Monread Business Park , Monread Road , Naas Co. Kildare
N/APlanning application 2661127
Kildare - Kildare County Council
Proposed Development
The development will consist of a RED III Solar Farm (renewable energy development) on a site having a total area of approximately 6.4 hectares. The proposed development will comprise 9,240 no. photovoltaic solar modules mounted on ground-mounted support structures connected to 15 no. inverters; 1 no. single-storey electrical transformer station; 1 no. single-storey spare-parts storage container; 1 no. weather station; underground electrical ducting and cabling within the application site; security fencing and access gates; CCTV cameras; internal access tracks; a temporary construction compound; landscaping; boundary treatment; and all associated ancillary development, site development and drainage works. Construction and operational access will be provided via the existing internal access road serving the site, which connects to Monread Road through the existing signal-controlled junction serving Monread Business Park. The proposed solar farm will have an operational lifespan of 40 years from the date of commissioning. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
Application Timeline
Application received
14 Oct 2026
Decision due (upcoming)
8 Dec 2026
Application Details
- Location
- Monread Business Park , Monread Road , Naas Co. Kildare
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 6.4 ha
Timeline
- Registration Date
- 14 October 2026
- Status
- NEW APPLICATION
- Decision
- N/A
- Decision Due
- 8 December 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for the development of a solar farm on a site having a total area of approximately 6.4 hectares. The proposed development will comprise 9,240 no. photovoltaic solar modules mounted on ground-mounted support structures connected to 15 no. inverters; 1 no. single-storey electrical transformer station; 1 no. single-storey spare-parts storage container; 1 no. weather station; underground electrical ducting and cabling within the application site; security fencing and access gates; CCTV cameras; internal access tracks; a temporary construction compound; landscaping; boundary treatment; and all associated ancillary development, site development and drainage works. Construction and operational access will be provided via the existing internal access road serving the site, which connects to Monread Road through the existing signal-controlled junction serving Monread Business Park. The proposed solar farm will have an operational lifespan of 40 years from the date of commissioning.
Monread Business Park , Monread Road , Naas Co. Kildare
to erect a 724 sqm temperature controlled extension to the existing manufacturing facility with ridge height not exceeding 12.65m high to the South west facing elevation, complete with internal minor modifications and associate site ancillary works
IDA Industrial Estate , Monread Road , Naas
16 no. light industrial / warehouse units (272.5sqm ea) housed in 2 no. blocks (Block 1 & 2), total proposed building area 4,472sqm, including all associated site works, roads, and services, accessed via Maryfield Court Road off Monread Road, forming phase 1 of a 2 phase development at this site
Monread Road , Naas , Co. Kildare
the demolition of an existing dwelling measuring 191m2 and replacement with the construction of a car park on the site and all associated site works
Ted Johnsons , Maryfield , Monread Road
agricultural shed of circa 1200sqm., ancillary concrete apron, recessed entrance, surface water to soakaways, all associated site works
Monread North , Naas , Co. Kildare.
The development consists of (1) Retention of changes to granted development (Ref 20/868), involving the reduction of new build floor area by 169.5 m2 at ground floor level & 557.5 m2 at first floor level. (2) Retention of new cladding & raised parapet to front elevation of existing building. (3) Planning for new signage to front boundary (previously granted under expired planning ref 10/500062)
TED JOHNSTON LTD. , MONREAD ROAD , NAAS
the demolition of an existing single storey storage/warehouse area with a floor area of 452sqm, and the construction of a new 2 storey extension including a mezzanine for the purpose of storage with a gross floor area of 1325sqm and all associated site works
Monread Road , Naas , Co. Kildare.
Extension of Duration of Planning Ref. No. 18/454 - 20 no. Light Industrial/Warehouse Units (277.3sqm ea), total proposed building area 5,606.2sqm, including all associated site works, road, and services ,accessed via Maryfield Court Road off Monread Road, forming phase 2 of a 3 phase development (phase 1 granted under pl. Ref.no. 17/574)
Monread Road , Naas , Co. Kildare.
development will consist of: Retention of the existing façade; Replacement of the existing roller shutter with glazed panels and a glazed double door; Replacement of the existing Perspex windows with new aluminium-framed glazed windows; Installation of a new individual-letter illuminated logo/signage to the upper section of the existing façade; All associated site development and ancillary works.
Unit 35 Monread Industrial Park , Monread Rd , Naas
20 no. Light Industrial/Warehouse Units (277.3sqm ea), total proposed building area 5,606.2sqm, including all associated site works, road, and services ,accessed via Maryfield Court Road off Monread Road, forming phase 2 of a 3 phase development (phase 1 granted under pl. Ref.no. 17/574)
Monread Road , Naas , Co.Kildare
Affected by this application?
Open for submissionsObservations close on Tuesday 17 November 2026, five weeks from the date the application was received. The fee is €20, and only planning grounds count.
Check if you have grounds — freeTwo questions, no payment: we'll tell you whether what concerns you is something the council can actually take into account.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?