← Back to search

Unit M , Purcellsinch Business Park , Dublin Road Purcellsinch

CONDITIONAL

Planning application 22259

Kilkenny - Kilkenny County Council

Proposed Development

for the following works.: The development will consist of the change of use from office use to apprenticeship workshops and classrooms, extension of unit with the construction of a first floor, external alteration to the façade of the building including new door and window layouts, and all other associated ancillary site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Apr 2022

  2. Decision: CONDITIONAL

    13 Jun 2022

  3. Decision due

    14 Jun 2022

  4. Grant issued

    15 Jul 2022

Application Details

Location
Unit M , Purcellsinch Business Park , Dublin Road Purcellsinch
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kilkenny County Council
Site Area
0.147 ha

Timeline

Registration Date
20 April 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
13 June 2022
Grant Date
15 July 2022
Permission Expires
14 July 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

47m
22436CONDITIONAL6 Jul 2022

for the following works: the extension of the existing car parking areas to comprise of an additional 30 no. car parking spaces in total in 2 separate locations (22 no. spaces in one location and 8 no. spaces in a second location) including landscaping works and associated ancillary site works

Purcellsinch Business Park , Dublin Road , Kilkenny

58m
17182CONDITIONAL24 Mar 2017

for the change of use of the following: 1. Change of use of existing industrial building to training facility 2. Change of use of existing offices to training facility 3. Link Canopy between two existing buildings and all associated site development works

Purcellsinch Industrial Estate , Purcellsinch , Kilkenny

108m
19156N/A13 Mar 2019

for new surface car park area with all associated site development works

Purcellsinch Industrial Estate , Purcellsinch , Kilkenny

114m
17814CONDITIONAL8 Dec 2017

for retention and completion of alterations to include the following: 1. For elevational modifications to include the provision of 5 no. new door openings. 2. For elevational modifications to include the provision of a new canopy. 3. New loading bay/dock leveler. 4. Provision of 17 no. car parking spaces all associated site development works

Unit 4 IDA Ireland , Purcellsinch Business Park , Dublin Road

122m
18588CONDITIONAL5 Sept 2018

for building elevation alterations, new car park layout within the existing site boundary, minor demolitions, and all site and ancillary works at

Purcellsinch Industrial Estate , Purcellsinch , Kilkenny

178m
2660237CONDITIONAL22 Apr 2026

for Installation/erection of temporary office accommodation, using Portakabin Konstructa modules, on Veolia Water ireland Ltd property

Kilkenny Industrial Business Park , Purcellsinch , Dublin Road Kilkenny.

218m
19515CONDITIONAL23 Jul 2019

for a 10 year planning permission for the construction of a Battery Energy Storage System (BESS). The BESS will consist of: up to 10 no. containerised battery storage modules (up to 14.6m in length, 2.8m in height and 2.4m in width) and ancillary equipment including up to: 14 no. transformers, 28 no. inverters, 14 no. ring main units; a 38kV electrical substation and ESB substation building (10m in length, 6.2m in height and 7.4m in width); electrical equipment building (20m in length, 8.2m in height and 7.4m in width); underground surface water attenuation tank; underground foul storage tank; access and internal circulation road with new junction onto existing IDA private road; 6 no. car parking spaces; landscaped berm wall up to 2m height and native tree and scrub planting, screening wall up to 3m height; 3m high paladin security fence; and all other associated site development works including surface water and foul drainage required to facilitate the development

Indutrial Development Agency (IDA) Business and Technology Park , Purcellsinch , Dublin Road

218m
17772CONDITIONAL22 Nov 2017

retention for material change of use from storage area to office area; located at first floor level to Unit No 8. Retention of 12 No. carparking spaces to the front of Unit No.8. Permission to interconnect Units No 7 and No 8 at first floor level. Retention for material change of use from storage area to office area and staff canteen; located at first floor level to Unit No.7. And all associated site development works

Unit 7 and 8 , K.I.D.C.O. , Purcellsinch Industrial Estate

222m
2334CONDITIONAL15 Feb 2023

for the construction of a truck service and maintenance building, ancillary to existing warehouse and logistics facility, comprising portal frame metal clad structure and including roof mount PV Solar Cells. The development will include relocation of existing car park spaces and all associated siteworks

Purcellsinch Business Park , Kilkenny Road , Kilkenny

223m
2481CONDITIONAL28 Jun 2024

for the construction of a warehouse building on the Northwestern portion of the site of their existing warehouse and logistics facility, comprising a portal frame metal clad structure and including roof mounted PV Solar Cells. The development will include a 2988 m2 ground floor space, loading bay facilities located at the Southeastern end of the building, access through existing site entrance, the closing of the existing entrance to the Northwestern portion of the site, connection to existing services on site, modification to existing concrete yards, relocation of existing car park spaces and all associated site works

Purcellsinch Business Park , Kilkenny Road , Kilkenny

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?