Parksgrove and Ballyconra , Ballyragget , Co. Kilkenny
CONDITIONALPlanning application 22126
Kilkenny - Kilkenny County Council
Proposed Development
for a 10 year planning permission for a 17.346 Hectare Solar Farm, consisting of solar panels fixed to ground mounted steel frames, electricity control room, power inverter units, underground cable ducts, security fence, solar powered CCTV and lamp standard and all associated works. The solar farm will have an operational life of 40 years. Some of the Development is within the curtilage of Ballyconra House, a protected structure. A Natura Impact Statement will be submitted with the application
View the full application file on the council's planning portal →Application Timeline
Application received
1 Mar 2022
Further information requested
21 Apr 2022
Further information received
16 Jun 2022
Decision: CONDITIONAL
12 Jul 2022
Decision due
13 Jul 2022
Grant issued
12 Aug 2022
Application Details
- Location
- Parksgrove and Ballyconra , Ballyragget , Co. Kilkenny
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Kilkenny County Council
- Site Area
- 17.34 ha
Timeline
- Registration Date
- 1 March 2022
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 12 July 2022
- Grant Date
- 12 August 2022
- Permission Expires
- 11 August 2032
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to construct a two-storey dwelling, detached garage, septic tank/percolation area, and all associated site works to include omission of a number of the solar panels on ground mounted steel frames as granted planning reference 16/607
Parksgrove , Ballyragget , Co. Kilkenny
to amend previous permission 18/760. The proposed amendments consist of the following, a new single storey house design, the revised location of the revised house within the site outline to that as granted by planning permission ref. no. 18/760 and all associated site works
Parksgrove , Ballyragget , Co. Kilkenny
for development. The development will consist of an extension to an existing Above Ground Installation comprising additional 2.4 m-high palisade security fencing and 2.4 m-high paladin boundary fencing; a pedestrian access gate; an emergency pedestrian gate; internal concrete road pavement and gravelled areas; site lighting; all ancillary works and services including surface water drainage and landscaping
Ballyconra , Ballyragget , Co. Kilkenny
PERMISSION for development at site situated at Ballyconra, Ballyragget. The development will consist of: A two storey extension to existing Research and Development Facility to accommodate a pilot plant, laboratories, storage, dryer and wet process rooms, associated equipment and roof mounted air handling equipment. Alterations to the existing Research and Development Facility to accommodate the extension that includes an increase in the first floor area, alterations to northern and western elevations and installation of roof mounted air handling equipment. An extension to an existing carpark North of the site. A new carpark South of the site. Associated site works including a pipe bridge, earthworks, retaining walls, pedestrian routes, drains and services including car park lighting. The extension and alterations to the existing Research & Development Facility will provide a controlled and hygienic environment for product testing and development. The new carparks north and south of the plant will replace parking spaces (57 No. spaces) removed to facilitate the extension to the Research and Development Facility and will provide an additional 54 No. spaces. The milk processing plant site holds an industrial emissions licence issued by the Environmental Protection Agency.
Ballyconra , Ballyragget , Co. Kilkenny
for the Proposed installation of a network connection and grid connection, and minor amendments to solar farms previously approved under planning application references 17/669 and 22/126. The proposed development will consist of the installation of a 33kV network connection between the solar farms approved under planning application references 17/669 and 22/126 comprising: c. 921m of overhead line and 9 No. wooden poles; onward connection of said approved solar farms to Ballyragget 38kV Substation by installation of a 38kV cable comprising c. 786m of underground cable and c. 395m of overhead line on 5 No. wooden poles; amendments to solar farm approved under planning reference 17/669 comprising removal of substation and replacement with solar panels; amendments to the layout of the substation approved under planning reference 22/126, and all associated site works
Ballyconra Parksgrove and Moatpark , Ballyragget , Co. Kilkenny
to construct a two-storey dwelling house and detached garage, wastewater treatment system, new private entrance, and all associated site works
Parksgrove , Ballyragget , Co. Kilkenny
for development at their Dairy Processing Plant in Ballyconra, Ballyragget, Co Kilkenny comprising: - Demolition of an existing diesel bund, a chemical storage bund, and of an existing IBC containment area and for the reconstruction of all, at revised locations. - Construction of a two-storey process building. - Construction of a 6-bay intake / dispatch canopy and associated single storey services and welfare building. - Construction of a refrigeration building with roof mounted mechanical equipment, a transformer enclosure, a chilled water storage tank and a hot water storage tank - Construction of a CIP centre complete with associated tanks and vessels and a hot water storage tank adjacent. - Construction of a new chemical storage bund and relocation of an existing permeate storage silo. - Construction of a silo base and plinth for the housing and installation of 10 number silos. - Installation of a modular site cabin and a lightweight metal shed. - Construction of a penthouse roof arrangement, installation of roof mounted transformers and roof mounted air handling equipment. - Construction of an extension to an existing car park complete with modified access - Construction of a new internal access road and for the widening and realignment of the existing internal road network. - Construction, incorporating modifications to an existing external stair and retaining wall arrangement. - Associated site works including earthworks, berm formation, retaining walls, pipe and service bridges, fencing and screening and drainage works including a new process effluent line with overground and below ground sections, and all associated site works including landscaping. This facility holds an industrial emissions licence issued by the Environmental Protection Agency. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will accompany this application.
Tirlán Ltd , Ballyconra Ballyragget , Co. Kilkenny.
A 10 year planning permission for a solar PV development on a ca. 13Ha Site incorporating: • Solar panels on ground-mounted frames over an area of ca. 6.5 ha, string inverters, 1 no. containerised transformer unit, post and wire fencing, CCTV system with 4 no. pole mounted cameras and landscaping; • Underground electrical cables connecting the solar PV development to existing onsite substation. Proposed extension to existing onsite substation of 51.3sqm; • A temporary construction compound; and, • All associated ancillary site development works. The Site is located within the boundary of an Industrial Emissions Licensed facility regulated by the Environmental Protection Agency, Licence number P0359-03.
Tirlan , Ballyconra Ballyragget , Kilkenny
for a two storey extension to their existing Research and Development Facility to accommodate a pilot plant, laboratories, storage, dryer and wet process rooms, associated equipment and roof mounted air handling equipment. Alterations to the existing Research and Development Facility to accommodate the extension that includes an increase in the first floor area, alterations to northern and western elevations and installation of roof mounted air handling equipment. An extension to an existing carpark North of the site. A new carpark South of the site. Associated site works including a pipe bridge, earthworks retaining walls, pedestrian routes, drains and services including car park lighting. The extension and alterations to the existing Research & Development Facility will provide a controlled and hygienic environment for product testing and development. The new car parks north and south of the plant will replace parking spaces (57 no. spaces) removed to facilitate the extension to the Research and Development Facility and will provide an additional 54 no. spaces. The milk processing plant site holds an industrial emissions licence issued by the Environmental Protection Agency
Ballyconra , Ballyragget , Co. Kilkenny
for development at their site, the development will consist of: The proposed replacement of an existing Heater Battery through the installation of a new unit complete with supporting platform, to be positioned on an existing roof, all complete with the provision of an external access stairs serviced through an extension of an existing external stairs and all associated site works. The proposed development will result in improved operational efficiency, improved energy efficiency and site safety. The milk processing plant site holds an industrial emissions licence issued by the Environmental Protection Agency
Ballyconra , Ballyragget , Co. Kilkenny
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?