Proposed Development
for the construction of a barn comprising of 3 No stables Tack room, fodder storage area, dung stead , sand area, upgrade of existing farm entrance to fully recessed entrance and all site works.
Application Timeline
Application received
18 Nov 2026
Decision due (upcoming)
21 Jan 2027
Application Details
- Location
- Oldmilltown , Kill , Co Kildare
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kildare County Council
- Site Area
- 2.55 ha
Timeline
- Registration Date
- 18 November 2026Other applications received that week
- Status
- NEW APPLICATION
- Decision
- N/A
- Decision Due
- 21 January 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for provision of fully recessed farm entrance
Oldmilltown , Kill , Co. Kildare
for construction of Barn, comprising of 3 no stables , tackroom, dungstead and sand exercise area. Revised by Significant Further Information which consists of: Change to redline boundary
Oldmilltown , Kill , Co. Kildare
for fully recessed farm entrance
Oldmilltown , Kill , Co. Kildare
the construction of a barn comprising of 3 no stables , tack room, , fodder storage area, dung stead, sand area, upgrading of existing farm entrance and all associated site works
Oldmilltown , Kill , Co Kildare
of a single-storey extension to the side of the existing single-storey dwelling and planning permission for (a) decommissioning of existing septic tank and soakpit, (b) installation of new treatment system and percolation area along with all associated site development and facilitating works
Oldmill House , Kill , Co. Kildare
of a single-storey extension to the side of the existing single-storey dwelling and planning permission for (a) decommissioning of existing septic tank and soakpit, (b) installation of new treatment system and percolation area along with all associated site development and facilitating works
Oldmill House , Kill , Co. Kildare
for the construction of a single storey flat roof extension to the rear of the existing dwelling, minor alterations to the elevations of the existing dwelling, and installation of Tricel sewage treatment system with percolation area, along with all associated site works
Oldmilltown , Kilteel , Co. Kildare.
For the development of an extension of the existing control building at ESB Kilteel 110kV and all associated ancillary infrastructure required for the project
Oldmilltown , Kilteel , Co. Kildare.
the development of a new electrical substation and additional equipment in the existing ESB Kilteel 110kV Substation to facilitate the connection of the Porterstown Battery Storage Facility (Planning Ref 18/247) The total site area is 1.2 hectares. The new electrical substation will include 1 control building (GRP Containerised Substation), a 110kV transformer, surge arresters, instrument transformers, a 110kV busbar connecting to the ESB substation, a lightning mast and other electrical equipment to be installed on concrete support structures. Additional features will include palisade fencing, security gates, access tracks, external lighting, drainage, associated electrical cabling and ducting, CCTV security monitoring system, landscaping and all associated ancillary infrastructure. The additional equipment to be installed in the ESB substation to facilitate the connection of the new substation will include a 110kV busbar extension, a 110kV transformer bay, a 110kV coupler bay, a 110kV busbar connecting to the new substation, an interface kiosk, palisade fencing, a lightning mast and all associated ancillary infrastructure required for the connection
Porterstown , Kill , Co. Kildare.
to erect 709.89 m2 or 131 kWp of photovoltaic panels on the roof of our existing building at Oman Moving & Storage, with all associated site works
Bond Business Support Limited , Oman Moving & Storage , Atlantic House Oldmill
Affected by this application?
Open for submissionsObservations close on Tuesday 22 December 2026, five weeks from the date the application was received. The fee is €20, and only planning grounds count.
Check if you have grounds — freeTwo questions, no payment: we'll tell you whether what concerns you is something the council can actually take into account.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?