overall floor area of the previously approved (planning Ref. 99/2073 and 07/73) layout of Unit J2, Maynooth Business Campus. The works include the retention of additional floor area (156sqm) at first floor level providing 2 offices, 2 WC’s, a server room, canteen, circulation and all ancillary services; the sub-division of the northern part of the previously approved first floor layout (149.1sqm) providing 5 offices; and the sub-division of the southern area of the previously approved ground floor (160.4sqm) providing an archive room, strong room, male and female toilets, circulation space and the removal of one WC. The alterations to the layout and additional floor at first floor level have increased the gross floor area of the existing building from 476.1sqm to 636sqm approximately

Unit J2 Maynooth Business Campus , Strafford Road , Maynooth

340m
1771N/A26 Jan 2017

for the existing alterations to Unit J2 (156sqm) comprising of the addition of a first floor slab (156sqm) which contains 2 offices, 2 WC's, server room, canteen, corridor and all ancillary services

Block J , Maynooth Business Campus , Maynooth

344m
17361CONDITIONAL4 Apr 2017

of the existing internal alterations and increase in overall floor area of the previously approved (planning Ref. 99/2073 and 07/73) layout of Unit J2, Maynooth Business Campus. The works include the retention of additional floor area (156sqm) at first floor level providing 2 offices, 2 WC’s a server room, canteen, circulation and all ancillary services; the sub-division of the northern part of the previously approved first floor layout (149.1sqm) providing 5 offices; and the subdivision of the southern area of the previously approved ground floor (160.4sqm) providing an archive room, strong room, male and female toilets, circulation space and the removal of one WC. The alterations to the layout and additional floor at the first floor level have increased the gross floor area of the existing building from 476.1sqm to 636sqm approximately. No alterations have been made to the existing, previously approved office to the northern area of the ground floor (45sqm). Revised by Significant Further Information which consists of application includes change of use from industrial to offices

Unit J2 Maynooth Business Campus , Straffan Road , Maynooth

The submission window has closed

Observations on this application closed on Sunday 9 August 2026, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?