← Back to search

Courtnabooly East , Callan , Co Kilkenny

CONDITIONAL

Planning application 21335

Kilkenny - Kilkenny County Council

Proposed Development

for construction of a livestock underpass and effluent holding tank and all associated siteworks

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    26 Apr 2021

  2. Further information requested

    17 Jun 2021

  3. Further information received

    7 Dec 2021

  4. Decision: CONDITIONAL

    7 Jan 2022

  5. Decision due

    12 Jan 2022

  6. Grant issued

    9 Feb 2022

Application Details

Location
Courtnabooly East , Callan , Co Kilkenny
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kilkenny County Council
Site Area
0.32 ha

Timeline

Registration Date
26 April 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
7 January 2022
Grant Date
9 February 2022
Permission Expires
8 February 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

364m
18256CONDITIONAL24 Apr 2018

for single storey kitchen extension to side of existing house and associated site works at

Coolaghmore , Callan , Co Kilkenny

431m
20613CONDITIONAL18 Sept 2020

to construct a bungalow, garage, entrance, wastewater treatment system with soil polishing filter, borehole, soakpits and all other associated site works

Coolaghmore , Callan , Co. Kilkenny

642m
18117CONDITIONAL21 Feb 2018

to construct a silage pit and a slatted cattle walkway and all associated site works at

Courtnabooly West , Callan , Co. Kilkenny

644m
17644N/A29 Sept 2017

to construct a cattle underpass and all associated site works under the public road

Courtnabooly , West Callan , Co. Kilkenny

809m
21336CONDITIONAL26 Apr 2021

for construction of 2 no. livestock underpasses and effluent holding tanks and all associated siteworks

Courtnabooly West & , Courtnabooly East , Callan

962m
20899CONDITIONAL21 Dec 2020

for proposed development which will consist of a 20kV grid connection from the consented Ballytobin Solar Farm to the existing 38kV ESB substation south of Callan Co.Kilkenny. The grid connection is 3.6km long. The grid connection line will consist of c.496m of overhead line and c.3.1km of underground cable. The cable ducting will be located in the existing road verge and in the road itself with short section of c.25m on the solar farm to connect to the overhead line. The applicaiton is accompanied by a Natura Impact Statement (NIS). An appropiate period of 10 years (ie.duration of the planning permission to construct the development) is sought, with an operational life of up to 30 years after the date of commissioning

Ballytobin , Bolton , Callan

983m
2660316N/A26 May 2026

for a 10-Year planning permission for development at this site located in the townlands of Ballytobin & Ballyhall, County Kilkenny. The development will consist of the construction of a Single Wind Turbine development on an 8.96-hectare site consisting of: - I. A single 4.26-megawatt (MW) wind turbine with an overall tip height of 159m, comprising a rotor diameter of 138m and a hub height 90m; II. Wind turbine foundation, crane hardstanding and assembly area; III. Temporary Construction Compound; IV. Upgrade of an existing field entrance to new wind farm site entrance; V. Upgrading and widening of existing access tracks; VI. New access tracks; VII. An on-site 20kV electrical substation, comprising of 2 Modular Substation Buildings; VIII. Electrical and communication cabling within private lands; IX. Tree felling, landscaping and reinstatement works; and X. All associated ancillary works. The operational lifespan of the development will be 35-years from the date of commissioning. The Development consists of works within the curtilage of Ballytobin House, a protected structure, reference ‘C315’ as listed on the County Kilkenny Record of Protected Structures. This Planning Application is not subject to a Natura Impact Statement (NIS) or Environmental Impact Assessment Report (EIAR). This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.

Ballytobin & Ballyhall , Co. Kilkenny , Ireland

983m
2660259N/A1 May 2026

for the construction of a Single Wind Turbine development on an 8.96-hectare site consisting of: - I. A single 4.26-megawatt (MW) wind turbine with an overall tip height of 159m, comprising a rotor diameter of 138m and a hub height 90m; II. Wind turbine foundation, crane hardstanding and assembly area; III. Temporary Construction Compound; IV. Upgrade of an existing field entrance to new wind farm site entrance; V. Upgrading and widening of existing access tracks; VI. New access tracks; VII. An on-site 20kV electrical substation, comprising of 2 Modular Substation Buildings; VIII. Electrical and communication cabling within private lands; IX. Tree felling, landscaping and reinstatement works; and X. All associated ancillary works. The operational lifespan of the development will be 35-years from the date of commissioning. This Planning Application is not subject to a Natura Impact Statement (NIS) or Environmental Impact Assessment Report (EIAR).

Ballytobin & Ballyhall , Co. Kilkenny

983m
2660246N/A24 Apr 2026

We, ART Generation Limited, intend to apply for a 10-Year planning permission for development at this site located in the townlands of Ballytobin & Ballyhall, County Kilkenny. The development will consist of the construction of a Single Wind Turbine development on an 8.96-hectare site consisting of: - I. A single 4.26-megawatt (MW) wind turbine with an overall tip height of 159m, comprising a rotor diameter of 138m and a hub height 90m; II. Wind turbine foundation, crane hardstanding and assembly area; III. Temporary Construction Compound; IV. Upgrade of an existing field entrance to new wind farm site entrance; V. Upgrading and widening of existing access tracks; VI. New access tracks; VII. An on-site 20kV electrical substation, comprising of 2 Modular Substation Buildings; VIII. Electrical and communication cabling within private lands; IX. Tree felling, landscaping and reinstatement works; and X. All associated ancillary works. The operational lifespan of the development will be 35-years from the date of commissioning.

Ballytobin , Co. Kilkenny , Ireland

1.2km
18175CONDITIONAL16 Mar 2018

to construct a new agricultural storage shed for the purpose of storing dry farm produce along with all associated site works

Ballaghtobin , Callan , Co Kilkenny

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?