← Back to search

Lacken , Bonnetstown , Co Kilkenny

REFUSED

Planning application 2130

Kilkenny - Kilkenny County Council

Proposed Development

for development consisting of a single storey dwelling house, detached domestic garage, waste water treatment system and polishing filter and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    26 Jan 2021

  2. Decision: REFUSED

    15 Mar 2021

  3. Decision due

    22 Mar 2021

Application Details

Location
Lacken , Bonnetstown , Co Kilkenny
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kilkenny County Council
Site Area
0.304 ha
Floor Area
248 sq m
Residential Units
1

Timeline

Registration Date
26 January 2021
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
15 March 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

221m
21808CONDITIONAL28 Sept 2021

for construction of two storey dwelling house, domestic garage, vehicular entrance, foul effluent treatment system and all associated site works

Cloranshea , Bonnettstown , Co. Kilkenny

406m
22156CONDITIONAL11 Mar 2022

to construct an over-ground slurry storage tank and associated site works with the development

Bonnetstown , Co Kilkenny

481m
2560375CONDITIONAL24 Jun 2025

development to the dwelling house at Lacken, County Kilkenny consisting of: a) The demolition of the existing front porch and the rear bathroom extensions b) Refurbishment of the existing 2 storey dwelling including a new roof with raised ridge level (+0.7M), replacement windows & new window openings, re-rendered walls & closing up of the front door c) A new 2 storey extension to the south d) New driveway to south of the dwelling e) Relocation of the dwelling entrance to the upper level on the south side f) New wastewater treatment system g) And associated site works

Lacken , Kilkenny , R95 TF80

582m
1933N/A25 Jan 2019

to build a dwelling house, detached domestic garage, effluent treatment system and polishing filter and all associated site works

Lacken , Co. Kilkenny

582m
21386CONDITIONAL6 May 2021

is sought for a change of house type, relocation of the proposed dwelling and garage and alterations to site boundaries from previously granted planning permission ref. no. P15/782 and all associated site development works

Lacken , Rathmoyle , Co Kilkenny

611m
2660458N/A17 Jul 2026

to retain existing 2 no. bedrooms on first floor level, extension to right side of existing dwelling house. Planning Permission to carry out internal and external alterations/modifications and all associated site development works

Lacken , Rathmoyle , Co. Kilkenny

684m
23207CONDITIONAL30 Aug 2023

for the proposed renovations to existing dwelling, proposed single storey front and rear extensions, proposed stormwater soakaways, landscaping and all associated site works. Proposed Retention permission of existing dwelling and associated site works

Lacken , Rathmoyle , Co. Kilkenny

797m
17848CONDITIONAL20 Dec 2017

for the following: (1) change of house plans from that previously granted in Planning Permission Reference No. 09/571 and (2) all ancillary site services. The biocycle unit, percolation area and entrance onto public road are unaltered from that as granted in Planning Permission Reference No. 09/571

Bonnettstown , Co. Kilkenny

797m
17812N/A7 Dec 2017

for the following: (1) change of house plan from that previously granted in Planning permission reference No.09/571 and (2) all ancillary site services. The biocycle unit, percolation area and entrance onto public road are unaltered from that as granted in Planning Permission Reference No 09/571.

Bonnetstown , Co. Kilkenny

834m
2560303CONDITIONAL29 May 2025

for the erection of a dwelling house and domestic garage / store with treatment system and percolation area and all associated site works

Newtown , Bonnettstown , Co. Kilkenny

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?