← Back to search

the IDA Science and Technology Park , Gorteens Belview , Slieverue

CONDITIONAL

Planning application 1777

Kilkenny - Kilkenny County Council

Proposed Development

for development. The development will consist of an extension to the existing milk powder processing plant, extensions to the existing Administration Building to accommodate an enlarged food preparation area, additional personnel facilities, offices and a laboratory. The development will also include alterations to existing roads, car parks, drainage system, services and landscaped areas, a new 97 space car park, truck loading and unloading bays, paved areas and all associated drains and services including site lighting and landscaping works. The existing facility holds an industrial emissions licence issued by the Environmental Protection Agency (EPA)

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    13 Feb 2017

  2. Further information requested

    6 Apr 2017

  3. Further information received

    20 Apr 2017

  4. Decision: CONDITIONAL

    15 May 2017

  5. Decision due

    17 May 2017

  6. Grant issued

    16 Jun 2017

Application Details

Location
the IDA Science and Technology Park , Gorteens Belview , Slieverue
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kilkenny County Council
Site Area
1.142 ha

Timeline

Registration Date
13 February 2017
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
15 May 2017
Grant Date
16 June 2017
Permission Expires
15 June 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

83m
19378CONDITIONAL30 May 2019

and retention permission for development at the site situated at IDA Science and Technology Park, Gorteens, Belview, Port Road, County Kilkenny. The development will consist(s) of planning permission for a proposed new CHP plant, in lieu of boiler building from previously granted planning permission (ref 17153). Retention permission for reduction in size of Dairy Intake Building No.2 from previously granted planning permission (ref 17153), for mirroring of warehouse layout and partial increase in height of warehouse filling area from level +39.85m to +44.56m, for relocation of warehouse previously granted roof access stairs from north end of warehouse to west side of warehouse and the addition of a second warehouse roof access stairs located on the warehouse roof, for addition of cladding to evaporator stairs (previously an external stairs, planning ref 17153) and increase in height of stairs from previously approved level +47.05m (planning ref 17153) to +57.32m, for alterations to evaporator building layout including relocation of external silos from east side of building to south side, for relocation of RO Building previously granted under planning ref1419, for relocation of waste yard from the middle of the site to along the southern boundary. Amendment to previously approved planning ref 17153 for removal of extension to phase 1 Wet Process area, Cooling Tower No.2 and additional gas skid adjacent to Phase 1 Warehouse (planning ref 17153) Minor amendments to external plant and machinery, pipe bridges and ingredient silos and refrigeration plant. This application includes minor amendments to landscaping, internal road changes with lighting works, underground services, roof mounted items of plant and equipment with access platforms and ancillary external. The proposed planning permission and retentions and amendments are located within the existing site boundary of 51.01 acres (20.64 hectares approx.) This application relates to development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.

IDA Science and Technology Park , Gorteens , Belview

83m
17775CONDITIONAL23 Nov 2017

to construct a screening berm at their existing Dairy Processing Facility. The development will consist of: A screening berm located on the North West corner of the site with associated landscape planting. The berm will adjacent to the North West corner having a total length of appoxinately 227m and will rise to circa 4m above existing ground level. The proposed planting scheme has been informed by the existing flora and will blend and match with the existing landscape. The proposed berm and planting will be fully located within the existing site boundary of 51.01 acres (20.64 hectares approx.) This application complements the existing development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.

Gorteen , Belview Port , Port Road

111m
17153CONDITIONAL13 Mar 2017

for extensions to the existing Dairy Processing Facility. The proposed extensions will incorporate a new Warehouse similar height to existing, five storey Production Building 46.25m high, Evaporator Building similar height to existing two storey extension to the Production Building/Wet Process similar height as existing, single storey extension to the Utility Building, New Boiler Building similar height to existing (with new exhaust stack 45m), new Dairy Intake Building similar height to existing, single storey extension to the Sprinkler Building, as well as some additional other items of external plant and machinery, pipe bridges, ingredient silos and refrigeration plant. The proposed extensions also includes landscaping, internal road changes with lighting and ancillary external works, including underground services and the relocation of the existing Waste Yard and Contractor's compound, roof mounted items of plant and equipment with access platforms. In addition to this a construction compound will be formed, which on completion of construction will be removed, and the landscaping will be re-instated to match existing. The total new building area is approx. 12,043sqm. The proposed extensions are located within the existing site boundary of 51.01 acres (20.64 hectares approx.) This application relates to development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended. An Environment Impact Statement and a Natura Impact Statement will be submitted to the planning authority with the application

IDA Science & Technology Park , Gorteens , Belview Port Road

195m
2144CONDITIONAL29 Jan 2021

for development. The development will comprise amendments to previously approved development (Planning Ref 12/324; An Bord Pleanala Ref PL10.241077 and Planning Ref 17/153) comprising the development of two boreholes and associated works for the purpose of water abstraction for use in the Milk Processing Plant. The application also seeks permission for the continued use of the existing construction compound for the duration of the works. A Natura Impact Statement will be submitted with the Planning Application. The Glanbia Ireland DAC facility has an Industrial Emissions Licence granted by the EPA

IDA Science & Technology Park , Gorteens Port Road , Slieverue

229m
18120CONDITIONAL21 Feb 2018

for the extension to an above ground natural gas installation. The development will consist of regulator/meter kiosk, boiler kiosk, underground and aboveground pipework, 2.4 m. high paladin fencing, light columns and all ancillary services and associated site works at

IDA Science & Techology Park , Gorteens , Belview

234m
22158N/A11 Mar 2022

for the development of an offline upgrade of Local Road L3412 to a Type 2 Single Carriageway Road for 758m west of the existing IDA Ireland roundabout, the construction of a new roundabout providing access to IDA Ireland lands and all ancillary works above and below ground. Amendments to a previous permission Kilkenny Council file reference numbers PL10.241077 and 17/1775, are included in this development comprising the relocation of an existing screening berm 40 to 45m sough of its current position and reinstatement of screening planting, in the townlands of Gorteens and Kilmurry, Belview, Co Kilkenny. A Natura Impact Statement has been prepared in respect of this planning application.

Gorteens and Kilmurry , Belview , Co Kilkenny

242m
20926N/A23 Dec 2020

for the development of an offline upgrade of Local Road L3412 to a Type 2 Single Carriageway Road for 758m west of the existing IDA Ireland roundabout, the construction of a new roundabout providing access to IDA Ireland lands at Gorteens and Kilmurry Co Kilkenny and all ancillary works above and below ground. Amendments to a previous permission, Kilkenny Council file reference numbers PL10.241077 and 17/1775, are included in this development comprising the relocation of an existing screening berm 40 to 45m south of its current position and reinstatement of screening planting. A Natura Impact Statement has been prepared in respect of this planning application.

townlands of Gorteens and , Kilmurry , Belview

243m
2560631CONDITIONAL30 Sept 2025

Tirlán Ireland are applying for retention permission for the following existing development. The Existing Development consists of two existing groundwater abstraction wells and associated works for the purpose of water abstraction to serve the existing Facility's Milk Processing Plant (Planning Ref - 12/324). The Existing Development includes the following elements: Two lined boreholes drilled to the required depth; Submersible pumps and associated pipework and cabling; Surface features including cabinets containing the well head, valves and pipework and the electrical services and controls for the pumps; Gated security fencing each cabinet enclosure. An Appropriate Assessment Stage 1 - Screening Report and Environmental Impact Assessment Screening Report will be submitted with the Application.

IDA Science and Technology Park , Gorteens Port Road , Slieverue Co. Kilkenny

252m
21989CONDITIONAL3 Dec 2021

for development at this site. The development consists of the installation of a Combined Heat and Power (CHP) unit including a 7.55m high stack, stack access ladder and platform, improvements to the internal estate road and ancillary site works at the permitted cheese manufacturing plant, planning permission reference no. 19/668 (APB-306136-19). An Industrial Emissions Licence is required for the cheese manufacturing plant and the proposed development. A Natura Impact Statement will also be submitted with the application.

IDA Ireland , Belview Science and Technology Park , Gorteens Slieverue

257m
2660676N/A23 Oct 2026

for a 10-year planning permission for a relevant solar energy development consisting of the installation of a ground-mounted solar photovoltaic plant with an approximate capacity of 1.87 MWp DC and a grid connection capacity of approximately 1.56 MW AC. The proposed development will include approximately 2,592 photovoltaic modules installed on fixed mounting structures supported by a driven pile system. The development will also comprise underground direct current and alternating current cabling, string combiner boxes, inverters, a transformer, perimeter security fencing with wildlife access points, CCTV cameras where required, associated drainage measures and all associated civil and site development works. The grid connection will be made via underground cabling to the existing on-site substation located to the southeast of the solar photovoltaic installation. The development will also include the continued use of the existing construction compound, throughout the construction and operational lifespan of the solar photovoltaic development. Upon cessation of the permitted use, the solar photovoltaic development, its associated infrastructure and the construction compound will be removed, and the affected lands will be reinstated. The Tirlán site currently operates under Industrial Emissions Licence Register No. P0963-02 and Greenhouse Gas Emissions Permit No. IE-GHG175-03. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413), and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

Tirlán Limited , Belview Science & Technology Park , Belview Slieverue