Sion Road , Purcellsinch , Co. Kilkenny

CONDITIONAL

Planning application 19686

Kilkenny - Kilkenny County Council

Proposed Development

for demolition of existing attached domestic garage and rear lobby, alterations, extension and renovation of our existing dwelling plus a new detached single storey domestic garage and store plus all associated site works at

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    25 Sept 2019

  2. Decision: CONDITIONAL

    18 Nov 2019

  3. Decision due

    19 Nov 2019

  4. Grant issued

    20 Dec 2019

Application Details

Location
Sion Road , Purcellsinch , Co. Kilkenny
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kilkenny County Council
Site Area
0.28 ha

Timeline

Registration Date
25 September 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
18 November 2019
Grant Date
20 December 2019
Permission Expires
19 December 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

10m
20915CONDITIONAL22 Dec 2020

for development. The proposed development will consist of a) removal of existing chimneys, garage to side and flat-roof annex to rear, and b) the construction of a single-storey, part pitched-roof part flat-roof extension to sides and rear of existing dwelling, with rooflights, c) new patio area with partial flat-roof to rear, d) new rooflights to front and rear of existing dwelling, e) new bay window to front of existing dwelling, f) widening of existing vehicular entrance to 3.5m, and all associated site works

'Naoimh Brigid' , Sion Road , Kilkenny R95 KPX6

110m
21575CONDITIONAL2 Jul 2021

for development comprising alterations to existing house. The proposed alterations consist of a) Removal of existing chimneys, lowering of the existing roof tiles: b) Two storey extension of cedar clad design to the center rear of the existing dwelling and new section to the center front with clear storey windows; c) Replacement of existing external doors and windows to the front and rear; d) Alterations to the existing interior layout and associated site works. There will be no changes to existing dwelling entrance from the public road.

'Brookvilla' , Sion Road , Purcellsinch

151m
21165CONDITIONAL11 Mar 2021

to construct an extension to the existing external lay down area for plant, machinery and materials together with all associated site works to our facility

IDA Business Park , Purcellsinch , Kilkenny

213m
19156N/A13 Mar 2019

for new surface car park area with all associated site development works

Purcellsinch Industrial Estate , Purcellsinch , Kilkenny

230m
17182CONDITIONAL24 Mar 2017

for the change of use of the following: 1. Change of use of existing industrial building to training facility 2. Change of use of existing offices to training facility 3. Link Canopy between two existing buildings and all associated site development works

Purcellsinch Industrial Estate , Purcellsinch , Kilkenny

242m
22436CONDITIONAL6 Jul 2022

for the following works: the extension of the existing car parking areas to comprise of an additional 30 no. car parking spaces in total in 2 separate locations (22 no. spaces in one location and 8 no. spaces in a second location) including landscaping works and associated ancillary site works

Purcellsinch Business Park , Dublin Road , Kilkenny

246m
19515CONDITIONAL23 Jul 2019

for a 10 year planning permission for the construction of a Battery Energy Storage System (BESS). The BESS will consist of: up to 10 no. containerised battery storage modules (up to 14.6m in length, 2.8m in height and 2.4m in width) and ancillary equipment including up to: 14 no. transformers, 28 no. inverters, 14 no. ring main units; a 38kV electrical substation and ESB substation building (10m in length, 6.2m in height and 7.4m in width); electrical equipment building (20m in length, 8.2m in height and 7.4m in width); underground surface water attenuation tank; underground foul storage tank; access and internal circulation road with new junction onto existing IDA private road; 6 no. car parking spaces; landscaped berm wall up to 2m height and native tree and scrub planting, screening wall up to 3m height; 3m high paladin security fence; and all other associated site development works including surface water and foul drainage required to facilitate the development

Indutrial Development Agency (IDA) Business and Technology Park , Purcellsinch , Dublin Road

251m
17818CONDITIONAL11 Dec 2017

for development which will consist of the construction of a 100MW Battery Energy Storage System (BESS) with associated balance of plant, equipment and buildings including; a BESS building of 8m height, 82m length and 44m width (comprising on the ground floor a battery rack room, meeting room, Contractor/Storeroom, wet room, UPS room, switch gear room, WC, Transformer rooms, Inverter rooms; and on a mezzanine floor a HVAC/Store room); 2 no. 905m3 firewater storage tanks; an underground 830m3 surface water attenuation tank; an underground 1030m3 firewater retention tank; a 110KV electrical substation and control building of 5.2m height; an access and circulation road with new junction onto an existing IDA private road; footpath, 8 no. car parking spaces; landscaped berm wall up to 2.0m height and native tree and scrub planting, 3m paladin security fence; and all other associated site development works including surface water and foul drainage required to facilitate the developments

IDA , Purcellsinch , Dublin Road

254m
2155CONDITIONAL3 Feb 2021

for internal alterations to the existing dwelling including new windows and external cladding, a new single storey link to a new two storey extension to the side and rear comprising a garage, with a home office, workshop, bathroom and living room; the demolition of the existing garden shed and external toilet and pump house; removal of oil fired boiler and installation of an ASHP; demolition of part of the front boundary wall and gate pillars and build up part boundary wall to close the existing site entrance and raising the adjacent site levels; form a new vehicular site entrance with drive and onsite parking and retention of the existing agricultural entrance; decommissioning of the existing septic tank and percolation system; installation of a new waste water treatment system with polishing filter and the installation of a rainwater harvesting system; new landscape works as indicated on the application drawings

Sion Road , Lavistown , Kilkenny

278m
18321UNCONDITIONAL17 May 2018

of Planning Permission Reference 12/472 at

Purcellsinch Industrial Estate , Kilkenny

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?