Kilree , Sheastown , Bennettsbridge

REFUSED

Planning application 18861

Kilkenny - Kilkenny County Council

Proposed Development

of planning permission P.03/75

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    27 Dec 2018

  2. Decision: REFUSED

    20 Feb 2019

  3. Decision due

    26 Feb 2019

Application Details

Location
Kilree , Sheastown , Bennettsbridge
Applicant
N/A
Application Type
EXTENSION OF DURATION
Planning Authority
Kilkenny County Council

Timeline

Registration Date
27 December 2018
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
20 February 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

101m
18150CONDITIONAL7 Mar 2018

for the continued use of an existing asphalt plant and associated infrastructure and structures permitted under Planning Refs 99/1161 / ABP PL10.120270 and 04/129, within an application area of 1.7 hectares. The proposed development will not result in any increase in the permitted production capacity of the asphalt plant of 100,000 tonnes per annum at

Kilree , Sheastown , Bennettsbridge

121m
18860REFUSED27 Dec 2018

of planning permission P.03/1532

Kilree , Sheastown , Bennettsbridge

176m
20891CONDITIONAL18 Dec 2020

for development. The development consists of a Planning Application for the removal of existing office cabins and the proposed erection of a new office structure, the erection of entrance walls and signage and all associated ancillary facilities within an existing quarry complex

Kilree , Sheastown , Bennettsbridge

197m
21108CONDITIONAL23 Feb 2021

for dwelling, entrance, wastewater treatment system, connection to mains water, soakpits and all other associated site works

Kilree , Bennettsbridge , Co Kilkenny

197m
2283N/A15 Feb 2022

Ref 21-108 for dwelling, entrance, wastewater treatment system, connection to mains water, soakpits and all other associated site works

Kilree , Bennettsbridge , Co Kilkenny

272m
18858CONDITIONAL27 Dec 2018

The development consists of a total area of 36.5 Hectares comprising of the following: Deepening of 13.4 hectares which was previously subject to rock extraction down to 12mOD; Removal of overburden, construction of screening berms and extraction of rock down to 30mOD from a greenfield area consisting of 8.5 hectares; Continuation of use of 11.6 hectares consisting of processing infrastructure (crushing, screening & lime plant), offices, workshop, canteens and toilet facilities , weighbridges, wheelwash facilities, fuel storage area and switch room, settlement lagoons, entrance, haul roads, ESB sub-station and all other ancillary facilities; Continuation of use of existing pre-cast manufacturing facility and associated ancillary works for manufacturing of concrete products, batching of lime products and general storage of products and plant on an area of 3.0 hectares; Landscaping and restoration of the site and all associated ancillary facilities/works; The Applicant is seeking a 20 year permission as part of the planning application. The planning application is accompanied by an Environmental Impact Assessment Report and a Natura Impact Statement.

Kilree , Sheastown , Bennettsbridge

279m
17316CONDITIONAL12 May 2017

for the development which consists of a total area of 24.5 Hectares comprising of the following: (a) Extraction of rock from an area consisting of 6.9 hectares which was previously subject to rock extraction. Rock will be extracted down to a level of 30m above Ordnance Datum which is the floor level of the existing working quarry. (b) Access and stockpiling of raw and finished aggregates on an area consisting of 2.6 hectares, (c) Continuation of use of the existing authorized quarry area and existing quarry infrastructure consisting of crushing, screening and lime plant, office, workshop, canteens and toilet facilities, weighbridges, wheelwash facilities, settlement lagoons, fuel storage area and switch room, ESB sub-station, quarry entrance, haul roads and all other ancillary facilities, (d) landscaping and restoration of the site and all associated ancillary facilities/works. (e) The applicant is seeking a 5 year permission as part of the planning application. The application is accompanied by an Environmental Impact Statement and a Natura Impact Statement

Kilree , Sheastown , Bennettsbrige

281m
21902N/A2 Nov 2021

for development. The proposed development will consist of construction of a single storey dwelling, new entrance, garage, new wastewater treatment system and all other associated site works

Kilree , Sheastown , Co Kilkenny

282m
2460611CONDITIONAL8 Dec 2024

for construction of a single storey dwelling, garage, new entrance, new waste water treatment system, and all other associated site works

Kilree , Sheastown , Co. Kilkenny

283m
2360451REFUSED11 Oct 2023

for the construction of a single storey dwelling, garage, new entrance, new waste water treatment system, and all other associated site works

Kilree , Sheastown , Kiklenny

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?